02-7746. Notice of Application Accepted for Filing and Soliciting Comments, Protests, Motions To Intervene, Rcommendations, and Terms and Conditions
-
Start Preamble
March 26, 2002.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: 12147-000.
c. Date filed: January 30, 2002.
d. Applicant: City of Burbank.
e. Name of Project: Valley Power Plant.
f. Location: At the City of Burbank's existing domestic water pumping facility within the City of Burbank, in Los Angeles County, California. The source of water for the conduit is purchased water from the Metropolitan Water District of Southern California taken from the Sacramento and San Joaquin Rivers in California and locally produced groundwater. The project would not occupy Federal or tribal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ronald E. Davis, General Manager, Burbank Water and Power Department, 164 West Magnolia Boulevard, Burbank, CA 91502, (818) 238-3500.
i. FERC Contact: Tom Papsidero, (202) 219-2715.
j. Status of Environmental Analysis: This application is ready for environmental analysis at this time—see the following paragraphs about filing responsive documents.
k. Deadline for filing comments, protests and motions to intervene: April 26, 2002.
All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P-12147-000) on any comments, protests, or motions filed.
The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
l. Description of Project: The purchased water is delivered at higher pressure than the groundwater and blending now requires pressure reducing valves; the city proposes to use a turbine/generator as the primary pressure reducer. The project would consist of two proposed turbine/generator units with a total generating capacity of 300 kilowatts which would be connected to the City of Burbank's existing Valley Pumping Plant. The average annual generation would be 900,000 kilowatthours.
m. Available Locations of Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 208-1371. This filing maybe viewed on http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for assistance). A copy is also available for inspection and reproduction at the address shown in item h above.
Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice.
Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be Start Printed Page 15383served on the applicant(s) named in this public notice.
Protests or Motions to Intervene—Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
Filing and Service of Responsive Documents—The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions.
The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions and prescriptions concerning the application be filed with the Commission within 30 days from the issuance date of this notice. All reply comments must be filed with the Commission within 45 days from the date of this notice.
Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008.
All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” “COMPETING APPLICATION,” “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Start SignatureMagalie R. Salas,
Secretary.
[FR Doc. 02-7746 Filed 3-29-02; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 04/01/2002
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 02-7746
- Pages:
- 15382-15383 (2 pages)
- EOCitation:
- of 2002-03-26
- PDF File:
- 02-7746.pdf