95-9204. Public Notice of Intent To Conduct Public Scoping Meetings and a Site Visit  

  • [Federal Register Volume 60, Number 72 (Friday, April 14, 1995)]
    [Notices]
    [Page 19035]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-9204]
    
    
    
    [[Page 19035]]
    
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Project No. P-11495-000]
    
    
    Public Notice of Intent To Conduct Public Scoping Meetings and a 
    Site Visit
    
    April 7, 1995.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Original for Major Project.
        b. Project No.: 11495-000.
        c. Date filed: August 26, 1994.
        d. Applicant: Nooksack River Hydro, Inc., Bothell, WA.
        e. Name of Project: Clearwater Creek.
        f. Location: On Clearwater Creek, near Deming, Whatcom County, WA.
        g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
        h. Applicant Contact: Mr. Lon Covin, Hydro West Group, Inc., 1422 
    130th Avenue NE., Bellevue, WA 98005, (206) 455-0234.
        i. FERC Contact: Mr. Surender M. Yepuri, P.E., (202) 219-2847.
        j. Deadline date for written comments on scoping (environmental 
    issues): May 26, 1995.
        k. Status of Environmental Analysis: On December 15, 1994, the 
    Federal Energy Regulatory Commission (FERC) issued a Notice of Intent 
    to Prepare an Environmental Impact Statement (EIS) for the Clearwater 
    Creek Project (FERC No. 11495) and Warm Creek Project (FERC No. 10865).
        l. Intent to Conduct Public Scoping Meetings: Two scoping meetings 
    will be conducted on Tuesday, May 9, 1995, at 7:00 p.m., and Wednesday, 
    May 10, 1995, at 10:00 a.m.
        Location: Hampton Inn, 3985 Bennett Drive, Bellingham, WA 98225.
        Interested individuals, organizations, and agencies with 
    environmental expertise are invited to attend either or both meetings 
    and assist the staff in identifying the scope of environmental issues 
    that should be analyzed in the EIS.
        To help focus discussions at the meetings, a scoping document 
    outlining subject areas to be addressed in the EIS will be mailed to 
    agencies and interested individuals on the Commission mailing list. 
    Copies of the scoping document will also be available at the scoping 
    meetings.
        Persons choosing not to speak at the meetings, but who have views 
    on issues or information relevant to the issues, may submit written 
    statements for inclusion in the public record at the meeting. In 
    addition, written comments may be filed with the Secretary, Federal 
    Energy Regulatory Commission, 825 North Capitol Street NE., Washington, 
    DC, 20426, by the deadline date shown in Item (j) above. All written 
    correspondence should clearly show the following caption on the first 
    page: Clearwater Creek Hydro Project, FERC No. 11495.
        Intervenors--those on the Commission's service list for this 
    proceeding (parties)--are reminded of the Commission's Rules of 
    Practice and Procedure, requiring parties filing documents with the 
    Commission to serve a copy of the document on each person whose name 
    appears on the official service list.\1\ Further, if a party or 
    interceder files comments or documents with the Commission relating to 
    the merits of an issue that may affect the responsibilities of a 
    particular resource agency, they must also serve a copy of the document 
    on that resource agency.
    
        \1\The official service list can be obtained by calling the 
    Office of the Secretary, Dockets Branch at (202) 208-2020.
    ---------------------------------------------------------------------------
    
        Site Visit: A site visit to the Clearwater Creek Hydro project is 
    planned for May 9, 1995. Those who wish to attend should plan to meet 
    at 9:00 a.m. at the Acme Country Kitchen on Route 9 in Acme, 
    Washington.
        m. Description of Project: The proposed project would consist of: 
    (1) A 10-foot-high, 75-foot-long reinforced concrete diversion weir 
    with a crest elevation of 1,665 feet on the National Geodetic Vertical 
    Datum; (2) a 40-foot-wide, 80-foot-long, and 18-foot-high concrete 
    intake structure; (3) a 63-inch-diameter, 8,785-foot-long steel 
    penstock; (4) a 48-foot-wide, 48-foot-long, and 35-foot-high concrete 
    powerhouse equipped with a vertical Pelton turbine generator unit with 
    a rated capacity of 6.0 MW; (5) an 80-foot-long tailrace; (6) a 35-kV, 
    11.4-mile-long transmission line; and (7) appurtenant equipment.
        n. Purpose of Project: Project power would be sold to a local 
    utility.
        o. Available Locations of Application: A copy of the application, 
    as amended and supplemented, is available for inspection and 
    reproduction at the Commission's Public Reference and Files Maintenance 
    Branch, located at 941 North Capitol Street NE., Room 3104, Washington, 
    DC 20426, or by calling (202) 208-1371. A copy is also available for 
    inspection and reproduction at the applicant's office (see item (h) 
    above).
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-9204 Filed 4-13-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
04/14/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-9204
Pages:
19035-19035 (1 pages)
Docket Numbers:
Project No. P-11495-000
PDF File:
95-9204.pdf