04-8286. Nuclear Management Company, LLC, Point Beach Nuclear Plant, Units 1 and 2; Notice of Acceptance for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License Nos. DPR-24 and DPR-27 ...  

  • Start Preamble

    The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering application for the renewal of Operating License Nos. DPR-24 and DPR-27, which authorize the Nuclear Management Company, LLC, to operate the Point Beach Nuclear Plant, Units 1 and 2 at 1540 megawatts thermal for each unit. The renewed licenses would authorize the applicant to operate the Point Beach Nuclear Plant, Units 1 and 2, for an additional 20 years beyond the period specified in the current licenses. The current operating license for the Point Beach Nuclear Plant, Unit 1 expires on October 5, 2010, and the current operating license for the Point Beach Nuclear Plant, Unit 2 expires on March 8, 2013.

    On February 26, 2004, the Commission's staff received an application from Nuclear Management Company, LLC filed pursuant to 10 CFR Part 54, to renew the Operating License Nos. DPR-24 and DPR-27 for Point Beach Nuclear Plant, Units 1 and 2, respectively. A Notice of Receipt and Availability of the license renewal application, “Nuclear Management Company, LLC; Notice of Receipt and Availability of Application for Renewal of Point Beach Nuclear Plant, Units 1 and 2, Facility Operating License Nos. DPR-24 and DPR-27 for Additional 20-Year Period,” was published in the Federal Register on March 8, 2004 (69 FR 10765).

    The Commission's staff has determined that Nuclear Management Company, LLC has submitted sufficient information in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, and 51.53(c) that is acceptable for docketing. The current Docket Nos. 50-266 and 50-301 for Operating License Nos. DPR-24 and DPR-27, respectively, will be retained. The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application.

    Before issuance of each requested renewed license, the NRC will have made the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. In accordance with 10 CFR 54.29, the NRC will issue a renewed license on the basis of its review if it finds that actions have been identified and have been or will be taken with respect to: (1) Managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified as requiring aging management review, and (2) time-limited aging analyses that have been identified as requiring review, such that there is reasonable assurance that the activities authorized by the renewed licenses will continue to be conducted in accordance with the current licensing basis (CLB), and that any changes made to the plant's CLB comply with the Act and the Commission's regulations.

    Additionally, in accordance with 10 CFR 51.95(c), the NRC will prepare an environmental impact statement that is a supplement to the Commission's NUREG-1437, “Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants,” dated May 1996. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold a public scoping meeting. Detailed information regarding this meeting will be the subject of a separate Federal Register notice.

    Within 60 days after the date of publication of this Federal Register Notice, the requestor/petitioner may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the licenses. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's “Rules of Practice for Domestic Licensing Proceedings” in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at http://www.nrc.gov/​reading-rm/​adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's PDR reference staff at 1-800-397-4209, or by email at pdr@nrc.gov. If a request for a hearing or a petition for leave to intervene is filed within the 60-Start Printed Page 19560day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing or petition for leave to intervene is filed within the 60-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR parts 51 and 54, renew the licenses without further notice.

    As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding, taking into consideration the limited scope of matters that may be considered pursuant to 10 CFR parts 51 and 54. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1) The nature of the requestor's/petitioner's right under Act to be made a party to the proceeding; (2) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.

    Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact.1 Contentions shall be limited to matters within the scope of the action under consideration. The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.

    Each contention shall be given a separate numeric or alpha designation within one of the following groups and all like subject-matters shall be grouped together:

    1. Technical—primarily concerns issues relating to technical and/or health and safety matters discussed or referenced in the Point Beach Nuclear Plant, Units 1 and 2 safety analysis for the application (including issues related to emergency planning and physical security to the extent that such matters are discussed or referenced in the application).

    2. Environmental—primarily concerns issues relating to matters discussed or referenced in the Environmental Report for the license renewal application

    3. Miscellaneous—does not fall into one of the categories outlined above.

    As specified in 10 CFR 2.309, if two or more requestors/petitioners seek to co-sponsor a contention or propose substantially the same contention, the requestors/petitioners will be required to jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention within ten (10) days after advised of such contention.

    Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; (2) courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff; (3) Email addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, HEARINGDOCKET@NRC.GOV; or (4) facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966. A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by email to OGCMailCenter@nrc.gov. A copy of the request for hearing and petition for leave to intervene should also be sent to the attorney for the licensee. Attorney for the Applicant: David R. Lewis, Esq., Shaw Pittman, 2300 N Street, NW., Washington, DC 20037.

    Nontimely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).

    Detailed information about the license renewal process can be found under the Nuclear Reactors icon at http://www.nrc.gov/​reactors/​operating/​licensing/​renewal.html on the NRC's Web page. Copies of the application to renew the operating licenses for the Point Beach Nuclear Plant, Units 1 and 2, are available for public inspection at the Commission's PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20855-2738, and at http://www.nrc.gov/​reactors/​operating/​licensing/​renewal/​applications/​point-beach.html the NRC's Web page while the application is under review. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. These documents may be accessed through the NRC's Public Electronic Reading Room on the Internet at http://www.nrc.gov/​reading-rm/​adams.html under ADAMS accession number ML040580020. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, may contact the NRC Public Document Room (PDR) Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.

    The staff has verified that a copy of the license renewal application is also available to local residents near the Point Beach Nuclear Plant at the Lester Public Library, at 1001 Adams Street, Two Rivers, Wisconsin 54241.

    Start Signature

    Dated at Rockville, Maryland, this the 7th day of April 2004

    Start Printed Page 19561

    For the Nuclear Regulatory Commission.

    Pao-Tsin Kuo,

    Program Director, License Renewal and Environmental Impacts, Division of Regulatory Improvement Programs, Office of Nuclear Reactor Regulation.

    End Signature End Preamble

    [FR Doc. 04-8286 Filed 4-12-04; 8:45 am]

    BILLING CODE 7590-01-U

Document Information

Published:
04/13/2004
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
04-8286
Pages:
19559-19561 (3 pages)
Docket Numbers:
Docket Nos. 50-266 and 50-301
PDF File:
04-8286.pdf