96-8909. All Licensees of Reactors With Installed Thermo-Lag Fire Barrier Material; Issuance of Director's Decision Under 10 CFR 2.206  

  • [Federal Register Volume 61, Number 70 (Wednesday, April 10, 1996)]
    [Notices]
    [Pages 16005-16016]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-8909]
    
    
    
    -----------------------------------------------------------------------
    
    
    NUCLEAR REGULATORY COMMISSION
    
    All Licensees of Reactors With Installed Thermo-Lag Fire Barrier 
    Material; Issuance of Director's Decision Under 10 CFR 2.206
    
        Notice is hereby given that the Director, Office of Nuclear Reactor 
    Regulation, has acted on Petitions for action under 10 CFR 2.206 
    received by a letter dated September 26, 1994, from the Citizens for 
    Fair Utility Regulation and the Nuclear Information and Resource 
    Service; by a press release dated October 6, 1994, from the Maryland 
    Safe Energy Coalition; by separate letters dated October 21, 1994, from 
    the GE Stockholders' Alliance and Dr. D. K. Cinquemani; by a letter 
    dated October 25, 1994, from the Toledo Coalition for Safe Energy; by a 
    letter dated October 26, 1994, from R. Benjan; by a letter dated 
    November 14, 1994, from B. DeBolt; and by a letter dated December 8, 
    1994, from the Nuclear Information and Resource Service and the Oyster 
    Creek Nuclear Watch. The Petitioners requested that the U.S. Nuclear 
    Regulatory Commission (NRC) take action with regard to the use of 
    Thermo-Lag by reactor licensees and that their letters be treated as 
    Petitions pursuant to Section 2.206 of Title 10 of the Code of Federal 
    Regulations (10 CFR 2.206).
        The Citizens for Fair Utility Regulation and the Nuclear 
    Information and Resource Service requested (1) Texas Utilities Electric 
    Company, the licensee of Comanche Peak Steam Electric Station, Unit 1, 
    perform additional destructive analysis for Thermo-Lag configurations 
    in proportion to the total installed amount to determine the degree of 
    ``dry joint'' occurrence, (2) the licensee perform fire tests on 
    upgraded ``dry joint'' Thermo-Lag configurations for conduit and cable 
    trays to rate the barrier as a tested configuration in compliance with 
    fire protection regulations, and (3) the NRC immediately suspend the 
    Comanche Peak Unit 1 license until the above listed corrective actions 
    are taken. The Maryland Safe Energy Coalition requested immediate 
    shutdown of both reactors at the Peach Bottom plant until the risk of 
    fire near electrical control cables due to combustible insulation is
    
    [[Page 16006]]
    
    corrected. Dr. Cinquemani and the Toledo Coalition for Safe Energy 
    requested that the NRC immediately shut down all reactors where Thermo-
    Lag is used until it has been removed and replaced. The GE 
    Stockholders' Alliance requested shutdown of all reactors where Thermo-
    Lag is used until it has been removed and replaced with fire-retardant 
    material meeting NRC standards. R. Benjan requested immediate shutdown 
    of all reactors where Thermo-Lag is used. B. DeBolt requested shutdown 
    of all reactors in which Thermo-Lag is used until it has been removed 
    and replaced. The Nuclear Information and Resource Service and the 
    Oyster Creek Nuclear Watch requested that NRC immediately suspend GPU 
    Nuclear Corporation's (GPUN's) operating license for Oyster Creek 
    Nuclear Generating Station (OCNGS) until GPUN removes Thermo-Lag fire 
    barrier material and replaces it with a competitive product that meets 
    current NRC fire protection regulations.
        The Director of the Office of Nuclear Reactor Regulation has 
    determined that these requests should be denied for the reasons stated 
    in the ``Director's Decision Under 10 CFR 2.206'' (DD-96-03), the 
    complete text of which follows this notice, and which is available for 
    public inspection at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, N.W., Washington, D.C., and at the Local 
    Public Document Room for the named facilities.
        A copy of this Decision has been filed with the Secretary of the 
    Commission for the Commission's review in accordance with 10 CFR 
    2.206(c) of the Commission's regulations. As provided by this 
    regulation, this Decision will constitute the final action of the 
    Commission 25 days after the date of issuance unless the Commission, on 
    its own motion, institutes review of the Decision within that time.
    
        Dated at Rockville, Maryland, this 3rd day of April, 1996.
    
        For the Nuclear Regulatory Commission.
    William T. Russell,
    Director, Office of Nuclear Reactor Regulation.
    
    Appendix A to This Document: Director's Decision Under 10 CFR 2.206
    
    DD-96-03
    
    I. Introduction
    
        By letter dated September 26, 1994, the Citizens for Fair Utility 
    Regulation and the Nuclear Information and Resource Service (NIRS); by 
    press release dated October 6, 1994, the Maryland Safe Energy 
    Coalition; by separate letters dated October 21, 1994, the GE 
    Stockholders' Alliance and Dr. D. K. Cinquemani; by letter dated 
    October 25, 1994, the Toledo Coalition for Safe Energy; by letter dated 
    October 26, 1994, R. Benjan; by letter dated November 14, 1994, B. 
    DeBolt; and by letter dated December 8, 1994, NIRS and the Oyster Creek 
    Nuclear Watch (the Petitioners), requested that the U.S. Nuclear 
    Regulatory Commission (NRC) take action with regard to the use of 
    Thermo-Lag by reactor licensees and that their letters be treated as 
    Petitions pursuant to Section 2.206 of Title 10 of the Code of Federal 
    Regulations (10 CFR 2.206).
        The Citizens for Fair Utility Regulation and NIRS requested that 
    (1) Texas Utilities Electric Company (TU Electric), licensee of 
    Comanche Peak Steam Electric Station, Unit 1, perform additional 
    destructive analysis for Thermo-Lag configurations in proportion to the 
    total installed amount of Thermo-Lag to determine the degree of ``dry 
    joint'' occurrence, (2) the licensee perform fire tests on upgraded 
    ``dry joint'' Thermo-Lag configurations for conduit and cable trays to 
    rate the barrier as a tested configuration in compliance with fire 
    protection regulations, and (3) the NRC immediately suspend the 
    Comanche Peak Unit 1 license until the above corrective actions are 
    taken. The Maryland Safe Energy Coalition requested immediate shutdown 
    of both reactors at the Peach Bottom plant until the risk of fire near 
    electrical control cables due to combustible insulation is 
    corrected.1 Dr. Cinquemani and the Toledo Coalition for Safe 
    Energy requested that the NRC immediately shut down all reactors where 
    Thermo-Lag is used until it has been removed and replaced. The GE 
    Stockholders' Alliance requested shutdown of all reactors where Thermo-
    Lag is used until it has been removed and replaced with fire-retardant 
    material meeting NRC standards. R. Benjan requested immediate shutdown 
    of all reactors where Thermo-Lag is used. B. DeBolt requested shutdown 
    of all reactors in which Thermo-Lag is used until it has been removed 
    and replaced. NIRS and the Oyster Creek Nuclear Watch requested that 
    NRC immediately suspend GPU Nuclear Corporation's (GPUN's) operating 
    license for Oyster Creek Nuclear Generating Station (OCNGS) until GPUN 
    removes Thermo-Lag fire barrier material and replaces it with a 
    competitive product that meets current NRC fire protection regulations.
    
        \1\ The Petition submitted by the Maryland Safe Energy Coalition 
    expressed several concerns in addition to the fire hazard issue. 
    These other issues, that is other than the fire hazard issue, will 
    be the subject of a separate Director's Decision.
    ---------------------------------------------------------------------------
    
        As a basis for their requests concerning Thermo-Lag 330-1 fire 
    barrier upgrades, the Citizens for Fair Utility Regulation and NIRS 
    Petitioners stated that (1) the licensee's records on the original 
    installation of Thermo-Lag fire barriers on conduits and cable trays 
    indicate that its contractor followed specifications for pre-buttering 
    all joints; (2) NRC Inspection Reports 50-455/93-42 and 50-446/93-42 
    found, based on destructive analysis documents, that a concern did 
    exist where Thermo-Lag conduit joints fell apart easily and did not 
    appear to have any residual material of a buttered surface, indicative 
    of a joint that had not been pre-buttered; (3) the ``dry joint'' 
    deficiency appeared in Room 115A and other areas of the unit; (4) the 
    licensee directly contradicts an NRC inspector's findings that were 
    determined in part by destructive analysis; (5) the ``dry joint'' or 
    absence of pre-buttering of Thermo-Lag panels can be determined only by 
    destructive analysis and cannot be determined by a walkdown visual 
    inspection; (6) the findings reported in the Comanche Peak Unit 1 
    Region IV Inspection Reports 50-455/93-42 and 50-446/93-42, based on 
    the limited amount of destructive analysis conducted at the unit, 
    constitute a substantial documentation of installation deficiencies 
    found in Thermo-Lag fire barriers as documented in NRC Information 
    Notice (IN) 91-79, ``Deficiencies in the Procedures for Installing 
    Thermo-Lag Fire Barrier Materials,'' December 6, 1991, and IN 91-79, 
    Supplement 1, ``Deficiencies Found in Thermo-Lag Fire Barrier 
    Installation,'' August 4, 1994; (7) neither the NRC nor the industry, 
    by its agent Nuclear Energy Institute (NEI), nor a utility, have 
    conducted fire tests on dry-fitted or ``dry joint'' upgraded 
    configurations of Thermo-Lag 330-1; and (8) the presence of ``dry 
    joint'' upgraded configurations in Comanche Peak Unit 1 constitutes an 
    untested application of Thermo-Lag fire barriers.
        As a basis for the requests concerning Thermo-Lag 330-1 fire 
    barrier upgrades, the Maryland Safe Energy Coalition stated that the 
    manufacturer of the flame retardant (Thermo-Lag insulation) was 
    indicted on criminal charges (of falsifying tests of the effectiveness 
    of the insulation as a fire barrier), and fire near the electrical 
    control cables, due to combustible Thermo-Lag insulation, could cause a 
    catastrophic meltdown.
        As the bases for their requests, Dr. Cinquemani, the Toledo 
    Coalition for
    
    [[Page 16007]]
    Safe Energy, the GE Stockholders' Alliance, and R. Benjan stated either 
    individually or collectively that (1) the widespread use of Thermo-Lag 
    in more than 70 reactors presents a safety crisis; (2) the NRC has 
    known since 1982 that Thermo-Lag fails NRC performance standards for 
    material that protects vital electrical cables for ampacity rating and 
    fire resistance; (3) Thermo-Lag has failed not only NRC tests, but 
    almost all other independent tests; (4) Thermo-Lag is combustible, 
    contrary to NRC regulations, and is an ineffective fire barrier; (5) 
    the use of Thermo-Lag could lead to shorts, to failure of the cables in 
    an emergency, and to fire; (6) Thermo-Lag is faulty in that fraudulent 
    ampacity ratings allowed utilities to use smaller cable than permitted 
    by design requirements, causing the cable to overheat and its 
    insulation to deteriorate; (7) the NRC has stated that fire at some 
    nuclear power plants can contribute as much as 50 percent of the risk 
    to a core meltdown, and a typical reactor will have three to four 
    significant fires during its licensed lifetime; (8) Thermal Science, 
    Inc. (TSI), the manufacturer of Thermo-Lag, and its President were 
    indicted by a Federal grand jury on seven criminal charges related to 
    conspiracy to defraud the U.S. Government in regard to the 
    effectiveness of Thermo-Lag; and (9) the hourly fire watches at the 
    Davis-Besse Nuclear Power Plant operated by Toledo Edison do not 
    replace fire barrier material and do not prevent fires.
        As the bases for his request, B. DeBolt stated that Thermo-Lag 
    fails to meet NRC regulations concerning combustibility and that the 
    manufacturer of Thermo-Lag was indicted for defrauding the Government 
    and the utilities. Among the many bases for their request, NIRS and the 
    Oyster Creek Nuclear Watch stated that (1) Southwest Research Institute 
    (SwRI) conducted fire tests on Thermo-Lag 330-1 specimens for GPUN and 
    reported that all specimens ignited approximately 2 seconds after it 
    was inserted into the furnace and failed specified criteria because of 
    flaming after the first 30 seconds of testing, an outside temperature 
    rise higher than 30  deg.C, and a weight loss of 50 percent; (2) GPUN's 
    operation of OCNGS with knowledge of the SwRI report is an example of 
    GPUN's reckless disregard for fire protection and public safety; (3) in 
    the event of fire, Thermo-Lag is likely to fail its intended function 
    of protecting vital electrical cables running from the control room to 
    plant safety systems used to shut down the reactor; (4) current 
    installations of Thermo-Lag are likely to fail in less time than 1 hour 
    (when smoke detectors and automatic sprinkler systems are present) or 3 
    hours (when there are no fire detection and suppression systems) that 
    NRC regulations require for fire barriers to withstand fire; (5) the 
    NRC Inspector General issued a report in August 1992 condemning NRC's 
    handling of the Thermo-Lag issue and documenting the NRC staff's 
    failure to understand the scope of the problem; (6) in April 1994, 
    Industrial Testing Laboratories and its President pleaded guilty to 
    five felony counts of aiding and abetting the distribution of falsified 
    test data; (7) on September 29, 1994, the U.S. Department of Justice 
    issued a seven-count indictment against the manufacturer of Thermo-Lag 
    and its Chief Executive Officer for willful violations of the Atomic 
    Energy Act, conspiracy to conceal material facts, and making false 
    statements to defraud the United States in connection with $58 million 
    in fire barrier material; (8) GPUN has known since at least August 11, 
    1992, that Thermo-Lag 330-1 as a structural base material is 
    combustible and that GPUN was in violation of Appendices A and R to 10 
    CFR Part 50 and the NRC Standard Review Plan, NUREG-0800; (9) GPUN 
    failed to report the SwRI test results in response to a request for 
    additional information regarding Generic Letter (GL) 92-08 (``Thermo-
    Lag 330-1 Fire Barriers'') of February 10, 1994, when asked to describe 
    the Thermo-Lag 330-1 fire barriers installed as required to meet 10 CFR 
    Part 50, Appendix R; and (10) continued reliance on fire watches at 
    OCNGS is an unreasonable and unnecessary hazard to the public health 
    and safety because of an inoperable fire protection system for safe 
    shutdown of the reactor and installed combustible material on the 
    shutdown systems.
        On November 7, 1994, I informed the Citizens for Fair Utility 
    Regulation and NIRS that the request for an immediate suspension of the 
    Comanche Peak Unit 1 operating license was denied. On December 2, 1994, 
    I informed the Maryland Safe Energy Coalition that the request for an 
    immediate shutdown of the Peach Bottom plant and for an immediate 
    suspension of the Peach Bottom license was denied. On December 15, 
    1994, I informed the GE Stockholders Alliance, Dr. D. K. Cinquemani, 
    the Toledo Coalition for Safe Energy, and R. Benjan that the immediate 
    suspension of the operating licenses of all reactors where Thermo-Lag 
    is used was denied. On January 3, 1995, I informed NIRS and the Oyster 
    Creek Nuclear Watch that the immediate suspension of the OCNGS 
    operating license was denied. On January 19, 1995, I informed B. DeBolt 
    that the request for immediate suspension of the operating licenses of 
    all reactors in which Thermo-Lag is used was denied. The decisions were 
    based on the following: (1) the staff is addressing deficiencies in 
    fire barriers constructed with Thermo-Lag material as part of a 
    Commission-approved action plan and has issued several bulletins and a 
    generic letter to the nuclear industry to provide information and 
    guidance, (2) fire barrier systems constructed with Thermo-Lag have 
    been identified and declared inoperable, and (3) compensatory measures 
    (fire watches) approved by the NRC have been instituted. Additionally 
    in the above correspondence, all Petitioners were informed that the 
    Petitions were being treated pursuant to 10 CFR 2.206 and had been 
    referred to this office for action pursuant to 10 CFR 2.206 of the 
    Commission's regulations and that appropriate action would be taken 
    within a reasonable time.
        For the reasons stated below, the Petitions have been denied.
    
    II. Background
    
        The picture painted by the Petitioners of inaction by the NRC staff 
    in responding to the issues presented by the use of Thermo-Lag is at 
    odds with the facts. A review of the chronological development of the 
    issues shows that the NRC staff has been working diligently to resolve 
    the issues and has consistently sought to ensure that there is adequate 
    protection of the public health and safety. It is also inaccurate to 
    contend that Thermo-Lag generic deficiencies have been known since 
    1982. As can be seen from the following information, the development of 
    the Thermo-Lag issue has been evolutionary. Reports of problems 
    regarding Thermo-Lag began to surface in the late 1980s when Gulf 
    States Utilities, the licensee for River Bend Station, discovered some 
    cracks and wear damage due to installation deficiencies (Licensee Event 
    Report 87-005, March 25, 1987) and declared the material inoperable as 
    a fire barrier. The licensee further discovered that stress skin was 
    missing on all 3-hour Thermo-Lag fire barriers in the turbine building 
    as a result of an installation error. In a series of plant-specific 
    tests performed by Gulf States Utilities in 1989, Thermo-Lag barriers 
    failed to meet the fire endurance test acceptance criteria. Gulf States 
    Utilities categorized all 1-hour and 3-hour barriers as indeterminate 
    and implemented compensatory measures in the form of fire watches.
    
    [[Page 16008]]
    Other isolated plant-specific fire protection problems had been found 
    during NRC inspections at various utilities as early as 1982 and had 
    been acted on by the NRC staff. These problems were treated as plant-
    specific issues and were not considered as indications of generic 
    problems.
        In February 1991, the NRC received allegations that Thermo-Lag did 
    not provide fire protection for electrical cables as claimed by the 
    vendor. In response, in May 1991, the NRC visited River Bend Station to 
    review the installation procedures and the failed fire endurance tests 
    and concluded that a generic concern existed with 30-inch-wide cable 
    trays. The NRC alerted the industry of the results of the test failures 
    in IN 91-47, ``Failure of Thermo-Lag Fire Barrier Material To Pass Fire 
    Endurance Test,'' August 6, 1991.
        In June 1991, the Office of Nuclear Reactor Regulation (NRR) 
    established a special review team to investigate the safety 
    significance and generic applicability of technical issues regarding 
    allegations and operating experience concerning Thermo-Lag fire 
    barriers. In its final report, which was issued with IN 92-46, 
    ``Thermo-Lag Fire Barrier Material Special Review Team Final Report 
    Findings, Current Fire Endurance Testing, and Ampacity Calculation 
    Errors,'' June 23, 1992, the special review team reached the following 
    conclusions:
         The fire-resistive ratings and the ampacity derating 
    factors for the Thermo-Lag fire barrier system were indeterminate.
         Some licensees had not reviewed and evaluated the fire 
    endurance test results and the ampacity derating test results used as 
    the licensing basis for their Thermo-Lag barriers to determine the 
    validity of the tests and the applicability of the test results to 
    their plant designs.
         Some licensees had not reviewed the Thermo-Lag fire 
    barriers installed in their plants to ensure that they met NRC 
    requirements and guidance, such as that provided in GL 86-10, 
    ``Implementation of Fire Protection Requirements,'' April 24, 1986.
         Some licensees used inadequate or incomplete installation 
    procedures during the construction of their Thermo-Lag barriers.
        After the special review team completed its charter, the NRC staff 
    prepared an action plan that provided a process to resolve technical 
    issues identified with Thermo-Lag fire barrier systems. The NEI, 
    formerly the Nuclear Management and Resources Council (NUMARC), agreed 
    to coordinate industry efforts to resolve the issues.
        In regard to the Petitioners' allegations of NRC's inaction in 
    responding to the issues presented by the use of Thermo-Lag, the 
    significant progress made by the NRC staff and the nuclear reactor 
    licensees in resolving Thermo-Lag issues speaks to the contrary. The 
    NRC staff has issued a number of generic communications related to 
    Thermo-Lag, which include the following: (1) two bulletins: BUL 92-01, 
    ``Failure of Thermo-Lag 330 Fire Barrier System To Maintain Cabling in 
    Wide Cable Trays and Small Conduits Free From Fire Damage,'' June 24, 
    1992, and BUL 92-01, Supplement 1, ``Failure of Thermo-Lag 330 Fire 
    Barrier System To Perform Its Specified Fire Endurance Function,'' 
    August 28, 1992; (2) two generic letters: GL 92-08, ``Thermo-Lag 330-1 
    Fire Barriers,'' December 17, 1992, and GL 86-10, Supplement 1, ``Fire 
    Endurance Test Acceptance Criteria for Fire Barrier Systems Used To 
    Separate Redundant Safe Shutdown Trains Within the Same Fire Area,'' 
    March 25, 1994; and (3) 12 information notices: IN 91-47; IN 91-79; IN 
    91-79, Supplement 1; IN 92-46; IN 92-55, ``Current Fire Endurance Test 
    Results for Thermo-Lag Fire Barrier Material,'' July 27, 1992; IN 92-
    82, ``Results of Thermo-Lag 330-1 Combustibility Testing,'' December 
    15, 1992; IN 94-22, ``Fire Endurance and Ampacity Derating Test Results 
    for 3-Hour Fire-Rated Thermo-Lag 330-1 Fire Barriers,'' March 16, 1994; 
    IN 94-86, ``Legal Actions Against Thermal Science, Inc., Manufacturer 
    of Thermo-Lag,'' December 22, 1994; IN 95-27, ``NRC Review of Nuclear 
    Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation 
    Methodology Plant Screening Guide,'' May 31, 1995; IN 95-32, ``Thermo-
    Lag 330-1 Flame Spread Test Results,'' August 10, 1995; IN 95-49, 
    ``Seismic Adequacy of Thermo-Lag Panels,'' October 27, 1995, and IN 94-
    86, Supplement 1, ``Legal Actions Against Thermal Science, Inc., 
    Manufacturer of Thermo-Lag,'' November 15, 1995.
        The NRC staff, the nuclear industry, and others have expended much 
    time and many resources to address and resolve the Thermo-Lag issues. 
    The NRC staff developed comprehensive fire test guidance and acceptance 
    criteria and worked with industry to improve existing ampacity test 
    procedures. The NRC staff and industry performed about 100 fire 
    endurance and ampacity derating tests of Thermo-Lag fire barrier 
    materials and full-scale test assemblies. The fire endurance tests 
    established the limitations and the true fire-resistive capabilities of 
    certain Thermo-Lag fire barrier configurations, without relying on the 
    fire endurance test data supplied by TSI, the manufacturer of Thermo-
    Lag. On the basis of some of these tests, the NRC staff concluded that 
    existing Thermo-Lag barriers could be upgraded with some additional 
    Thermo-Lag material to satisfy NRC regulations. Precluding all use of 
    Thermo-Lag materials for current and future fire barrier installations 
    would remove a realistic option for resolving safety issues. Therefore, 
    the NRC staff does not object to the use of Thermo-Lag in specific 
    applications, where, through upgrades, NRC requirements are satisfied. 
    The NRC staff issued three requests for additional information (RAIs) 
    regarding GL 92-08 to each licensee using Thermo-Lag to obtain 
    information on the specific Thermo-Lag material installed at each 
    plant. The NRC staff reviewed and approved comprehensive Thermo-Lag 
    fire barrier programs proposed by TU Electric for Comanche Peak Steam 
    Electric Station, Unit 2, and by Tennessee Valley Authority (TVA) for 
    Watts Bar Nuclear Power Plant, Unit 1, which attests to the fact that 
    Thermo-Lag barriers can meet NRC fire protection guidelines and 
    requirements. The NRC staff completed toxicity tests of Thermo-Lag 
    material. The NRC staff and the industry completed chemical 
    composition, combustibility, and flame spread tests of Thermo-Lag 
    materials. Finally, the NRC staff reassessed previous technical 
    conclusions to determine the extent to which the NRC staff and industry 
    relied on information supplied by TSI to reach these conclusions. The 
    staff had concerns about the reliability of information and data 
    supplied by TSI that have been or could be used to make judgments 
    regarding Thermo-Lag materials. The NRC staff identified and 
    categorized the issues and previous conclusions and used the results of 
    the industry-wide testing program regarding the chemical composition of 
    Thermo-Lag, as discussed below, to determine if the in-plant Thermo-Lag 
    materials were consistent. The results of this reassessment indicated 
    that previous technical conclusions were valid independent of the 
    information provided by TSI. The staff therefore concluded that 
    additional action to reassess the issues or reverify the previous 
    conclusions was not needed.
        The NEI testing program on the chemical composition of Thermo-Lag 
    analyzed samples from 18 utilities representing 25 nuclear power 
    plants. The samples represented Thermo-Lag material manufactured 
    between 1984 and 1995. NEI performed pyrolysis gas
    
    [[Page 16009]]
    chromatography evaluation of 169 samples to assess organic chemical 
    composition and performed energy-dispersive X-ray spectroscopy of 33 
    samples to assess inorganic chemical composition. On the basis of the 
    tests, NEI concluded that (1) all of the samples contained the 
    constituents identified by TSI as essential to fire barrier 
    performance; (2) the composition of the samples was consistent; and (3) 
    the test results provided a basis on which to close NRC questions about 
    chemical composition and product consistency and for utility use of 
    generic test data relative to fire endurance ratings, flame spread, 
    heat release, ampacity derating, and other material properties.
        The NRC staff test program on the chemical composition of Thermo-
    Lag was conducted by the National Institute of Standards and Technology 
    (NIST) during 1992 and 1995. NIST analyzed 21 samples that were either 
    collected by the staff during site visits to plants and test 
    laboratories or provided by TVA, Gulf States Utilities, Commonwealth 
    Edison Company, and NEI. The analysis included elemental and ammonia 
    analysis, pyrolysis, gas chromatography, mass spectrometry, and X-ray 
    fluorescence. These analytical techniques indicated that all of the 
    samples were similar in their bulk chemical composition. These results 
    were consistent with the results of the NEI chemical testing program 
    pertaining to the chemical composition and uniformity of Thermo-Lag.
        Industry-wide progress has generally been commensurate with the 
    complexity of the plant-specific issues and the amounts of Thermo-Lag 
    installed at the individual plants. Several licensees have initiated 
    programs to replace Thermo-Lag and are performing plant-specific tests 
    of other fire barrier materials such as Mecatiss (Florida Power & Light 
    for Crystal River Unit 3) and Darmatt KM-1 (Carolina Power & Light for 
    Brunswick, IES Utilities, Inc., for Duane Arnold Energy Center, 
    Commonwealth Edison Company for LaSalle County Station, and Northern 
    States Power Company for Prairie Island Nuclear Generating Plant). The 
    NRC staff is reviewing the plant-specific fire endurance test programs 
    and has recently approved the plant-specific application of Darmatt KM-
    1 fire barrier at the LaSalle plant. The remaining licensees have 
    submitted to the NRC staff detailed plans and schedules for resolving 
    the issues at their plants. Most licensees are pursuing a combination 
    of such options as upgrading existing Thermo-Lag fire barriers to meet 
    NRC fire barrier requirements, replacing Thermo-Lag fire barriers with 
    another type of fire barrier, reducing or eliminating reliance on 
    Thermo-lag fire barriers by relocating equipment and cables and by 
    post-fire safe-shutdown reanalysis, installing additional fire 
    protection features such as automatic sprinkler systems, and requesting 
    configuration-specific exemptions when such exemptions are allowed by 
    NRC regulations and are technically justified to provide a level of 
    safety equivalent to that prescribed by the regulations. The NRC staff 
    has completed its review of the plans for resolving fire protection 
    issues that were proposed by most of the licensees. As with any issues 
    as technically complex, challenging, and resource intensive as those 
    presented by Thermo-Lag barriers, some plant-specific questions remain. 
    However, the number of issues has steadily declined. The NRC staff and 
    the licensees will continue to address the residual questions on a 
    case-by-case basis as they arise, and the NRC staff will continue to 
    follow up with individual licensees on their corrective actions, as 
    appropriate. Every licensee with Thermo-Lag fire barriers will continue 
    to maintain NRC-approved compensatory measures, such as fire watches, 
    until its permanent corrective actions are implemented. Therefore, the 
    public health and safety are protected.
        The NRC's ``defense-in-depth'' fire protection concept relies on 
    protecting safe shutdown functions by achieving a balance among three 
    echelons or levels of protection, which are (1) fire prevention 
    activities; (2) the ability to rapidly detect, control, and suppress a 
    fire; and (3) physical separation of redundant safe shutdown functions. 
    Weaknesses found in one area may be dealt with by enhancing the 
    protection capabilities of the remaining areas.2 The NRC foresaw 
    cases in which fire protection features would be inoperable and 
    required licensees, through technical specifications or approved fire 
    protection plans controlled by license conditions, to provide 
    compensation for the deficient condition. The concept of allowing 
    alternative actions to compensate for an inoperable condition or 
    component is used in various programs associated with the operation of 
    nuclear power plants and has long been an integral part of NRC 
    regulatory requirements.3
    
        \2\ The ``defense-in-depth'' concept is detailed in the ``NRC 
    Standard Review Plan,'' NUREG-0800, Section 9.5.1, ``Fire Protection 
    Program,'' page 9.5.1-10.
        \3\ NRC GL 91-18, ``Information to Licensees Regarding Two NRC 
    Manual Sections on Resolution of Degraded and Nonconforming 
    Conditions and Operability,'' issued November 7, 1991, and NRC 
    Inspection Manual, Part 9900, ``Resolution of Degraded and 
    Nonconforming Conditions,'' issued October 31, 1991.
    ---------------------------------------------------------------------------
    
        The fire endurance test results contained in NRC BUL 92-01 and NRC 
    BUL 92-01, Supplement 1, confirmed that certain Thermo-Lag fire barrier 
    configurations compromise one facet of the fire protection defense-in-
    depth concept. In response to NRC BUL 92-01 and its supplement, the 
    licensees for plants using Thermo-Lag fire barriers established fire 
    watches in accordance with their technical specifications or license 
    conditions as a compensatory measure. Fire watches are personnel 
    trained by the licensees to inspect for the control of ignition 
    sources, fire hazards, and combustible materials; to look for signs of 
    incipient fires; to provide prompt notification of fire hazards and 
    fires; and to take appropriate actions to begin fire suppression 
    activities. Generally, therefore, by providing additional fire 
    prevention activities through enhanced detection capabilities to find 
    fire hazards and in the case of a fire, augmented suppression 
    activities before a barrier's ability to endure a fire is challenged, 
    fire watches compensate for degraded fire barriers.
        The NRC staff has carefully evaluated the issues associated with 
    continued use of Thermo-Lag material, including the use of fire watches 
    to compensate for any degradation in the effectiveness of required fire 
    barriers. Such compensatory actions provide an adequate level of fire 
    protection without an undue risk to the health and safety of the 
    public. Licensees have established fire watches to compensate for 
    degraded and possibly inoperable fire barriers. Also, licensees rely on 
    a defense-in-depth concept that incorporates multiple safety measures. 
    Automatic fire detection and suppression systems are provided in most 
    areas that have safe shutdown equipment. Trained fire brigades are 
    required 24 hours a day at all plants. All areas that have safe 
    shutdown equipment have manual fire suppression features. Fuels that 
    can feed a fire and ignition sources to start a fire are controlled. 
    The combination of fire watches and the defense-in-depth fire 
    protection features provides an adequate level of fire protection until 
    licensees implement permanent corrective actions.
        Taken together, these factors represent an adequate means of fire 
    protection at the plants using Thermo-Lag to ensure, with margin,4 
    that operation can be
    
    [[Page 16010]]
    conducted without an undue risk to the health and safety of the public. 
    Nevertheless, with these considerations in mind, the NRC staff 
    addressed below the Petitioners' specific concerns to demonstrate that 
    no substantial health and safety issue has been raised.
    
        \4\ The fact that Thermo-Lag barriers, as installed, will 
    provide protection for some period of time is supported by, among 
    others, the fire endurance test results documented in IN 92-55.
    ---------------------------------------------------------------------------
    
    III. Response to Specific Concerns
    
        The Petitioners alleged that (1) the NRC has been slow to enforce 
    its own regulations, (2) fire watches do not replace fire barriers and 
    continued reliance on fire watches is an unreasonable and unnecessary 
    hazard to the public health and safety because of an inoperable fire 
    protection system for safe shutdown of the reactor and installed 
    combustible material on the shutdown systems, (3) utilities are in 
    violation of NRC requirements because Thermo-Lag is combustible and 
    could contribute to a fire instead of protecting from it, and, in spite 
    of the danger, the NRC allows continued use of Thermo-Lag, (4) faulty 
    ampacity ratings could result in the use of inappropriate cables, 
    which, if undersized, could overheat and cause its insulation to 
    deteriorate, (5) the licensee for Oyster Creek did not report to the 
    NRC its findings regarding the combustibility of Thermo-Lag and, (6) 
    the Thermo-Lag barriers have been improperly installed at Comanche Peak 
    Unit 1, which contributes further to the poor performance of Thermo-
    Lag.
        The NRC staff acknowledged and has stated that certain Thermo-Lag 
    fire barrier configurations have failed to demonstrate the ability to 
    perform their fire resistance functions. In this regard, the NRC staff, 
    in BUL 92-01, Supplement 1, has stated that Thermo-Lag fire barriers 
    should be treated as inoperable until licensees can declare the fire 
    barriers operable on the basis of successful, applicable tests. Given 
    the foregoing deficiencies identified for Thermo-Lag, the NRC staff 
    concluded that compensatory measures are necessary until a licensee can 
    declare fire barriers operable on the basis of applicable tests that 
    demonstrate successful barrier performance.
        The Petitioners also asserted that (1) the NRC should have 
    protected the public and not Rubin Feldman, the President of the 
    company manufacturing Thermo-Lag, and (2) public safety has been 
    compromised by NRC's seeming complicity with utilities.5
    
        \5\ These statements could be interpreted as the appearance of 
    unwarranted favoritism toward the manufacturer of Thermo-Lag and 
    complicity with utilities. Therefore, the Petitions were referred to 
    the NRC Office of the Inspector General.
    ---------------------------------------------------------------------------
    
    A. Regulatory Compliance
    
        The NRC staff acknowledges that certain fire endurance tests have 
    demonstrated that Thermo-Lag barriers may not meet the fire endurance 
    rating criteria set forth in Section III.G. of Appendix R to 10 CFR 
    Part 50. This acknowledgment does not mean, however, that there no 
    longer is reasonable assurance of protection of the public health and 
    safety or that such actions as the shutdown of all reactors using 
    Thermo-Lag and the suspension of Comanche Peak, Peach Bottom, and 
    Oyster Creek operating licenses are warranted.
        It should first be noted that Appendix R, which sets forth criteria 
    for specific fire protection features to protect safe shutdown systems, 
    is applicable only to facilities that commenced operation prior to 
    1979. Facilities commencing operation on or after January 1, 1979, 
    although not bound by Appendix R, generally are bound by licensing 
    commitments to follow the criteria set forth in Appendix R through 
    license conditions.6
    
        \6\ In addition, there are a very limited number of plants which 
    commenced operation on or after January 1, 1979, that are not 
    subject to specific license conditions but whose licensees have made 
    commitments to comply with NRC fire protection requirements, 
    including Section III.G. of Appendix R. The NRC is elevating these 
    commitments to license conditions.
    ---------------------------------------------------------------------------
    
        Even assuming that all of the plants in which Thermo-Lag is 
    installed and that commenced operation prior to 1979 are not in 
    compliance with Appendix R, it does not follow that the failure to 
    comply with a regulation indicates the absence of adequate protection. 
    The Commission has explained that--
    
        [W]hile it is true that compliance with all NRC regulations 
    provides reasonable assurance of adequate protection of the public 
    health and safety, the converse is not correct, that failure to 
    comply with one regulation or another is an indication of the 
    absence of adequate protection, at least in a situation where the 
    Commission has reviewed the noncompliance and found that it does not 
    pose an ``undue risk'' to the public health and safety.
    
    (Ohio Citizens for Responsible Energy, DPRM 88-4, 28 NRC 411 
    (1988).)
    
        All the plants using Thermo-Lag have instituted fire watches as 
    required by their action statements regarding inoperable barriers 
    contained in their technical specifications or fire protection programs 
    subject to license conditions. Generally, action statements provide 
    alternative remedial actions to shutting down a plant when limiting 
    conditions for operation are not met. Compliance with the required 
    remedial actions provides reasonable assurance that the public health 
    and safety is protected notwithstanding the plant's continued operation 
    and its failure to meet the respective limiting condition for 
    operation. Here, since all of the plants using Thermo-Lag have 
    implemented the required fire watches in accordance with plant-specific 
    requirements, their continued operation does not pose an undue risk to 
    the public health and safety.
        The Petitioners assert that fire watches do not replace fire 
    barriers and continued reliance on fire watches is a hazard to public 
    safety. The NRC staff acknowledges that fire watches do not replace 
    fire barriers. However, as will be discussed in greater detail later in 
    this Decision, fire watches are judged by the NRC to be acceptable 
    compensatory measures and are legally sanctioned remedial actions based 
    on 10 CFR 50.36(c)(2).7
    
        \7\ In instances in which fire protection programs have been 
    moved from technical specifications and are now subject to license 
    conditions, the NRC's approval of the fire protection programs 
    subject to license conditions provides the legal basis for the 
    implementation of fire watches as a remedial measure.
    ---------------------------------------------------------------------------
    
        In sum, notwithstanding the failure to have operable fire barriers 
    meeting the fire endurance rating criteria specified by Section III.G. 
    of Appendix R, a plant is not necessarily unsafe to continue operation. 
    To the contrary, fire watches are judged by the NRC to be adequate 
    remedial measures that provide reasonable assurance that the public 
    health and safety is protected. By reason of compliance by all 
    facilities using Thermo-Lag with their technical specifications or fire 
    protection program action statements requiring the implementation of 
    fire watches, protection of the public health and safety is still 
    reasonably ensured for such plants. Because the Commission has 
    discretion regarding enforcement of its regulations, and given the 
    circumstances here in which no significant health and safety issues 
    have been raised, enforcement action of the nature requested by the 
    Petitioners is not warranted.
    
    B. Ability of Fire Watches to Compensate for a Degraded Barrier
    
        One of the Petitioners' allegations is that the measures taken by 
    licensees to compensate for degraded barrier conditions, specifically 
    fire watches, are not adequate to protect the public health and safety. 
    The Petitioners have questioned the continued reliance on fire watches 
    in the light of an inoperable fire protection system for safe plant 
    shutdown and the combustibility of Thermo-Lag. In addition, the 
    Petitioners
    
    [[Page 16011]]
    claim that a fire watch does not replace a fire barrier in that fire 
    watches are not preventive.
        Despite the acknowledged shortcomings identified with certain 
    Thermo-Lag fire barriers and after fully considering the arguments 
    presented by the Petitioners regarding the ability of fire watches to 
    provide adequate compensation, the NRC staff has determined that 
    compensatory measures using fire watches are adequate and acceptable to 
    ensure public health and safety until permanent corrective measures are 
    implemented.
        The use of fire watches in instances of degraded or inoperable 
    barriers is an integral part of NRC-approved fire protection programs. 
    In general, these NRC staff-approved compensatory measures specify the 
    establishment of a continuous fire watch or an hourly fire watch in 
    cases in which automatic detection systems protect the affected 
    components. Although it is true that Thermo-Lag is intended as a 
    barrier and fire watch personnel cannot act as physical shields, a fire 
    watch provides more than simply a detection function. Personnel 
    assigned to fire watches are trained by the licensee to inspect for the 
    control of ignition sources, fire hazards, and combustible materials; 
    to look for signs of incipient fires; to provide prompt notification of 
    fire hazards and fires; and to take appropriate action to begin fire 
    suppression activities. Fire watch personnel are capable of determining 
    the size, the actual location, the source, and the type of fire--
    valuable information that cannot be provided by an automatic fire 
    detection system.
        During a plant fire, compartment temperatures are likely to be less 
    severe at the early stages. On the basis of enhanced capabilities 
    provided by fire watches and notwithstanding that the level of barrier-
    type protection may be reduced, the NRC staff has determined that there 
    is an adequate margin of safety to ensure protection in cases in which 
    fire watches are approved.
        The goal of the NRC staff's Thermo-Lag Action Plan is directed 
    towards restoring the functional capability of fire barriers as soon as 
    practicable. There is not a time limit associated with the use of fire 
    watches as a compensatory measure. Given the margin of safety a fire 
    watch brings to a fire protection program, as discussed above, the NRC 
    staff has determined that continuing the use of fire watches while 
    barriers are inoperable is acceptable. However, the NRC believes that 
    notwithstanding interim reliance on compensatory measures, appropriate 
    actions must be taken by licensees to restore operability of Thermo-Lag 
    barriers. Individual licensees have provided schedules for restoring 
    operability and these are being tracked by the NRC staff.
        The NRC staff has carefully evaluated the use of fire watches to 
    compensate for any degradation in the effectiveness of required fire 
    barriers and has concluded that fire watches continue to ensure 
    protection of the public health and safety. Therefore, the Petitioners' 
    assertion that the measures taken by licensees to compensate for 
    degraded fire barrier conditions, specifically fire watches, are a 
    hazard is without merit.
    
    C. Combustibility
    
        The Petitioners alleged that, contrary to NRC regulations, Thermo-
    Lag is combustible.
        The NRC staff recognizes that Thermo-Lag is combustible. To assess 
    Thermo-Lag combustibility, the NRC staff conducted a testing program at 
    the National Institute of Standards and Technology (NIST) based on the 
    American Society for Testing and Materials (ASTM) Standard E-136. Under 
    this testing standard, the material is considered to be ``combustible'' 
    if three out of four samples tested exceed the following criteria: (1) 
    the recorded temperature of the specimen's surface and interior 
    thermocouples, during the test, rises 54  deg.F (30  deg.C) above the 
    initial furnace temperature; (2) there is flaming from the specimen 
    after the first 30 seconds of irradiance; and (3) the weight loss of 
    the specimen, due to combustion during the testing, exceeds 50 percent. 
    Of the four Thermo-Lag specimens tested, all experienced a weight loss 
    of greater than 50 percent and flaming continued in excess of 30 
    seconds. In 92-82, which provided licensees with the results of the E-
    136 tests and confirmed the combustibility of Thermo-Lag, restated the 
    NRC fire protection requirements of Section III.G. of Appendix R to 10 
    CFR Part 50 and asked that licenses review the information for 
    applicability to their facilities.
        The NRC's basic fire protection regulation for commercial nuclear 
    power plants is Section 50.48 of 10 CFR Part 50 ``Fire protection.'' 
    Section 50.48 references General Design Criterion (GDC) 3 of Appendix A 
    to 10 CFR Part 50, ``Fire protection,'' Appendix R to 10 CFR Part 50'' 
    Fire Protection Program for Nuclear Power Facilities Operating Prior to 
    January 1, 1979,'' and various NRC fire protection guidance documents. 
    Specifically, Section 50.48(a) states that each operating nuclear power 
    plant must have a fire protection plan that satisfies GDC 3, and 
    Section 50.48)b) states that Appendix R to 10 CFR Part 50 establishes 
    fire protection features required to satisfy GDC 3 with respect to 
    certain generic issues for nuclear power plants licensed to operate 
    prior to January 1, 1979. \8\ These issues are addressed in Section 
    III.G, ``Fire protection of safe shutdown capability,'' Section III.J, 
    ``Emergency lighting,'' and Section III.O, ``Oil collection system,'' 
    of Appendix R. Of these three sections of Appendix R, Section III.G 
    addresses the use of fire barriers to protect one train of systems 
    necessary to achieve and maintain hot shutdown conditions in the event 
    of a fire and, therefore, is the regulation of interest here.
    
        \8\ While Appendix R is applicable only to facilities that 
    commenced operation prior to January 1, 1979, as discussed earlier 
    in this Director's Decision, facilities commencing operation on or 
    after January 1, 1979, are bound to satisfy the criteria of Appendix 
    R through license conditions or licensing commitments.
    ---------------------------------------------------------------------------
    
        Section 50.48(a) notes that fire protection guidance for nuclear 
    power plants is contained in two NRC documents. These are (1) Branch 
    Technical Position (BTP) Auxiliary Power Conversion Systems Branch 
    (APCSB) 9.5-1, ``Guidelines for Fire Protection for Nuclear Power 
    Plants,'' for new plants docketed after July 1, 1976, and (2) Appendix 
    A to BTP APCSB 9.5-1, ``Guidelines for Fire Protection for Nuclear 
    Power Plants Docketed Prior to July 1, 1976.'' These two NRC documents 
    specify preferred methods for fire protection program design including 
    the use of fire barriers to satisfy Section III.G of Appendix R. Fire 
    barriers that meet the criteria of Section III.G of Appendix R to 10 
    CFR Part 50 and these NRC guidance documents satisfy GDC 3. NUREG-0800, 
    ``Standard Review Plan,'' (SRP) Section 9.5-1, ``Fire Protection 
    Program,'' incorporates the guidance of BTP APCSB 9.5-1 and Appendix A 
    to BTP APCSB 9.5-1 and the criteria of Section III.G of Appendix R to 
    10 CFR Part 50. Therefore, fire barriers that meet the guidelines of 
    SRP Section 9.5-1 also satisfy 10 CFR 50.48 and GDC 3.
        As stated in 10 CFR 50.48(a), the purpose of the fire protection 
    plan is ``to limit fire damage to structures, systems, or components 
    important to safety so that the capability to safely shut down the 
    plant is ensured. '' In general, a fire protection plan consists of 
    administrative controls and procedures, personnel for implementing the 
    plan and for fire prevention and manual fire suppression activities, 
    fire detection systems, automatic and manually operated fire 
    suppression systems and equipment, and fire barriers.
    
    [[Page 16012]]
    
        Section III.G of Appendix R to 10 CFR Part 50 is the only part of 
    the fire protection regulations that addresses the use of fire 
    barriers. It addresses the use of fire barriers to protect one train of 
    systems necessary to achieve and maintain hot shutdown conditions in 
    the event of a fire. Fire barriers are required to have either a 1-hour 
    or 3-hour rating depending on the specific requirement. However, 
    Section III.G does not provide acceptance criteria for fire barriers, 
    nor does it address the combustibility of fire barrier materials. The 
    criteria are set out in BTP APCSB 9.5-1, Appendix A to BTP APCSB 9.5-1, 
    and SRP Section 9.5-1. These NRC documents do not preclude the use of 
    combustible materials for construction of fire barriers required to 
    have a 1-hour or 3-hour rating. On March 25, 1994, the staff 
    consolidated and clarified in Supplement 1 to Generic Letter (GL) 86-
    10, the fire barrier criteria specified in the BTPs and the SRP. This 
    GL supplement provides detailed staff guidelines for assessing the 
    combustibility of fire barrier materials, but it does not preclude the 
    use of combustible materials for fire barriers required to satisfy a 1-
    hour or 3-hour rating. In fact, the fire barrier criteria are 
    appropriately focused on the performance of the fire barrier and its 
    ability to achieve its intended design function, that is, its ability 
    to limit temperature rise within the barrier enclosure and to prevent 
    the passage of flame or gasses hot enough to adversely affect the 
    functionality of the safe shutdown components (e.g., cables) enclosed 
    within the fire barrier.
        Thermo-Lag 330-1 is a sacrificial material. When it is exposed to 
    elevated temperatures, such as those experienced during a fully-
    developed room fire, it sublimes and transitions from a solid to a 
    vapor. The vapors go through an endothermic decomposition process 
    (pyrolysis) which absorbs heat from the fire. As a result of the 
    pyrolysis, the unreacted Thermo-Lag material is replaced by an 
    insulating char layer which is composed of small interconnecting cells 
    having a large surface area. The char layer re-radiates energy and 
    limits heat transfer through the Thermo-Lag material. The low thermal 
    conductivity of the char layer provides additional thermal insulation. 
    Therefore, even though Thermo-Lag is classified as a combustible 
    material when testing in accordance with the guidance of Supplement 1 
    to GL 86-10, properly designed, qualified, and installed Thermo-Lag can 
    yield fire barriers with a 1-hour or 3-hour rating which will protect 
    safe shutdown components from the effects of the fire. Therefore, such 
    barriers can satisfy the requirements of 10 CFR 50.48 and GDC 3.
        To provide reasonable assurance that Thermo-Lag fire barriers 
    installed in the nuclear power plants can meet their intended function, 
    representative Thermo-Lag fire barrier assemblies have been subjected 
    to full-scale qualification-type fire endurance tests conducted in 
    accordance with the guidance of Supplement 1 to GL 86-10. This guidance 
    provides standard and uniform test methods and acceptance criteria for 
    assessing the fire-resistive capabilities of these barriers. The staff 
    has found the use of Thermo-Lag acceptable as a fire barrier material 
    when it is used in accordance with existing NRC regulations and 
    guidance and where supported by appropriate tests and analyses.
        However, there are two types of applications where the use of 
    Thermo-Lag material is not appropriate. These are (1) enclosing 
    combustible materials (e.g., insulated cables) within Thermo-Lag fire 
    barriers to eliminate the combustible materials as a fire hazard and 
    (2) using Thermo-Lag as radiant energy heat shields inside noninerted 
    containments.
        Section III.G of Appendix R (and the equivalent SRP guidance) 
    specifies three options for protecting redundant trains of systems 
    necessary to achieve and maintain hot shutdown conditions located 
    within the same fire area outside of containment. Two of the three 
    options (Sections III.G.2.a and c) rely on the use of fire barriers 
    with a 1-hour or 3-hour rating, as discussed above. The third option, 
    Section III.G.2.b, specifies the separation of redundant safe shutdown 
    trains by a horizontal distance of more than 20 feet with no 
    intervening combustibles or fire hazards. (A typical example of 
    intervening combustibles is a cable tray loaded with cables, because 
    cable jacket materials are combustible.) Therefore, spacial separation, 
    and not fire barriers, are used to meet Section III.G.2.b. However, to 
    meet this requirement, some licensees have enclosed combustibles that 
    are installed between redundant shutdown trains within a fire barrier. 
    In theory, the fire barrier prevents an exposure fire from igniting the 
    intervening combustible materials and spreading along them from one 
    redundant train to the other. Thus the fire barrier effectively 
    eliminates the intervening combustible as a fire hazard. If the fire 
    barrier itself is noncombustible and the redundant safe shutdown trains 
    are separated by a horizontal distance of more than 20 feet, then the 
    configuration meets Section III.G.2.b of Appendix R. However, if the 
    fire barrier material used to enclose the intervening combustibles is 
    also combustible, such as Thermo-Lag, then the licensee has simply 
    installed one combustible material over another and has not eliminated 
    the intervening fire hazard. In a limited number of cases, licensees 
    have enclosed intervening combustibles within Thermo-Lag fire barriers 
    under the incorrect assumption that the Thermo-Lag fire barrier would 
    eliminate the intervening combustibles as a fire hazard. Corrective 
    actions will be required in these cases.
        As an alternative to the three options discussed above, Section 
    III.G.2.f of Appendix R (and the equivalent SRP guidance) provides a 
    fourth option for noninerted containments, that is, the separation of 
    redundant safe shutdown components with noncombustible radiant energy 
    heat shields. Thermo-Lag is classified as a combustible material when 
    tested in accordance with the guidance of Supplement 1 to GL 86-10. 
    Therefore, it does not meet the criteria for radiant energy heat 
    shields. Licensees using Thermo-Lag in this fashion will also be 
    required to take corrective action.
        To assure that corrective actions are taken in these cases, the NRC 
    staff issued IN 95-27. In that IN, the staff addressed enclosing 
    combustible materials within Thermo-Lag fire barriers in an attempt to 
    eliminate the combustible materials as a fire hazard and using Thermo-
    Lag to construct radiant energy heat shields inside noninerted 
    containments. The staff identified such solutions for reevaluating the 
    use of Thermo-Lag for these applications as: (1) reanalyzing post-fire 
    safe shutdown circuits inside containment and their separation to 
    determine if the Thermo-Lag radiant energy shields are needed, (2) 
    replacing Thermo-Lag barriers installed inside the containment with 
    noncombustible barrier materials, (3) replacing Thermo-Lag barriers 
    used to create combustible-free zones with noncombustible barrier 
    materials, (4) rerouting cables or relocating other protected 
    components, or (5) requesting plant-specific exemptions where 
    technically justified.
        One of the Petitioners also asserted that subsection 5a(3) of 
    Section 9.5-1 of the SRP states that fire barrier designs ``should 
    utilize only non-combustible materials.'' This section of the SRP does 
    not apply to fire barriers which are used to separate redundant safe 
    shutdown components located within a nuclear power plant fire area. 
    Rather, it applies to fire barrier penetration seals, which are 
    typically installed in fire area
    
    [[Page 16013]]
    boundaries. Thermo-Lag 330-1 is not used in such applications.
        The principal consideration for 1-hour and 3-hour rated fire 
    barriers installed to meet NRC fire protection requirements and 
    guidelines is that they can achieve their intended design function. 
    That is, that they can limit temperature rise within the barrier 
    enclosure and prevent the passage of flame or gasses hot enough to 
    adversely affect the functionality of the safe shutdown components 
    enclosed within the fire barriers. The fact that Thermo-Lag material is 
    combustible does not preclude Thermo-Lag fire barriers from achieving 
    the intended function of preventing fire damage if the fire barriers 
    are properly designed, qualified, and installed. The Petitioners' 
    contention that Thermo-Lag material should not be used because it is 
    combustible is without basis.
    
    D. Ampacity Derating
    
        The Petitioners assert that Thermo-Lag could contribute to starting 
    a fire instead of protecting from it. They further alleged that faulty 
    ampacity derating factors could result in the use of inappropriate 
    cables that, if undersized, could overheat and cause its insulation to 
    deteriorate.
        Ampacity derating is the lowering (derating) of the current-
    carrying capacity of power cables enclosed in electrical raceways 
    protected with fire barrier materials because of the insulating effect 
    of the fire barrier material. This insulating effect may reduce the 
    ability of the cable insulation to dissipate heat. If not accounted for 
    in the plant design, the increased cable insulation temperature could 
    lead to premature insulation failure. Other factors also affect 
    ampacity derating, including the extent of cable fill in the raceway, 
    cable type, raceway construction, and ambient temperature. The National 
    Electrical Code, Insulated Cable Engineers Association (ICEA) 
    publications, and other industry standards provide ampacity derating 
    factors for open air installations. These standards do not provide 
    derating factors for fire barrier systems. Although a national standard 
    test method is in the process of being developed but has not yet been 
    established, ampacity derating factors for raceways enclosed with fire 
    barrier material are determined by testing for the specific 
    installation configurations.
        TSI, the manufacturer of Thermo-Lag, has documented a wide range of 
    ampacity derating factors that were determined by testing, for raceways 
    enclosed within Thermo-Lag fire barrier materials. On October 2, 1986, 
    TSI informed its customers that, while conducting tests in September 
    1986 at Underwriters Laboratories, Inc. (UL), it found that the 
    ampacity derating factors for Thermo-Lag barriers were greater than 
    previous tests indicated. However, the cable fill and tray 
    configurations were different for each test than those tested 
    previously. In addition, the NRC staff learned that UL performed a 
    duplicate cable tray test that resulted in an even higher derating 
    factor. The NRC staff also learned of the determination of other 
    derating factors during its review of other tests conducted at 
    Southwest Research Institute (SwRI).9
    
        \9\ The test procedures and test configurations differed among 
    the testing laboratories. Therefore, the results from the different 
    ampacity tests may not be directly comparable to each other.
        The NRC staff is concerned that the ampacity derating factors, 
    as determined in UL tests for Thermo-Lag barrier designs, are 
    inconsistent with TSI results for similar designs because different 
    times were allowed for the temperature to stabilize before taking 
    current measurements. Inconsistent stabilization times would call 
    into question the validity of previous TSI results. The NRC also 
    noticed during the review of the Industrial Testing Laboratories 
    (ITL) test reports that ambient temperature and maximum cable 
    temperature were allowed to vary widely for some tests. Therefore, 
    those tests in which the ambient and maximum cable temperatures were 
    not maintained within specified limits may be questionable. 
    Additionally, a licensee discovered a mathematical error for the 
    ampacity derating factor published in an ITL test report. A 
    preliminary assessment of the use of a lower-than-actual ampacity 
    derating factor indicates that higher-than-rated cable temperatures 
    are possible for Thermo-Lag installations. Higher-than-rated cable 
    temperatures could accelerate the aging effects experienced by the 
    cable.
    ---------------------------------------------------------------------------
    
        The NRC special review team concluded that the ampacity derating 
    test results completed at the time of the review, including the UL test 
    results, were indeterminate. This conclusion was based on observed 
    inconsistencies in the derating test results of the various testing 
    laboratories. The special review team found that there was no national 
    consensus test standard (e.g., Institute of Electrical and Electronics 
    Engineers (IEEE) or American National Standards Institute (ANSI)) for 
    conducting these tests, and that some licensees had not adequately 
    reviewed ampacity derating test results to determine the validity of 
    the tests and the applicability of those test results to their plant 
    design. The special review team recognized that, in hypothetical cases, 
    nonconservative ampacity derating factors could have been instrumental 
    in the installation of inappropriate cables, which as a result, could 
    suffer premature cable jacket and cable insulation failures over a 
    period of time. However, since that time, the NRC staff has determined 
    that in practice the ampacity derating factor resulting from Thermo-Lag 
    insulating properties represents only one of many variables used in 
    determining the design ampacity for power cable systems and that, as 
    discussed below, sufficient margin exists in this area to preclude any 
    immediate safety concerns.
        For actual installations, various derating factors are typically 
    applied to the ICEA ampacity values provided for each cable size. In 
    general, the cables typically used in actual installations have higher 
    current-carrying capacity than the ICEA ampacity values.10 Also, 
    cables are sized based on full-load current plus a 25 percent margin to 
    account for starting current requirements of the load. Given the short 
    duration of typical equipment starts, this margin is available to 
    compensate for any errors in ampacity derating. Further, use of a cable 
    size larger than normal may be required as a result of voltage drop 
    considerations for long circuit lengths. In typical applications this 
    also provides additional current-carrying capacity. Given these 
    conservatisms inherent in the design ampacity of cable systems and in 
    addition the fact that most power cables required for safe shutdown are 
    not normally energized, but are typically operated during surveillance 
    testing for short time periods, the likelihood that cables could ignite 
    as a result of Thermo-Lag ampacity derating errors has been judged by 
    the NRC staff to be unlikely. In addition, based on these conservatisms 
    and the currently available information on existing plants, ampacity 
    design, and operating history, the NRC staff believes that the ampacity 
    derating issue is not an immediate safety issue but rather is an aging 
    issue to be resolved over the long term.11
    
        \10\ ICEA ampacity values include conservatisms to compensate 
    for skin and proximity effects and shield and/or sheath losses which 
    may or may not apply in specific situations.
        \11\ Generic Letter 92-08 requires licensees to review the 
    ampacity derating factors used for all raceways protected by Thermo-
    Lag 330-1 (for fire protection of safe shutdown capability or to 
    achieve physical independence of electrical systems) and to 
    determine whether the ampacity derating test results relied upon are 
    correct and applicable to the plant design. Presently, the staff is 
    conducting reviews of followup actions to close out ampacity 
    derating concerns with licensees pursuant to GL 92-08.
    ---------------------------------------------------------------------------
    
    E. Oyster Creek Failed To Report Test Results on Combustibility to the 
    NRC
    
        The Petitioners requested that Oyster Creek's license be suspended 
    based on the following: (1) SwRI conducted fire tests on Thermo-Lag 
    330-1 specimens for GPUN, the licensee for Oyster Creek, and reported 
    that all specimens ignited approximately 2 seconds after they were 
    inserted into the furnace and failed specified criteria because of 
    flaming after the first 30 seconds of testing, an
    
    [[Page 16014]]
    outside temperature rise higher than 30  deg.C, and a weight loss of 50 
    percent; (2) GPUN's operation of Oyster Creek with knowledge of the 
    SwRI report is an example of GPUN's reckless disregard for fire 
    protection and public safety; (3) in the event of fire, Thermo-Lag is 
    likely to fail its intended function of protecting vital electrical 
    cables running from the control room to plant safety systems used to 
    shut down the reactor; (4) current installations of Thermo-Lag are 
    likely to fail in less time than the 1 hour (when smoke detectors and 
    automatic sprinkler systems are present) or 3 hours (when there are no 
    fire detection and suppression systems) that NRC regulations require 
    for fire barriers to withstand fire; (5) the NRC Inspector General 
    issued a report in August 1992 condemning NRC's handling of the Thermo-
    Lag issue and documenting the NRC staff's failure to understand the 
    scope of the problem; (6) in April 1994, ITL and its President pleaded 
    guilty to five felony counts of aiding and abetting the distribution of 
    falsified test data; (7) on September 29, 1994, the U.S. Department of 
    Justice issued a seven-count indictment against the manufacturer of 
    Thermo-Lag and its Chief Executive Officer for willful violations of 
    the Atomic Energy Act, conspiracy to conceal material facts, and making 
    false statements to defraud the United States, in connection with $58 
    million in fire barrier material; (8) GPUN has known since at least 
    August 11, 1992, that Thermo-Lag 330-1 as a structural base material is 
    combustible and that it was in violation of Appendices A and R to Part 
    50 of Title 10 of the Code of Federal Regulations (10 CFR) and the NRC 
    Standard Review Plan, NUREG-0800; (9) GPUN failed to report the SwRI 
    test results in response to GL 92-08 of February 10, 1994, when asked 
    to describe the Thermo-Lag 330-1 fire barriers installed as required to 
    meet 10 CFR Part 50, Appendix R; and (10) continued reliance on fire 
    watches at Oyster Creek is an unreasonable and unnecessary hazard to 
    the public health and safety because of an inoperable fire protection 
    system for safe shutdown of the reactor and installed combustible 
    material on the shutdown systems.
        Several of the issues listed above have been addressed earlier in 
    this decision. Therefore, the NRC staff will only address below the 
    remaining plant-specific issues. As discussed earlier in this decision, 
    the NRC issued IN 92-82 to inform the industry of the results of 
    combustibility tests performed by NIST in early August 1992. These 
    tests confirmed the combustibility of Thermo-Lag. As a result of 
    discussions with the NRC staff on the subject of Thermo-Lag 
    combustibility, GPUN decided to independently verify the results of the 
    E-136 tests performed by NIST and contracted SwRI to perform the E-136 
    tests. The results of these tests, as documented by the telecopy 
    transmittal sheet submitted with the Petition, confirmed the 
    combustibility of Thermo-Lag. Contrary to the Petitioners' allegations, 
    the NRC staff does not require that licensees report the results of 
    their independent testing. It should be noted here that, prior to the 
    SwRI testing that confirmed combustibility, the NRC was aware of the 
    combustibility of Thermo-Lag and that the NRC was also well aware of 
    the results of the E-136 tests performed by GPUN through telephone 
    conversations with GPUN personnel, even though there was no requirement 
    for GPUN to report these test results.
        The Petitioners also alleged that GPUN did not report to NRC its 
    findings of the SwRI test results in its ``Response to Request for 
    Additional Information Regarding Generic Letter 92-08, `Thermo-Lag Fire 
    Barriers,' '' (RAI) dated February 10, 1994.
        The RAI quoted by the Petitioners did not request that GPUN report 
    to NRC its findings of the SwRI test results and, in addition, the NRC 
    staff does not require that licensees report the results of their 
    independent testing. Therefore the NRC staff has concluded that, 
    contrary to the Petitioners' allegation, GPUN did not have to report to 
    the NRC its findings of the SwRI test results.
        For the reasons stated above, the suspension of Oyster Creek's 
    license, as requested by the Petitioners, is not warranted.
    
    F. Dry-Joint Issue at Comanche Peak Unit 1
    
        The Petitioners requested that (a) the Comanche Peak Unit 1 license 
    be suspended, (b) the licensee perform additional destructive analysis 
    for Thermo-Lag configurations, and, (c) the licensee perform fire tests 
    on upgraded ``dry-joint'' Thermo-Lag configurations based on the 
    following: (1) the licensee's records on the original installation of 
    Thermo-Lag fire barriers on conduits and cable trays indicate that its 
    contractor followed specifications for pre-buttering all joints; (2) 
    NRC Inspection Report Nos. 50-445/93-42; 50-446/93-42 found, based on 
    destructive analysis documents, that a concern did exist where Thermo-
    Lag conduit joints fell apart easily and did not appear to have any 
    residual material of a buttered surface, indicative of a joint that had 
    not been pre-buttered; (3) the ``dry joint'' deficiency appeared in 
    Room 115A and other areas of the unit; (4) the licensee directly 
    contradicts an NRC inspector's findings that were determined in part by 
    destructive analysis; (5) the ``dry joint'' or absence of pre-buttering 
    of Thermo-Lag panels can be determined only by destructive analysis and 
    cannot be determined by a walk down visual inspection; (6) the findings 
    reported in the Comanche Peak Unit 1 Region IV Inspection Reports 50-
    445/93-42 and 50-446/93-42, based on the limited amount of destructive 
    analysis conducted at the unit, constitute a substantial documentation 
    of installation deficiencies found in Thermo-Lag fire barriers as 
    documented in NRC IN 91-79 and Supplement 1; (7) neither the NRC nor 
    the industry, by its agent NEI, nor a utility, have conducted fire 
    tests on dry fitted or ``dry joint'' upgraded configurations of Thermo-
    Lag 330-1; and (8) the presence of ``dry joint'' upgraded 
    configurations in Comanche Peak Unit 1 constitutes an untested 
    application of Thermo-Lag fire barriers.
        These allegations were based on the Petitioners' interpretation of 
    NRC Inspection Report 93-42 issued on February 21, 1994. By letter of 
    November 29, 1994, TU Electric, the licensee for Comanche Peak Unit 1, 
    sent a letter to the NRC staff responding to the Petition.
        The term ``joint'' refers to the interface between two adjacent 
    Thermo-Lag surfaces. Comanche Peak Unit 1 installation procedures for 
    Thermo-Lag fire barriers specify that, during the initial installation 
    process, the joints should be pre-buttered (or covered) with Thermo-Lag 
    trowel grade material before the mating surfaces are joined to ensure 
    adhesion of the surfaces. The term ``dry joint'' refers to the lack of 
    Thermo-Lag trowel grade material in a joint. The failure to pre-butter 
    a joint with trowel grade Thermo-Lag could result in a weakening of the 
    joint during a potential fire exposure and could provide an exposure 
    path in the fire barrier envelope. The NRC performed an inspection at 
    Comanche Peak Unit 1 on November 2-5, and 23-24, 1993, and January 26-
    28, 1994, to compare the Thermo-Lag test specimens with the upgraded 
    Thermo-Lag configurations on site. The results of this inspection are 
    documented in NRC Inspection Report 93-42. The report stated that there 
    appeared to be a large number of deficiencies with the installed fire 
    barriers and that an example of these deficiencies involved dry joints 
    on conduit overlays installed on pedestal hangers. The NRC inspector 
    did not personally observe the dry joints in question. His statements 
    were based on
    
    [[Page 16015]]
    observations made by TU Electric and documented in an Operations 
    Notification and Evaluation (ONE) form. However, the ONE form in 
    question did not identify a dry joint. Instead, the ONE form identified 
    a condition that was conservatively reported as an apparent dry joint. 
    Upon further evaluation of the ONE form, TU Electric determined that 
    the joint in question had in fact been pre-buttered with trowel grade 
    Thermo-Lag. These facts are discussed in more detail below.
        On November 25, 1992, a speed memo was written by a TU Electric 
    contractor identifying ``apparent unsatisfactorily conditions on Unit 1 
    commodities.'' This memorandum identified ``an apparent'' dry joint on 
    an oversize coupling section (on top of a pedestal hanger). The speed 
    memo also stated that, ``we have decided that the best vehicle to call 
    attention to these apparent deficiencies would be a letter to your 
    attention for further evaluation of the situation. . . .'' The letter 
    was forwarded to the appropriate TU Electric engineering section.
        The cognizant TU Electric engineer performed a walkdown of the 
    described areas and evaluated the commodities. He conservatively 
    initiated a ONE form (the process used by TU Electric to report 
    problems and develop resolution for the identified problems). A 
    comprehensive evaluation of this condition determined that the joint 
    had been pre-buttered. Therefore, the engineering resolution for this 
    condition was that ``this is not a deficient condition, and there are 
    no generic implications.''
        The originator of the speed memo initially believed that the 
    condition in question was a dry joint because of the appearance of the 
    joint. During alignment of Thermo-Lag panels, the leading edge of one 
    panel contacts the outer edge of a preceding panel and forces most of 
    the trowel grade along the initial contact edge toward the inside of 
    the ThermoLag envelope. Subsequent shrinkage of the trowel grade in the 
    joint can give the appearance of a dry joint because the trowel grade 
    material is not visible. Therefore, contrary to the Petitioners' 
    allegation, there was no ``dry joint'' deficiency on the pedestal 
    hanger.
        The Petitioners also alleged that dry joints appear in other 
    Thermo-Lag installations at Comanche Peak Unit 1. In response to the 
    Petition, TU Electric performed an electronic search of its ONE form 
    data base. The search did identify additional ONE forms related to dry 
    joints. However, Thermo-Lag rework crews and the quality control 
    inspectors at Comanche Peak Unit 1 have used the term ``dry joints'' 
    and ``no visible trowel grade material'' synonymously. Upon further 
    investigation of these ONE forms, it was determined that trowel grade 
    material had in fact been applied to the joints in question. Therefore, 
    these ONE forms were also dispositioned as ``not a nonconforming 
    condition.'' These findings support the NRC staff's conclusion that, 
    contrary to the Petitioners' allegations, there is no evidence of dry 
    joints at Comanche Peak Unit 1. The Petitioners' allegations regarding 
    dry joints at Comanche Peak Unit 1 are based on premises that are 
    faulty and contrary to the information contained in Inspection Report 
    93-42.
        In regard to the Petitioners' request that the licensee perform 
    fire tests on upgraded ``dry joint'' Thermo-Lag configurations and 
    additional destructive analysis, the NRC staff has reviewed the 
    documentation provided by the licensee in response to the RAIs 
    regarding GL 92-08 and concluded that the licensee's quality assurance 
    program gave adequate confidence that the as-installed Thermo-Lag 
    configurations at Comanche Peak Unit 1 conform with NRC specification 
    requirements for both material and installation attributes.
        Accordingly, suspension of the Comanche Peak Unit 1 license, as 
    requested by the Petitioners, is not warranted.
    
    G. Protection of Rubin Feldman
    
        The Petitioners assert that, rather than protecting the public, the 
    NRC is protecting Rubin Feldman, President of the company that 
    manufactures Thermo-Lag.
        As discussed earlier, the NRC received allegations in 1991 that 
    questioned the adequacy of Thermo-Lag fire barriers. In response (1) 
    the Office of the Inspector General (OIG) and the Office of 
    Investigations (OI) formed a joint task force to investigate the 
    allegations and (2) the Office of Nuclear Reactor Regulation (NRR) 
    established a special team to review the safety issues raised by the 
    allegations. Throughout its review, the special team gave expert 
    technical advice and assistance to the OIG/OI task force. The Director 
    of NRR tasked the NRR staff to resolve the technical issues raised by 
    the special team. The NRC staff continued to cooperate fully with the 
    investigative task force. Further, the NRR staff carried out a full-
    scale test program and developed other technical data and information 
    for the investigative task force. These NRC staff efforts contributed 
    significantly to a referral to the Department of Justice of possible 
    wrongdoing by TSI. The referral resulted in a seven-count criminal 
    indictment of TSI, the manufacturer and supplier of Thermo-Lag fire 
    barriers and of its President, Rubin Feldman, by a Federal Grand Jury. 
    The NRC staff continued to support the Department of Justice throughout 
    the criminal case.\12\ In addition, throughout the trial, the NRC staff 
    continued to pursue corrective actions consistent with its action plan 
    for the resolution of the Thermo-Lag issues. The above facts contradict 
    the Petitioners' assertion that the NRC was protecting Rubin Feldman.
    
        \12\ The jury returned a verdict of ``not guilty'' on all counts 
    of the indictment against TSI and Mr. Feldman.
    ---------------------------------------------------------------------------
    
    H. NRC Seeming Complicity With Utilities
    
        The Petitioners also assert that there is seeming complicity 
    between the NRC and the licensees and that licensees seek to avoid 
    costly replacement of the Thermo-Lag.
        In May 1991, the NRC Office of the Inspector General performed an 
    inspection of the NRC's staff performance in regard to Thermo-Lag 
    barriers and found indications of inadequate performance by the NRC 
    staff in the acceptance and review of Thermo-Lag barriers. 
    Subsequently, the NRC staff initiated an aggressive program of 
    corrective actions to rectify the deficiencies identified in the review 
    and response process, as summarized earlier in this decision.
        In addition, the staff has expended considerable time and effort to 
    address and resolve Thermo-Lag issues to ensure that licensees return 
    to compliance with existing NRC fire protection requirements. The NRC 
    staff issued three requests for additional information regarding GL 92-
    08 to each licensee using Thermo-Lag to obtain information on the 
    specific Thermo-Lag material installed at each plant, details about the 
    corrective actions each licensee intended to take to return to 
    compliance with NRC fire protection requirements, and schedules for the 
    implementation of these corrective actions. The response of each 
    licensee was evaluated by the NRC staff. As a consequence of this 
    substantial NRC staff effort, a number of licensees have already 
    returned to compliance with NRC requirements by a variety of means 
    which include replacing, rerouting, or upgrading existing Thermo-Lag 
    barriers, performing post-fire safe shutdown reanalysis, and installing 
    additional fire detection and suppression features. All of these 
    measures involve some burden on licensees. In addition, some licensees 
    have initiated costly programs to perform plant-specific fire endurance
    
    [[Page 16016]]
    tests of other fire barriers with the intention of replacing Thermo-Lag 
    with these barriers. All licensees who utilize Thermo-Lag will need to 
    expend resources commensurate with their reliance on Thermo-Lag to come 
    into compliance with NRC fire protection requirements. NRC staff 
    oversight will ensure that this is the case.
        The Petitioners' assertion of seeming complicity with utilities on 
    the part of the NRC staff is unfounded in the light of the significant 
    NRC staff efforts to ensure that licensees expend the resources 
    necessary to return to compliance with NRC requirements.
    
    IV. Conclusion
    
        The Petitioners request that the NRC order the immediate shutdown 
    of all reactors using Thermo-Lag and the suspension of Oyster Creek, 
    Peach Bottom Units 1 and 2, and Comanche Peak Unit 1 operating 
    licenses.
        For the reasons discussed above, I find no basis for taking such 
    actions. Rather, on the basis of the review efforts by the NRC staff, I 
    conclude that the issues raised by the Petitioners are being addressed 
    by licensees in a manner which assures adequate protection of the 
    public health and safety. Accordingly, the Petitioners' requests for 
    action pursuant to 10 CFR 2.206 are denied.
        A copy of this Decision will be placed in the Commission's Public 
    Document Room, Gelman Building, 2120 L Street, N.W., Washington, D.C., 
    and at the Local Public Document Room for the named facilities. A copy 
    of this Decision will also be filed with the Secretary for the 
    Commission's review as provided in 10 CFR 2.206(c) of the Commission's 
    regulations.
        As provided by this regulation, the Decision will constitute the 
    final action of the Commission 25 days after issuance, unless the 
    Commission, on its own motion, institutes a review of the Decision 
    within that time.
    
        Dated at Rockville, Maryland, this 3rd day of April 1996.
    
        For the Nuclear Regulatory Commission.
    William T. Russell,
    Director, Office of Nuclear Reactor Regulation.
    [FR Doc. 96-8909 Filed 4-9-96; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
04/10/1996
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
96-8909
Pages:
16005-16016 (12 pages)
PDF File:
96-8909.pdf