94-8673. Gary Marina, Supplement to the Draft Environmental Impact Statement  

  • [Federal Register Volume 59, Number 70 (Tuesday, April 12, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-8673]
    
    
    [[Page Unknown]]
    
    [Federal Register: April 12, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    National Park Service
    
     
    
    Gary Marina, Supplement to the Draft Environmental Impact 
    Statement
    
    AGENCY: National Park Service, Interior.
    
    ACTION: Availability of supplement to the draft environmental impact 
    statement for the Gary Marina, adjacent to Indiana Dunes National 
    Lakeshore.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Pursuant to section 102(2)(c) of the National Environmental 
    Policy Act of 1969, the National Park Service (NPS) announces the 
    availability of a supplement to the draft environmental impact 
    statement (DEIS) for the Gary Marina. The city of Gary proposes to 
    construct a marina on Lake Michigan adjacent to the west boundary of 
    Indiana Dunes National Lakeshore. The proposed marina would require an 
    access road through Indiana Dunes National Lakeshore. The supplement to 
    the DEIS was prepared by the city of Gary and the NPS.
        The city of Gary and the NPS's preferred alternative for marina 
    access is identified in the supplement to the DEIS as the ``proposed'' 
    access alternative; construction of an access road on the abandoned 
    Indiana Harbor Belt Railroad bed, within the west end of Indiana Dunes 
    National Lakeshore, and on U.S. Steel Corporation property, adjacent 
    to, but outside, Indiana Dunes National Lakeshore. This is a new 
    alternative that was not previously described in the DEIS of April 
    1989. The new alternative was developed in response to public and 
    agency comment on the DEIS. Many comments called for the development of 
    an access alternative with less impact to Indiana Dunes National 
    Lakeshore than those presented in the DEIS.
        The city of Gary and the NPS's preferred alternative for the marina 
    location is identified in the DEIS as Site 1, which is behind an 
    existing breakwater on land currently owned by U.S. Steel Corporation. 
    All other marina site alternatives described in the DEIS have been 
    eliminated from further consideration.
        Comments on the Supplement to the DEIS should be received no later 
    than June 7, 1994.
        Comments on the supplement to the DEIS should be submitted to: Mr. 
    Dale Engquist, Superintendent, Indiana Dunes National Lakeshore, 1100 
    N. Mineral Springs Road, Porter, Indiana 46304, (219) 926-7561
        Public reading copies of the supplement to the DEIS and the 1989 
    DEIS, will be available for review at the following locations:
    
    Office of Public Affairs, National Park Service, Department of the 
    Interior, 18th and C Streets, NW., Washington, DC 20240, (202) 343-6843
    Headquarters and Visitor Center (corner of Hwy 12 and Kemil Road), 
    Indiana Dunes National Lakeshore, 1100 N. Mineral Springs Road, Porter, 
    Indiana 46304, (219) 926-7561
    City Hall, City of Gary, 401 Broadway, Gary, Indiana 46402, (219) 881-
    1332
    Gary Public Library, City of Gary, 220 West 5th Avenue, Gary, Indiana, 
    46402, (219) 886-2484
    
        A limited number of the supplement to the DEIS and the 1989 DEIS 
    are available on request from the Superintendent, Indiana Dunes 
    National Lakeshore (refer to address above).
    
        Dated: March 28, 1994.
    F.A. Calabrese,
    Acting Regional Director, Midwest Region.
    [FR Doc. 94-8673 Filed 4-11-94; 8:45 am]
    BILLING CODE 4310-70-P
    
    
    

Document Information

Published:
04/12/1994
Department:
National Park Service
Entry Type:
Uncategorized Document
Action:
Availability of supplement to the draft environmental impact statement for the Gary Marina, adjacent to Indiana Dunes National Lakeshore.
Document Number:
94-8673
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: April 12, 1994