95-8842. Detroit Edison Co.; Notice of Partial Denial of Amendment to Facility Operating License and Opportunity for Hearing  

  • [Federal Register Volume 60, Number 69 (Tuesday, April 11, 1995)]
    [Notices]
    [Page 18430]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-8842]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-341]
    
    
    Detroit Edison Co.; Notice of Partial Denial of Amendment to 
    Facility Operating License and Opportunity for Hearing
    
        The U.S. Nuclear Regulatory Commission (the Commission) has 
    partially denied a request by Detroit Edison Company, (license) for an 
    amendment to Facility Operating License No. NPF-43 issued to the 
    licensee for operation of Fermi 2, located in Frenchtown Township, 
    Monroe County, Michigan. Notice of Consideration of Issuance of this 
    amendment was published in the Federal Register on August 18, 1993 (58 
    FR 43925).
        The purpose of the licensee's amendment request was to revise the 
    Technical Specifications (TS) to allow use of an updated laboratory 
    testing standard for surveillance testing of representative charcoal 
    samples from the control room emergency filtration system (CREFS) and 
    the standby gas treatment system. Additionally, the CREFS ACTION 
    STATEMENTS were to be revised to remove restrictions on CORE 
    ALTERATIONS and handling of irradiated fuel in the secondary 
    containment when the CREFS is inoperable under certain conditions.
        The NRC staff has concluded that the licensee's request cannot be 
    fully granted. The licensee was notified of the Commission's denial of 
    the proposed change by a letter dated March 31, 1995.
        By May 11, 1995, the licensee may demand a hearing with respect to 
    the denial described above. Any person whose interest may be affected 
    by this proceeding may file a written petition for leave to intervene.
        A request for hearing or petition for leave to intervene must be 
    filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555, Attention: Docketing and Services 
    Branch, or may be delivered to the Commission's Public Document Room, 
    the Gelman Building, 2120 L Street, NW., Washington, DC by the above 
    date.
        A copy of any petitions should also be sent to the Office of the 
    General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
    20555, and to John Flynn, Esq., Detroit Edison Company, 2000 Second 
    Avenue, Detroit, Michigan 48266, attorney for the licensee.
        For further details with respect to this action, see (1) the 
    application for amendment dated July 29, 1993, as supplemented October 
    8, 1993, and (2) the Commission's letter to the licensee dated March 
    31, 1995.
        These documents are available for public inspection at the 
    Commission's Public Document Room, the Gelman Building, 2120 L Street, 
    NW., Washington, DC 20555 and at the Monroe County Library System, 3700 
    South Custer Road, Monroe, Michigan 48161. A copy of item (2) may be 
    obtained upon written request addressed to the U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555, Attention: Document Control Desk.
    
        Dated at Rockville, Maryland, this 31st day of March 1995.
    
        For the Nuclear Regulatory Commission.
    Timothy G. Colburn, Sr.,
    Project Manager, Project Directorate III-I, Division of Reactor 
    Projects--III/IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-8842 Filed 4-10-95; 8:45 am]
    BILLING CODE 7590-01-M
    
    

Document Information

Published:
04/11/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-8842
Pages:
18430-18430 (1 pages)
Docket Numbers:
Docket No. 50-341