[Federal Register Volume 60, Number 68 (Monday, April 10, 1995)]
[Notices]
[Pages 18092-18093]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-8669]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. RP95-224-000]
ANR Pipeline Co.; Notice of Request for Waiver
April 4, 1995.
Take notice that on March 31, 1995, ANR Pipeline Company (ANR)
requested a waiver of Section 31(c) of its FERC Gas Tariff, Second
Revised Volume No. 1, which requires it place into effect a ``Deferred
Transportation Cost Adjustment'' to be effective May 1, 1995.
ANR states that as originally contemplated, the ``Deferred
Transportation Cost Adjustment'' was intended to track ANR's Account
No. 858 costs over the prior annual period. However, as a result of
orders issued in Docket No. RP94-43-000, the tracker did not go into
effect until January 9, 1995. Therefore, ANR states that pursuant to
its tariff, an adjustment for this short period would reflect actual
cost experience only for the partial month of January 1995. The
remainder of the ``Deferred Transportation Costs'' for the months of
February through April, 1995, would be based on estimates.
ANR states that if the ``Deferred Transportation Cost Adjustment''
were to go into effect on May 1, 1995, based on ANR's estimates, the
charge would result in a rate adjustment to the Mainline Area Access
rate of $.0018 when expressed at a 100% load factor. Other
transportation related services reflect similar rate adjustments.
Rather than implement an adjustment based primarily on estimates, and
make further adjustments to reflect actual experience in subsequent
Deferred Transportation Cost Adjustment filings, [[Page 18093]] ANR has
proposed to defer the reconciliation for this short period until ANR's
next annual filing when actual costs during this period will be known.
ANR states that all of its FERC Gas Tariff, Second Revised Volume
No. 1 customers and interested State Commissions have been mailed a
copy of this filing.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or a protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC.
20426 in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions
or protests should be filed on or before April 11, 1995. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this application are on file with the Commission
and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-8669 Filed 4-7-95; 8:45 am]
BILLING CODE 6717-01-M