2011-7683. Symbiotics, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Non-Capacity Amendment of License.

    b. Project No.: 11910-016.

    c. Date Filed: March 21, 2011.

    d. Applicant: Symbiotics, LLC.

    e. Name of Project: Applegate Dam Project.

    f. Location: The project is located on the Applegate River, a tributary to the Rogue River, in Jackson County, Oregon.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Brent Smith, Chief Operating Officer, Symbiotics, LLC, P.O. Box 535, Rigby, Idaho 83442; telephone (208) 745-0834.

    i. FERC Contact: Any questions regarding this notice should be directed to Mr. Anthony DeLuca (202) 502-6632 or Anthony.deluca@ferc.gov.

    j. Deadline for filing comments, motions to intervene and protest: April 25, 2011. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov/​docs-filing/​efiling.asp. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments.

    Please include the project number (P-11910-016) on any comments, motions, or recommendations filed.

    k. Description of Request: Amendment to Transmission Line Configuration and Project Boundary: Symbiotics, LLC proposes to bury all 15 miles of transmission lines from the powerhouse to their terminus at small substation in the community of Ruch, Oregon. The proposal would adjust the project's existing right-of-way (ROW) for the project's transmission lines from the above ground corridor to an adjacent subsurface location along Jackson County's utility ROW that follows Upper Applegate Road, Hamilton Road, and State Highway 238.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov/​docs-filing/​efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the Start Printed Page 18212project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: March 25, 2011.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2011-7683 Filed 3-31-11; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/01/2011
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2011-7683
Pages:
18211-18212 (2 pages)
Docket Numbers:
Project No. 11910-016
PDF File:
2011-7683.pdf