[Federal Register Volume 60, Number 72 (Friday, April 14, 1995)]
[Notices]
[Page 19035]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-9204]
[[Page 19035]]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-11495-000]
Public Notice of Intent To Conduct Public Scoping Meetings and a
Site Visit
April 7, 1995.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Original for Major Project.
b. Project No.: 11495-000.
c. Date filed: August 26, 1994.
d. Applicant: Nooksack River Hydro, Inc., Bothell, WA.
e. Name of Project: Clearwater Creek.
f. Location: On Clearwater Creek, near Deming, Whatcom County, WA.
g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
h. Applicant Contact: Mr. Lon Covin, Hydro West Group, Inc., 1422
130th Avenue NE., Bellevue, WA 98005, (206) 455-0234.
i. FERC Contact: Mr. Surender M. Yepuri, P.E., (202) 219-2847.
j. Deadline date for written comments on scoping (environmental
issues): May 26, 1995.
k. Status of Environmental Analysis: On December 15, 1994, the
Federal Energy Regulatory Commission (FERC) issued a Notice of Intent
to Prepare an Environmental Impact Statement (EIS) for the Clearwater
Creek Project (FERC No. 11495) and Warm Creek Project (FERC No. 10865).
l. Intent to Conduct Public Scoping Meetings: Two scoping meetings
will be conducted on Tuesday, May 9, 1995, at 7:00 p.m., and Wednesday,
May 10, 1995, at 10:00 a.m.
Location: Hampton Inn, 3985 Bennett Drive, Bellingham, WA 98225.
Interested individuals, organizations, and agencies with
environmental expertise are invited to attend either or both meetings
and assist the staff in identifying the scope of environmental issues
that should be analyzed in the EIS.
To help focus discussions at the meetings, a scoping document
outlining subject areas to be addressed in the EIS will be mailed to
agencies and interested individuals on the Commission mailing list.
Copies of the scoping document will also be available at the scoping
meetings.
Persons choosing not to speak at the meetings, but who have views
on issues or information relevant to the issues, may submit written
statements for inclusion in the public record at the meeting. In
addition, written comments may be filed with the Secretary, Federal
Energy Regulatory Commission, 825 North Capitol Street NE., Washington,
DC, 20426, by the deadline date shown in Item (j) above. All written
correspondence should clearly show the following caption on the first
page: Clearwater Creek Hydro Project, FERC No. 11495.
Intervenors--those on the Commission's service list for this
proceeding (parties)--are reminded of the Commission's Rules of
Practice and Procedure, requiring parties filing documents with the
Commission to serve a copy of the document on each person whose name
appears on the official service list.\1\ Further, if a party or
interceder files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
\1\The official service list can be obtained by calling the
Office of the Secretary, Dockets Branch at (202) 208-2020.
---------------------------------------------------------------------------
Site Visit: A site visit to the Clearwater Creek Hydro project is
planned for May 9, 1995. Those who wish to attend should plan to meet
at 9:00 a.m. at the Acme Country Kitchen on Route 9 in Acme,
Washington.
m. Description of Project: The proposed project would consist of:
(1) A 10-foot-high, 75-foot-long reinforced concrete diversion weir
with a crest elevation of 1,665 feet on the National Geodetic Vertical
Datum; (2) a 40-foot-wide, 80-foot-long, and 18-foot-high concrete
intake structure; (3) a 63-inch-diameter, 8,785-foot-long steel
penstock; (4) a 48-foot-wide, 48-foot-long, and 35-foot-high concrete
powerhouse equipped with a vertical Pelton turbine generator unit with
a rated capacity of 6.0 MW; (5) an 80-foot-long tailrace; (6) a 35-kV,
11.4-mile-long transmission line; and (7) appurtenant equipment.
n. Purpose of Project: Project power would be sold to a local
utility.
o. Available Locations of Application: A copy of the application,
as amended and supplemented, is available for inspection and
reproduction at the Commission's Public Reference and Files Maintenance
Branch, located at 941 North Capitol Street NE., Room 3104, Washington,
DC 20426, or by calling (202) 208-1371. A copy is also available for
inspection and reproduction at the applicant's office (see item (h)
above).
Lois D. Cashell,
Secretary.
[FR Doc. 95-9204 Filed 4-13-95; 8:45 am]
BILLING CODE 6717-01-M