98-9473. Florida Power Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 69 (Friday, April 10, 1998)]
    [Notices]
    [Pages 17831-17836]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-9473]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EC98-34-000, et al.]
    
    
    Florida Power Corporation, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    April 3, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Florida Power Corporation
    
    [Docket No. EC98-34-000]
    
        Take notice that on March 27, 1998, Florida Power Corporation 
    (Florida Power), filed an Application under Section 203 of the Federal 
    Power Act for authorization to sell jurisdictional substation 
    facilities to the City of Mount Dora, Florida.
        Florida Power explains that it has agreed to sell the Mount Dora 
    Distribution Substation in its entirety including all land, substation 
    facilities and other equipment associated with the Substation and that 
    the sale will allow the City of Mount Dora to purchase power from a 
    number of bulk power providers which will result in savings to 
    customers.
        Comment date: April 27, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. Origen Power Corp. and OGE Energy Corp.
    
    [Docket No. EC98-33-000]
    
        Take notice that on March 25, 1998, Origen Power Corp. (OPC) and 
    OGE Energy Corp. (Energy Corp.), (together, the Applicants) submitted 
    for filing, pursuant to Section 203 of the Federal Power Act, and Part 
    35 of the Commission's Regulations, an Application in connection with 
    the acquisition of jurisdictional assets through the purchase by Energy 
    Corp., of 100% of the ownership interests in Oklahoma Loan Acquisition 
    Corp. (OLAC) and the change of the name of OLAC to Origen Power Corp.
        Comment date: April 27, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. New England Power Company and USGen New England, Inc.
    
    [Docket No. EC98-35-000]
    
        Take notice that on March 26, 1998, New England Power Company and 
    USGen New England, Inc. submitted for filing, pursuant to Section 203 
    of the Federal Power Act and Part 33 of the Commission's Regulations, 
    an application seeking authorization for the transfer of rights to 
    transmission capacity under certain contracts associated with the 
    Hydro-Quebec Phase I and Phase II interconnections.
        Copies of the filing have been served on regulatory agencies in the 
    States of Massachusetts, Rhode Island and New Hampshire.
        Comment date: April 27, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Southern California Edison Company
    
    [Docket No. EL98-34-000]
    
        Take notice that on March 18, 1998, Southern California Edison 
    Company (Edison), tendered for filing with the Federal Energy 
    Regulatory Commission a Petition for Declaratory Order. The petition 
    asks the Commission to declare that Sacramento Municipal Utility 
    District may not unilaterally abrogate or refuse to perform its 
    obligations under its 1990 and 1994 system power sale agreements with 
    Edison on the basis of
    
    [[Page 17832]]
    
    Edison's divestiture or the California Public Utilities Commission's 
    buy-sell requirements.
        Comment date: April 24, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Boston Edison Company and Vermont Electric Power Company, Inc. 
    Complainants v. New England Power Pool and ISO New England Inc. 
    Respondents
    
    [Docket No. EL98-37-000]
    
        Take notice that on March 30, 1998, Boston Edison Company (Boston 
    Edison) and Vermont Electric Power Company, Inc. (VELCO) filed a 
    complaint against New England Power Pool (NEPOOL) and ISO New England 
    Inc. (ISO New England). As Participants in NEPOOL, Boston Edison and 
    VELCO ask the Commission to order NEPOOL and ISO New England to correct 
    computational errors made in Schedule 11 of the open access tariff 
    filed by NEPOOL on December 31, 1996 in Docket Nos. OA97-237-000 and 
    ER97-1079-000.
        Schedule 11 pertains to transition payments made to and received 
    from NEPOOL by various Participants. Boston Edison and VELCO state that 
    NEPOOL and ISO New England have refused to correct the computational 
    errors as of March 30, 1998. Boston Edison and VELCO have also 
    requested that the Commission consolidate the complaint proceeding with 
    Docket Nos. OA97-237-000 and ER97-1079-000. Boston Edison and VELCO 
    state they have served the complaint upon the Respondents.
        Comment date: May 4, 1998, in accordance with Standard Paragraph E 
    at the end of this notice. Answers to the complaint shall also be due 
    on or before May 4, 1998.
    
    6. Texas-New Mexico Power Company
    
    [Docket No. ER98-1687-000]
    
        Take notice that on March 31, 1998, Texas-New Mexico
        Power Company (TNMP), tendered for filing an amendment of TNMP's 
    filing in this docket in compliance with a Commission deficiency 
    notice.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Baltimore Gas and Electric Company
    
    [Docket No. ER98-1724-000]
    
        Take notice that on March 31, 1998, Baltimore Gas and Electric 
    Company (BGE), submitted in accordance with Section 205 of the Federal 
    Power Act and Part 35 of the Rules and Regulations of the Federal 
    Energy Regulatory Commission (Commission), 18 CFR Part 35 and as 
    directed by the Commission, an amended Service Agreement between BGE 
    and Constellation Power Source, Inc., (CPS) under which BGE may engage 
    in sales of capacity and energy to its power marketing affiliate, CPS.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Southern California Edison Company
    
    [Docket No. ER98-2318-000]
    
        Take notice that on March 26, 1998, Southern California Edison 
    Company (Edison) tendered for filing the Authorized Representatives' 
    Procedures For Post-Restructuring Operations And Accounting 
    (Procedures), and a Notice of Cancellation of various rate schedules 
    with the City of Riverside. The Procedures address issues relating to 
    the operation of the Independent System Operator (ISO) and Power 
    Exchange.
        To the extent necessary, Edison seeks waiver of the 60 day prior 
    notice requirement and requests that the Commission assign to the 
    Procedures an effective date concurrent with the date the ISO assumes 
    operational control of Edison's transmission facilities, which is 
    expected to be April 1, 1998.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Southern California Edison Company
    
    [Docket No. ER98-2319-000]
    
        Take notice that on March 26, 1998, Southern California Edison 
    Company (Edison), tendered for filing Loss Accounting Procedures for 
    Existing Contracts (Procedures) between Edison and the City of 
    Riverside (Riverside), California.
        The Procedures allow Edison and Riverside to account for 
    differences between losses pursuant to the Independent System 
    Operator's applicable loss methodology and losses pursuant to existing 
    transmission contracts, as required in the Edison-Riverside 1997 
    Restructuring Agreement (Restructuring Agreement). Edison is requesting 
    that the Procedures become effective on the date the ISO assumes 
    operational control of Edison's transmission facilities, which is 
    concurrent with the effective date of the Restructuring Agreement.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Southern California Edison Company
    
    [Docket No. ER98-2322-000]
    
        Take notice that on March 26, 1998, Southern California Edison 
    Company (Edison), tendered for filing a revised Transmission Owners 
    Tariff (TO Tariff).
        The revised TO Tariff reflects changes to the pro forma TO Tariff 
    filed on August 15, 1997 in Docket Nos. EC96-19-003 and ER96-1663-003, 
    complies with the Commission's October 30, 1997, order in Docket Nos. 
    EC96-19-001 et al., conforms the TO Tariff to the ISO Tariff, and 
    clarifies and corrects language contained in the TO Tariff.
        Edison is requesting an effective date concurrent with the date the 
    California Independent System Operator begins operations.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-2332-000]
    
        Take notice that on March 27, 1998, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing two executed service agreements with LILCO--
    The Energy Exchange Group for point-to-point service under the PJM Open 
    Access Transmission Tariff.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Entergy Services, Inc.
    
    [Docket No. ER98-2360-000]
    
        Take notice that on March 31, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Gulf States, Inc. (Entergy Gulf 
    States), tendered for filing an Interconnection and Operating Agreement 
    between Entergy Gulf States and Tenaska Frontier Partners, Ltd.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Entergy Services, Inc.
    
    [Docket No. ER98-2361-000]
    
        Take notice that on March 31, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (collectively, the Entergy
    
    [[Page 17833]]
    
    Operating Companies), tendered for filing a Non-Firm Point-To-Point 
    Transmission Service Agreement between Entergy Services, as agent for 
    the Entergy Operating Companies, and Duke Energy Power Services, Inc.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Southern California Edison Company
    
    [Docket No. ER98-2365-000]
    
        Take notice that on March 31, 1998, Southern California Edison 
    Company (Edison), tendered for filing executed Service Agreements for 
    Wholesale Distribution Service with Southern California Edison 
    Company--Generation Business Unit, and Southern California Edison 
    Company--QF Resources under Edison's Wholesale Distribution Access 
    Tariff (Tariff).
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. ERI Enterprises, L.L.C.
    
    [Docket No. ER98-2367-000]
    
        Take notice that on March 31, 1998, ERI Enterprises, L.L.C. (ERIE), 
    tendered for filing pursuant to Part 35 of the Commission's Regulations 
    and Rule 205, 18 CFR 385.205, a petition for waivers and blanket 
    approvals under various regulations of the Commission and for an order 
    accepting its FERC Electric Rate Schedule No. 1 to be effective no 
    later than May 29, 1998.
        ERIE intends to engage in electric power and energy transactions as 
    a marketer and a broker. In transactions where ERIE sells electric 
    energy it proposes to make such sales on rates, terms, and conditions 
    to be mutually agreed to with the purchasing party. ERIE is not in the 
    business of generating, transmitting, or distributing electric power.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. PP&L, Inc.
    
    [Docket No. ER98-2362-000]
    
        Take notice that on March 31, 1998, PP&L, Inc. (formerly known as 
    Pennsylvania Power & Light Company) (PP&L), filed a Service Agreement 
    dated March 20, 1998, with CMS Marketing, Services and Trading (CMS), 
    under PP&L's FERC Electric Tariff, Original Volume No. 5. The Service 
    Agreement adds CMS as an eligible customer under the Tariff.
        PP&L requests an effective date of March 31, 1998, for the Service 
    Agreement.
        PP&L states that copies of this filing have been supplied to CMS 
    and to the Pennsylvania Public Utility Commission.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. West Texas Utilities Company
    
    [Docket No. ER98-2363-000]
    
        Take notice that on March 31, 1998, West Texas Utilities Company 
    (WTU), submitted for filing Amendment No. 1 to the Power Supply 
    Agreement between WTU and the City of Hearne, Texas (Hearne). Amendment 
    No. 1 delays the date that WTU will initiate service to Hearne until 
    April 18, 1998 or a mutually agreeable later date.
        WTU seeks an effective date of April 1, 1998, for Amendment No. 1 
    and, accordingly, seeks waiver of the Commission's notice requirements. 
    Copies of the filing were served on Hearne and the Public Utility 
    Commission of Texas.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Central Power and Light Company, Public Service Company of 
    Oklahoma, Southwestern Electric Power Company, and West Texas 
    Utilities Company
    
    [Docket No. ER98-2366-000]
    
        Take notice that on March 31, 1998, Central Power and Light Company 
    (CPL), Public Service Company of Oklahoma (PSO), Southwestern Electric 
    Power Company (SWEPCO) and West Texas Utilities Company (WTU), 
    (collectively, the Companies), tendered for filing eight Service 
    Agreements establishing Rayburn Country Electric Cooperative, Inc., and 
    Tex-La Electric Cooperative of Texas, Inc., as customers under the 
    terms of each Company's CSRT-1 Tariff.
        The Companies request an effective date of March 2, 1998, for each 
    of the service agreements and, accordingly, seek waiver of the 
    Commission's notice requirements. Copies of this filing were served on 
    the two customers, the Arkansas Public Service Commission, the 
    Louisiana Public Service Commission, the Oklahoma Corporation 
    Commission and the Public Utility Commission of Texas.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Duke Energy Corporation
    
    [Docket No. ER98-2368-000]
    
        Take notice that on March 31, 1998, Duke Power, a division of Duke 
    Energy Corporation (Duke), tendered for filing a Market Rate Service 
    Agreement (the MRSA), between Duke and PP&L, Inc., dated as of March 2, 
    1998, and between Duke and Tenaska Power Services Company, dated as of 
    March 2, 1998. The parties have not engaged in any transactions under 
    the MRSA's as of the date of filing. Duke requests that the MRSA be 
    made effective as of March 2, 1998.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Southern California Edison Company
    
    [Docket No. ER98-2369-000]
    
        Take notice that on March 31, 1998, Southern California Edison 
    Company (Edison), tendered for filing an unexecuted copy of Amendment 
    No. IV (Amendment) to the Operating Procedures for the Power Contract 
    (Operating Procedures), with the Department of Water Resources of the 
    State of California (CDWR).
        The Amendment modifies the Operating Procedures to allow Edison to 
    be CDWR's Scheduling Coordinator for an interim period until CDWR is 
    able to begin acting as its own Scheduling Coordinator. Edison is 
    requesting an effective date concurrent with the date the Independent 
    System Operator begins operations.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Duke Energy Corporation
    
    [Docket No. ER98-2370-000]
    
        Take notice that on March 31, 1998, Duke Power, a division of Duke 
    Energy Corporation (Duke), tendered for filing Transmission Service 
    Agreements between Duke, on its own behalf and acting as agent for its 
    wholly-owned subsidiary, Nantahala Power and Light Company, and 
    Williams Energy Services, Company.
        The parties have not engaged in any transactions under the TSAs 
    prior to thirty (30) days of this filing. Duke requests that the TSAs 
    be made effective as rate schedules as of March 2, 1998.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 17834]]
    
    22. San Diego Gas & Electric Company
    
    [Docket No. ER98-2371-000]
    
        Take notice that on March 26, 1998, San Diego Gas & Electric 
    Company (SDG&E), tendered for filing certain revisions to the non-rate 
    terms and conditions of its Transmission Owner Tariff as filed in 
    Docket No. ER97-2364-000 on March 31, 1997. SDG&E requests that the 
    revisions be made effective as of March 31, 1998.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. Tampa Electric Company
    
    [Docket No. ER98-2372-000]
    
        Take notice that on March 31, 1998, Tampa Electric Company (Tampa 
    Electric), tendered for filing a Contract for the Purchase and Sale of 
    Power and Energy (Contract), between Tampa Electric and Southern 
    Company Energy Marketing, L.P., (SCEM). The Contract provides for the 
    negotiation of individual transactions in which Tampa Electric will 
    sell power and energy to SCEM.
        Tampa Electric proposes an effective date of April 1, 1998, for the 
    Contract, or if the Commission's notice requirement cannot be waived, 
    the earlier of May 30, 1998 or the date the Contract is accepted for 
    filing.
        Copies of the filing have been served on SCEM and the Florida 
    Public Service Commission.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. Northeast Utilities Service Company
    
    [Docket No. ER98-2373-000]
    
        Take notice that on March 31, 1998, Northeast Utilities Service 
    Company (NUSCO), tendered for filing, on behalf of The Connecticut 
    Light and Power Company (CL&P), a Second Amendment to Interruptible 
    Power Supply Service Agreement, pursuant to Section 205 of the Federal 
    Power Act and Section 35.13 of the Commission's Regulations.
        NUSCO requests that the rate schedule become effective on April 1, 
    1998. NUSCO states that copies of the rate schedule have been mailed to 
    the parties to the Agreement.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    25. Public Service Company of New Mexico
    
    [Docket No. ER98-2374-000]
    
        Take notice that on March 31, 1998, Public Service Company of New 
    Mexico (PNM), submitted for filing an executed Industrial Incentive 
    Demand Tariff Sheet between PNM and the City of Gallup, New Mexico 
    (Gallup), under Service Schedule C of the existing Contract for 
    Electric Service between PNM and Gallup. PNM's filing is available for 
    public inspection at its offices in Albuquerque, New Mexico.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. San Diego Gas & Electric Company
    
    [Docket No. ER98-2375-000]
    
        Take notice that on March 31, 1998, San Diego Gas & Electric 
    Company (SDG&E), tendered for filing Revised Original Sheet No. 53 and 
    Original Sheet 53A of the Transmission Owner Tariff. These sheets would 
    supersede Original Sheet No. 53 that it filed in Docket No. ER97-2364-
    000 on March 31, 1997 and that it subsequently amended by filing dated 
    January 30, 1998, in Docket No. ER98-1682-000. SDG&E states that the 
    proposed revisions correct a computational error in the rate for 
    certain transmission services. SDG&E requests that the revised rates be 
    made effective as of March 31, 1998.
        Comment date: April 17, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. UtiliCorp United Inc.
    
    [Docket No. ER98-2376-000]
    
        Take notice that on March 31, 1998, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, WestPlains Energy-
    Kansas, a Service Agreement under its Power Sales Tariff, FERC Electric 
    Tariff Original Volume No. 12, with Amoco Energy Trading Corporation. 
    The Service Agreement provides for the sale of capacity and energy by 
    WestPlains Energy-Kansas to Amoco Energy Trading Corporation pursuant 
    to the tariff, and for the sale of capacity and energy by Amoco Energy 
    Trading Corporation to WestPlains Energy-Kansas pursuant to Amoco 
    Energy Trading Corporation's Rate Schedule No. 1.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Amoco Energy Trading Corporation.
        UtiliCorp requests waiver of the Commission's regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. UtiliCorp United Inc.
    
    [Docket No. ER98-2377-000]
    
        Take notice that on March 31, 1998, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, Missouri Public 
    Service, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 10, with Amoco Energy Trading 
    Corporation. The Service Agreement provides for the sale of capacity 
    and energy by Missouri Public Service to Amoco Energy Trading 
    Corporation pursuant to the tariff, and for the sale of capacity and 
    energy by Amoco Energy Trading Corporation to Missouri Public Service 
    pursuant to Amoco Energy Trading Corporation's Rate Schedule No. 1.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Amoco Energy Trading Corporation.
        UtiliCorp requests waiver of the Commission's Regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    29. UtiliCorp United Inc.
    
    [Docket No. ER98-2378-000]
    
        Take notice that on March 31, 1998, UtiliCorp United Inc., tendered 
    for filing on behalf of its operating division, WestPlains Energy-
    Colorado, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 11, with Amoco Energy Trading 
    Corporation. The Service Agreement provides for the sale of capacity 
    and energy by WestPlains Energy-Colorado to Amoco Energy Trading 
    Corporation pursuant to the tariff, and for the sale of capacity and 
    energy by Amoco Energy Trading Corporation to WestPlains Energy-
    Colorado pursuant to Amoco Energy Trading Corporation's Rate Schedule 
    No. 1.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Amoco Energy Trading Corporation.
        UtiliCorp requests waiver of the Commission's Regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    30. UtiliCorp United Inc.
    
    [Docket No. ER98-2379-000]
    
        Take notice that on March 31, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed a service agreement with Amoco Energy Trading 
    Corporation for service under its Non-Firm Point-to-Point open access 
    service tariff for its operating division, WestPlains Energy-Colorado.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 17835]]
    
    31. UtiliCorp United Inc.
    
    [Docket No. ER98-2380-000]
    
        Take notice that on March 31, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed a service agreement with Amoco Energy Trading 
    Corporation for service under its Short-Term Firm Point-to-Point open 
    access service tariff for its operating division, WestPlains Energy-
    Colorado.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    32. The Montana Power Company
    
    [Docket No. ER98-2382-000]
    
        Take notice that on March 31, 1998, The Montana Power Company (MPC 
    or Company), tendered for filing its proposed Rate Schedule REC-1, 
    applicable for sales to Central Montana Electric Power Cooperative, 
    Inc., and Big Horn Electric Cooperative, Inc., and proposed adjustments 
    to its Open Access Transmission Tariff and its Control Area Services 
    Tariff.
        MPC states that based on Period II 1998 data, proposed Rate 
    Schedule REC-1 would have provided the Company with increased revenues 
    of $2,262,266 from sales to Central Montana and Big Horn. MPC states 
    that the rate increase has become necessary as a result of increasing 
    costs being incurred in providing service to these customers.
        MPC states that, so far as practical, its cost-of-service study and 
    proposed rate design for sales to Central Montana and Big Horn are 
    consistent with the cost-of-service study and rate design most recently 
    submitted to the Montana Public Service Commission.
        MPC has proposed that Rate Schedule REC-1 become effective on June 
    1, 1998.
        MPC further states that based upon Period II 1998 data, MPC is 
    proposing to update the costs for electric transmission services under 
    the Open Access Tariff and the Control Area Services Tariff and to 
    modify terms and conditions of MPC's Open Access Transmission Tariff.
        MPC has proposed that the changes to its Transmission Tariffs, 
    Second Revised Volume No. 5 and First Revised Volume No. 4, become 
    effective on June 1, 1998.
        Copies of the filing were served upon Central Montana, Big Horn, 
    the Montana Public Service Commission, Montana Consumer Counsel, 
    parties affected by MPC's Open Access Transmission Tariff and the 
    Control Area Services Tariff, and each party who has intervened in 
    MPC's retail restructuring case, Docket No. D97.7.90.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    33. Southern California Edison Company
    
    [Docket No. ER98-2384-000]
    
        Take notice that on March 31, 1998, Southern California Edison 
    Company (Edison), tendered for filing Procedures For The Scheduling Of 
    Anaheim's Entitlement In The San Onofre Nuclear Generating Station And 
    Anaheim's Satisfaction Of Its Auxiliary Power Obligations (SONGS 
    Procedures), between Edison and the City of Anaheim (Anaheim), 
    California.
        The SONGS Procedures provide for (i) the scheduling of Anaheim's 
    ownership share of San Onofre Nuclear Generating Station (SONGS); (ii) 
    exchanges of information related to the availability of SONGS; and 
    (iii) Anaheim's satisfaction of its auxiliary power obligations 
    pursuant to the Second Amended San Onofre Operating Agreement.
        Edison is requesting an effective date concurrent with the date the 
    Independent System Operator assumes operational control of Edison's 
    transmission facilities.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    34. Southern California Edison Company
    
    [Docket No. ER98-2385-000]
    
        Take notice that on March 31, 1998, Southern California Edison 
    Company (Edison), tendered for filing Amendment No. 1 (Amendment No. 1) 
    to the Edison-Vernon 1997 Restructuring Agreement between Edison and 
    the City of Vernon, California (Vernon). Included in Amendment No. 1 as 
    Attachment Nos. 1, 2, and 3 are: Amendment No. 2 to the Edison-Vernon 
    Firm Transmission Service Agreement, Amendment No. 3 to the Edison-
    Vernon Mead Firm Transmission Service Agreement, and Amendment No. 2 to 
    the Edison-Vernon Victorville-Lugo Firm Transmission Service Agreement.
        Amendment No. 1 converts the transmission loss methodology under 
    existing transmission contracts to the Independent System Operator 
    (ISO) Tariff loss methodology. Edison is requesting an effective date 
    concurrent with the date the ISO begins operations.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    35. New York State Electric & Gas Corporation
    
    [Docket No. ER98-2388-000]
    
        Take notice that on March 31, 1998, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing a short-term, firm point-to-
    point transmission service agreement between NYSEG and the New York 
    Power Authority (NYPA) at the rates described in NYSEG's filing for 
    transmission of NYPA power under a State-mandated Power For Jobs 
    Program (PFJ Program), for a limited number of PFJ Program customers 
    located within NYSEG's franchise area.
        NYSEG requests waiver of the Commission's sixty-day notice 
    requirements and an effective date of April 1, 1998, for the 
    transmission service agreement. NYSEG has served copies of the filing 
    on the NYPSC and NYPA. NYSEG has also mailed copies of the filing to 
    the PFJ Program customers currently approved by the New York State 
    Economic Development Power Allocation Board.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    36. Western Resources, Inc.
    
    [Docket No. ER98-2389-000]
    
        Take notice that on March 31, 1998, Western Resources, Inc. 
    (Western Resources) tendered for filing a proposed change in its Rate 
    Schedule FERC No. 264 and to Kansas Gas and Electric's (KGE) Rate 
    Schedule FERC No. 183. Western Resources states that the change is in 
    accordance with its Electric Power, Transmission and Service Contract 
    with Kansas Electric Power Cooperative (KEPCo), and further that the 
    proposed change for KGE is in accordance with the Electric Power, 
    Transmission and Service contract between KGE and KEPCo. Revised 
    Exhibits B set forth Nominated Capacities for transmission, 
    distribution and dispatch service for the contract year beginning June 
    1, 1998 and for the four subsequent contract years, pursuant to Article 
    IV, Section 4.1 of Rate Schedule FERC Nos. 264 and 183. Revised 
    Exhibits C set forth KEPCO's Nominated Capacities for the Points of 
    Interconnection, pursuant to Article IV, Section 4.1 of Rate Schedule 
    FERC Nos. 264 and 183. Revised Exhibits D set forth KEPCo's load 
    forecast and KEPCo's Capacity Resources intended to provide
    
    [[Page 17836]]
    
    power and energy to meet the forecast requirements for ten years into 
    the future, pursuant to Article V, Section 5.1 of Rate Schedule FERC 
    Nos. 264 and 183.
        Copies of the filing were served upon Kansas Electric Power 
    Cooperative, Inc., and the Kansas Corporation Commission.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    37. Illinois Power Company
    
    [Docket No. ER98-2390-000]
    
        Take notice that on March 31, 1998, Illinois Power Company 
    (Illinois Power), 500 South 27th Street, Decatur, Illinois 62526, 
    tendered for filing a Power Sales Tariff, Service Agreement under which 
    El Paso Energy Marketing Company will take service under Illinois Power 
    Company's Power Sales Tariff. The agreements are based on the Form of 
    Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of March 1, 1998.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    38. Wisconsin Power and Light Company
    
    [Docket No. ER98-2391-000]
    
        Take notice that on March 31, 1998, Wisconsin Power and Light 
    Company (WP&L), tendered for filing executed Form Of Service Agreements 
    for Firm and Non-Firm Point-to-Point Transmission Service, establishing 
    Engage Energy US, L.P., as a point-to-point transmission customer under 
    the terms of WP&L's transmission tariff.
        WP&L requests an effective date of February 26, 1998, and 
    accordingly, seeks waiver of the Commission's notice requirements. A 
    copy of this filing has been served upon the Public Service Commission 
    of Wisconsin.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    39. Southwestern Electric Power Company
    
    [Docket No. ER98-2392-000]
    
        Take notice that on March 31, 1998, Southwestern Electric Power 
    Company (SWEPCO), tendered for filing an estimated return on common 
    equity (Estimated ROE), to be used in establishing estimated formula 
    rates for wholesale service in Contract Year 1998 to Northeast Texas 
    Electric Cooperative, Inc., the City of Bentonville, Arkansas, the City 
    of Hope, Arkansas, Rayburn Country Electric Cooperative, Inc., Cajun 
    Electric Power Cooperative, Inc., Tex-La Electric Cooperative of Texas, 
    Inc., and East Texas Electric Cooperative, Inc. SWEPCO provides service 
    to these Customers under contracts which provide for periodic changes 
    in rates and charges determined in accordance with cost-of-service 
    formulas, including a formulaic determination of the return on common 
    equity.
        Copies of the filing were served upon the affected wholesale 
    Customers, the Public Utility Commission of Texas, the Louisiana Public 
    Service Commission and the Arkansas Public Service Commission.
        Comment date: April 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    40. Rochester Gas and Electric Corporation
    
    [Docket No. ES98-25-000]
    
        Take notice that on March 26, 1998, Rochester Gas and Electric 
    Corporation submitted an application under Section 204 of the Federal 
    Power Act for authorization to issue short-term debt in an aggregate 
    principal amount of not more than $200 million from June 1, 1988 
    through May 31, 2000.
        Comment date: April 27, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-9473 Filed 4-9-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
04/10/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-9473
Dates:
April 27, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
17831-17836 (6 pages)
Docket Numbers:
Docket No. EC98-34-000, et al.
PDF File:
98-9473.pdf