Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from regulations.
SUMMARY:
The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Norfolk Southern Railroad vertical lift span bridge across the Black Warrior River, mile 267.8, at Eutaw, Greene County, Alabama. This deviation provides for the bridge to remain closed to navigation for twelve hours in order to perform scheduled maintenance.
DATES:
This deviation is effective from 8 a.m. until 8 p.m. on Friday, May 1, 2009.
ADDRESSES:
Documents indicated in this preamble as being available in the docket are part of docket USCG-2009-0231 and are available online at www.regulations.gov. They are also available for inspection or copying at two locations: The Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays; and the office of the Eighth Coast Guard District, Bridge Administration Branch, Hale Boggs Federal Building, Room 1313, 500 Poydras Street, New Orleans, Louisiana 70130-3310 between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
David Frank, Bridge Administration Branch, telephone (504) 671-2128.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Norfolk Southern Corporation has requested a temporary deviation in order to perform maintenance on the Norfolk Southern Railroad vertical lift span bridge across the Black Warrior River, mile 267.8, at Eutaw, Greene County, Alabama. This maintenance is necessary to make mechanical repairs to the lift towers of the bridge. This temporary deviation will allow the bridge to remain closed to navigation from 8 a.m. until 8 p.m. on Friday, May 1, 2009. During the closure the draw will not be able to open for emergencies. Currently, the draw opens on signal for the passage of vessels.
The Norfolk Southern Railroad vertical lift span drawbridge has a vertical clearance of 18.3 feet above BRENC, elevation 99.2 feet, in the closed-to-navigation position and 72 feet above BRENC in the open-to-navigation position. Navigation on the waterway consists primarily of tugs with tows and occasional recreational craft. The Coast Guard has coordinated this closure with the Warrior-Tombigbee Waterway Association (WTWA). The WTWA representative indicated that the vessel operators will be able to schedule Start Printed Page 16782transits through the bridge such that operations will not significantly be hindered. Thus, it has been determined that this closure will not have a significant effect on these vessels. This closure is considered necessary for maintenance of the bridge.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: March 30, 2009.
David M. Frank,
Bridge Administrator.
[FR Doc. E9-8285 Filed 4-10-09; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 5/1/2009
- Published:
- 04/13/2009
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from regulations.
- Document Number:
- E9-8285
- Dates:
- This deviation is effective from 8 a.m. until 8 p.m. on Friday, May 1, 2009.
- Pages:
- 16781-16782 (2 pages)
- Docket Numbers:
- USCG-2009-0231
- PDF File:
- e9-8285.pdf
- CFR: (1)
- 33 CFR 117