[Federal Register Volume 63, Number 69 (Friday, April 10, 1998)]
[Notices]
[Pages 17836-17838]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-9472]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER98-494-002, et al.]
Wolverine Power Supply Cooperative Inc., et al.; Electric Rate
and Corporate Regulation Filings
April 2, 1998.
Take notice that the following filings have been made with the
Commission:
1. Wolverine Power Supply Cooperative, Inc.
[Docket No. ER98-494-002]
Take notice that on March 30, 1998, Wolverine Power Supply
Cooperative, Inc. (Wolverine), tendered a filing in Compliance with the
Commission's December 23, 1997, Final Order requiring Wolverine to
revise an agreement entitled the Lansing Board of Water and Light and
MCP Members Coordination Agreement, dated July 12, 1976 (Lansing
Agreement). Enclosed is a fully executed contract, effective as of
December 31, 1997, terminating the Lansing Agreement.
Copies of the filing were served upon the Lansing Board of Water
and Light, the Traverse City Light and Power Board, Grand Haven Board
of Light and Power, and the Public Utility Commission of Michigan.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
2. Central Power and Light Company, West Texas Utilities Company,
Public Service Company of Oklahoma, and Southwestern Electric Power
Co.
[Docket No. ER98-1665-000]
Take notice that on March 30, 1998, Central Power and Light Company
(CPL), West Texas Utilities Company (WTU), Public Service Company of
Oklahoma (PSO) and Southwestern Electric Power Company (SWEPCO)
(collectively, the CSW Operating Companies), submitted for filing a
revised attachment to the Firm Point-to-Point Transmission Service
agreement with Tex-La Electric Cooperative of Texas, Inc.
The CSW Operating Companies state that a copy of the filing has
been served on Tex-La and on all parties to Docket No. ER98-1665-000.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
3. Energy Clearinghouse Corporation
[Docket No. ER98-2020-000]
Take notice that on March 30, 1998, Energy Clearinghouse
Corporation
[[Page 17837]]
(ECC), petitioned the Commission for acceptance of ECC Rate Schedule
FERC No. 1; the granting of certain blanket approvals, including the
authority to sell electricity at market-based rates; and the waiver of
certain Commission Regulations.
ECC intends to engage in wholesale electric power and energy
purchases and sales as a marketer as well as selling and marketing the
same at retail, aggregating and brokering. ECC is not in the business
of generating or transmitting electric power. ECC is wholly-owned by
Harold E. Scherz.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
4. Madison Gas and Electric Company
[Docket No. ER98-2055-000]
Take notice that March 30, 1998, Madison Gas and Electric Company
(MGE), tendered for filing with the Federal Energy Regulatory
Commission revised tariff sheets from its Original Volume No. 2 (Power
Sales Tariff).
MGE states that a copy of the filing has been provided to the
Public Service Commission of Wisconsin and all customers taking service
under the Power Sales Tariff.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
5. Peoples Utility Corporation
[Docket No. ER98-2232-000]
Take notice that on March 30, 1998, Peoples Utility Corporation
tendered for filing an amendment application filed in the above-
referenced docket.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
6. Cinergy Services, Inc.
[Docket No. ER98-2339-000]
Take notice that on March 30, 1998, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Open
Access Transmission Service Tariff (the Tariff), entered into between
Cinergy and Griffin Energy Marketing (Griffin).
Cinergy and Griffin are requesting an effective date of March 2,
1998.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
7. Cinergy Services, Inc.
[Docket No. ER98-2344-000]
Take notice that on March 30, 1998, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Open
Access Transmission Service Tariff (the Tariff) entered into between
Cinergy and Griffin Energy Marketing (Griffin).
Cinergy and Griffin are requesting an effective date of March 2,
1998.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
8. Cinergy Services, Inc.
[Docket No. ER98-2345-000]
Take notice that on March 30, 1998, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Open
Access Transmission Service Tariff (the Tariff), entered into between
Cinergy and Merchant Energy Group of the Americas, Inc., (MEGA).
Cinergy and MEGA are requesting an effective date of March 15,
1998.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
9. Cinergy Services, Inc.
[Docket No. ER98-2346-000]
Take notice that on March 30, 1998, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Open
Access Transmission Service Tariff (the Tariff), entered into between
Cinergy and Merchant Energy Group of the Americas, Inc. (MEGA).
Cinergy and MEGA are requesting an effective date of March 15,
1998.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
10. New England Power Pool
[Docket No. ER98-2347-000]
Take notice that on March 30, 1998, the New England Power Pool
Executive Committee filed for acceptance a signature page to the New
England Power Pool (NEPOOL), Agreement dated September 1, 1971, as
amended, signed by CSW Energy Services, Inc. (CSW). The NEPOOL
Agreement has been designated NEPOOL FPC No. 2.
The Executive Committee states that the Commission's acceptance of
CSW's signature page would permit NEPOOL to expand its membership to
include CSW. NEPOOL further states that the filed signature page does
not change the NEPOOL Agreement in any manner, other than to make CSW a
member in NEPOOL. NEPOOL requests an effective date of June 1, 1998,
for commencement of participation in NEPOOL by CSW.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
11. Northern States Power Company (Minnesota Company)
[Docket No. ER98-2349-000]
Take notice that on March 30, 1998, Northern States Power Company
(NSP), tendered the Electrical Services Agreement between NSP and the
City of Granite Falls, MN. NSP requests an effective date of May 1,
1998.
A copy of the filing was served upon each of the parties named in
the Service List.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
12. Louisville Gas And Electric Company
[Docket No. ER98-2353-000]
Take notice that on March 30, 1998 Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Non-Firm Point-To-Point
Transmission Service Agreement between LG&E and OGE Energy Resources,
Inc., under LG&E's Open Access Transmission Tariff.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
13. Louisville Gas And Electric Company
[Docket No. ER98-2354-000]
Take notice that on March 30, 1998, Louisville Gas and Electric
Company (LG&E), tendered for filing an unexecuted Service Agreement
between LG&E and PP&L, Inc., under LG&E's Rate Schedule GSS.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
14. Louisville Gas And Electric Company
[Docket No. ER98-2355-000]
Take notice that on March 30, 1998, Louisville Gas and Electric
Company (LG&E), tendered for filing an Unexecuted Sales Agreement
between LG&E and Virginia Power under LG&E's Rate Schedule GSS.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
15. Louisville Gas And Electric Company
[Docket No. ER98-2356-000]
Take notice that on March 30, 1998, Louisville Gas and Electric
Company (LG&E), tendered for filing an unexecuted Purchase and Sales
Agreement between LG&E and Eastern Power Distribution, Inc., under
LG&E's Rate Schedule GSS.
[[Page 17838]]
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
16. Interstate Power Company
[Docket No. ER98-2357-000]
Take notice that on March 30, 1998, Interstate Power Company (IPW),
tendered for filing a Transmission Service Agreement between IPW and
ConAgra Energy Services, Inc. (ConAgra). Under the Transmission Service
Agreement, IPW will provide non-firm point-to-point transmission
service to ConAgra.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
17. Madison Gas and Electric Company
[Docket No. ER98-2358-000]
Take notice that on March 30, 1998, Madison Gas and Electric
Company (MGE), tendered for filing a service agreement under MGE's
Power Sales Tariff.
MGE requests an effective date of February 24, 1998, which is the
date the agreement was signed.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
18. American Electric Power Service Corporation
[Docket No. ER98-2364-000]
Take notice that on March 30, 1998, the American Electric Power
Service Corporation (AEPSC), tendered for filing an executed Network
Integration Transmission Service Agreement under the AEP Companies'
Open Access Transmission Service Tariff (OATT). The OATT has been
designated as FERC Electric Tariff Original Volume No. 4, effective
July 9, 1996. AEPSC requests waiver of notice to permit the Service
Agreements to be made effective for service billed on and after March
1, 1998.
A copy of the filing was served upon Commonwealth Edison Company
and the City of Dowagiac, Michigan and the state utility regulatory
commissions of Indiana, Kentucky, Michigan, Ohio, Tennessee, Virginia
and West Virginia.
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
19. Carolina Power & Light Company, Central Louisiana Electric
Company, Inc., Central Power and Light Co., Public Service Company
of Oklahoma, Southwestern Electric Power Co., West Texas Utilities
Company, The Detroit Edison Company, Duquesne Light Company,
Entergy Services, Inc., Entergy Arkansas, Inc., Entergy Gulf
States, Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc.,
Entergy New Orleans, Inc., Kansas City Power & Light Co., Public
Service Company of New Mexico, Sierra Pacific Power Company, and
UtiliCorp United, Inc.
[Docket Nos. OA97-105-001, OA97-432-001, OA97-287-001, OA97-184-001,
OA97-407-001, OA97-458-001, OA97-280-002, OA97-433-001, OA97-720-001,
OA97-464-001, and OA97-446-001]
Take notice that the companies listed in the above-captioned
dockets submitted revised standards of conduct 1 under Order
Nos. 889 et seq.2
---------------------------------------------------------------------------
\1\ The revised standards of conduct were submitted between
March 20 and March 30, 1998.
\2\ Open Access Same-Time Information System (Formerly Real-Time
Information Network) and Standards of Conduct, 61 FR 21737 (May 10,
1996), FERC Stats. & Regs., Regulations Preambles January 1991-June
1996 para. 31,035 (April 24, 1996); Order N. 889-A, order on
rehearing, 62 FR 12484 (March 14, 1997), III FERC Stats. & Regs.
para. 31,049 (March 4, 1997) (Order No. 889-A); Order No. 889-B,
rehearing denied, 62 FR 64715 (December 9, 1997), 81 FERC para.
61,253 (November 25, 1997).
---------------------------------------------------------------------------
Comment date: April 17, 1998, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph:
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of these filings are on file with
the Commission and are available for public inspection.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-9472 Filed 4-9-98; 8:45 am]
BILLING CODE 6717-01-P