[Federal Register Volume 59, Number 70 (Tuesday, April 12, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-8653]
[[Page Unknown]]
[Federal Register: April 12, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. RP94-197-000]
Tennessee Gas Pipeline Co.; Proposed Changes in FERC Gas Tariff
April 5, 1994.
Take notice that on March 30, 1994, Tennessee Gas Pipeline Company
(Tennessee) filed a limited application pursuant to section 4 of the
Natural Gas Act, 15 U.S.C. 717c (1988), and the Rules and Regulations
of the Federal Energy Regulatory Commission (Commission) promulgated
thereunder to recover gas supply realignment costs (GSR costs) related
to the period October 1, 1993 through December 31, 1993. Tennessee
proposes that the filing be made effective May 1, 1994. The tariff
sheets to permit recovery of such costs are as follows:
Third Revised Sheet No. 22
Third Revised Sheet No. 24
Sixth Revised Sheet No. 30
First Revised Sheet No. 398A
Original Sheet No. 398A.01
Tennessee states that the purpose of the filing in this docket is
to set forth the GSR costs and the related rates that will be charged
by Tennessee pursuant to Order No. 636 and an ``Order Rejecting Tariff
Sheets,'' issued on February 28, 1994 in Docket No. RP94-127-000, 66
FERC 61,248 (1994). The GSR costs sought to be recovered include costs
associated with the reformation or termination of certain supply
contracts as well as pricing differentials costs associated with
continuing to perform under certain gas supply contracts, including the
Great Plains Associates contract.
Tennessee states that copies of this tariff filing were posted in
conformance with Sec. 154.16 of the Commission's Regulations and in
conformity therewith were mailed to all affected customers of Tennessee
and interested state commissions.
Take further notice that in compliance with the Commission's
``Order on Rehearing and Compliance Filing,'' issued on February 28,
1994 in Docket Nos. RP93-151-004 et al., 66 FERC 61,246 (1994),
Tennessee has filed tariff sheets to revise its mechanism for
recovering GSR costs. The tariff sheet, which Tennessee proposes be
made effective March 1, 1994, is as follows:
Fifth Revised Sheet No. 30
Take further notice that Tennessee filed tariff sheets to reduce
its currently-effective GSR surcharge filed in Docket No. RP94-39-000.
Tennessee states that such reduction, which Tennessee proposes be made
effective March 1, 1994, is to reflect that the amortization period for
recovering pricing differential costs related to that docket ended on
February 28, 1994. The tariff sheets filed by Tennessee to effectuate
this proposal are as follows:
Second Revised Sheet No. 395
Second Revised Sheet No. 396
Second Revised Sheet No. 397
Second Revised Sheet No. 397A
Second Revised Sheet No. 398
Original Sheet No. 398A
Original Sheet No. 398B
Original Sheet No. 398C
Any person desiring to be heard or to protest the filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426 in accordance with rules 211 and 214 of the Commission's Rules of
Practice and Procedure. All such motions or protests should be filed on
or before April 12, 1994. Protests will be considered by the Commission
in determining the appropriate action to be taken, but will not serve
to make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public
inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-8653 Filed 4-11-94; 8:45 am]
BILLING CODE 6717-01-M