[Federal Register Volume 63, Number 71 (Tuesday, April 14, 1998)]
[Notices]
[Page 18191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-9737]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-321-000]
Texas Gas Transmission Corporation; Notice of Request Under
Blanket Authorization
April 8, 1998.
Take notice that on April 1, 1998, Texas Gas Transmission
Corporation (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky
42301, filed in Docket No. CP98-321-000 a request pursuant to
Secs. 157.205, 157.208, 157.211, and 157.212 of the Commission's
Regulations under the Natural Gas Act (18 CFR 157.205, 157.208,
157.211, 157.212) for authorization to install, own, and operate
approximately 2.42 miles of 8-inch pipeline loop and install an
additional 4-inch meter run at an existing meter station under Texas
Gas's blanket certificate issued in Docket No. CP82-407-000 pursuant to
Section 7 of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
Texas Gas states that it proposes to install, own, and operate
approximately 2.42 miles of 8-inch pipeline looping its existing
Humboldt 6-inch pipeline located in Madison County, Tennessee. Texas
Gas also plans to install an additional 4-inch meter run at its
existing 6-inch Jackson No. 4 meter station, also located in Madison
County, Tennessee.
Texas Gas states that these facilities are being installed in order
to accommodate a total increase in winter firm service of 3,800 MMBtu
per day which has been requested by three (3) of Texas Gas's existing
local distribution company customers served by Texas Gas's Ripley-
Jackson system; Jackson Utility Division, the Town of Humboldt,
Tennessee, and the city of Brownsville, Tennessee. The estimated cost
of the proposed facilities is $950,000.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boegers,
Acting Secretary.
[FR Doc. 98-9737 Filed 4-13-98; 8:45 am]