Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 1061-103.
c. Date Filed: August 24, 2020.
d. Applicant: Pacific Gas and Electric Company.
e. Name of Project: Phoenix Hydroelectric Project.
f. Location: The existing project is located on the South Fork Stanislaus River and in the Tuolumne River Basin, in Tuolumne County, California. The project occupies 26.99 acres of federal land administered by the U.S. Forest Service and 0.59 acres administered by the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Jan Nimick, Vice President, Power Generation, Pacific Gas and Electric Company, 245 Market Street, San Francisco, CA 94105, (415) 973-0629.
i. FERC Contact: Jim Hastreiter, (503) 552-2760 or james.hastreiter@ferc.gov.
j. Deadline for filing scoping comments: April 26, 2021.
The Commission strongly encourages electronic filing. Please file scoping comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You must include your name and contact information at the end of your comments. For
Start Printed Page 17146assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Phoenix Hydroelectric Project (P-1061-103).
The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. The application is not ready for environmental analysis at this time.
l. The Phoenix Hydroelectric Project consists of the following existing facilities: (1) A 535-foot-long and 132-foot-high concrete arch dam on the South Fork Stanislaus River, (2) a 172.3 acre reservoir, (3) a 133.1-foot-long and 20-foot-high concrete arch cushion dam, (4) a 15.38-mile-long Main Tuolumne Canal, (5) a Header Box (forebay), a 5,611-foot-long penstock, and a powerhouse with an impulse turbine rated at 1.6 megawatts. The project is estimated to generate an average of 9,956 megawatt-hours annually.
m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents via the internet through the Commission's Home Page (http://www.ferc.gov) using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission's Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID-19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TYY, (202) 502-8659.
n. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
o. Scoping Process
Commission staff will prepare either an environmental assessment (EA) or an Environmental Impact Statement (EIS) that describes and evaluates the probable effects, if any, of the licensee's proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commission's scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. Due to restrictions on mass gatherings related to COVID-19, we do not intend to conduct a public scoping meeting and site visit in this case. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 (SD1), issued March 26, 2021.
Copies of the SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission's mailing list and the applicant's distribution list. Copies of SD1 may be viewed on the web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.
Start SignatureDated: March 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-06719 Filed 3-31-21; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 04/01/2021
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2021-06719
- Pages:
- 17145-17146 (2 pages)
- Docket Numbers:
- Project No. 1061-103
- PDF File:
- 2021-06719.pdf