97-9638. Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals  

  • [Federal Register Volume 62, Number 72 (Tuesday, April 15, 1997)]
    [Notices]
    [Pages 18381-18383]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-9638]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Aviation Administration
    
    
    Notice of Passenger Facility Charge (PFC) Approvals and 
    Disapprovals
    
    AGENCY: Federal Aviation Administration (FAA), DOT.
    
    ACTION: Monthly Notice of PFC Approvals and Disapprovals. In March 
    1997, there were six applications approved. Additionally, six approved 
    amendments to previously approved applications are listed.
    
    -----------------------------------------------------------------------
    
    [[Page 18382]]
    
    SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
    approvals and disapprovals under the provisions of 49 U.S.C. 40117 
    (Pub. L. 103-272) and Part 158 of the Federal Aviation Regulations (14 
    CFR Part 158). This notice is published pursuant to paragraph d of 
    Sec. 158.29.
    
    PFC applications approved
    
        Public Agency: City of Morgantown, West Virginia.
        Application Number: 97-04-U-00-MGW.
        Application Type: Use PFC revenue.
        PFC Level: $3.00.
        Total PFC Revenue To Be Used in This Decision: $50,850.
        Charge Effective Date: December 1, 1994.
        Estimated Charge Expiration Date: May 1, 2001.
        Class of Air Carriers Not Required To Collect PFC's: No change from 
    previous approval.
        Brief Description of Project Approved for Use: Rehabilitation of 
    taxiway A.
        Decision Date: March 3, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Elonza Turner, Beckley Airports Field 
    Office, (304) 252-6216.
    
        Public Agency: Southeast Iowa Regional Airport Authority, 
    Burlington, Iowa.
        Application Number: 96-01-C-00-BRL.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total Net PFC Revenue Approved in This Application: $460,000.
        Estimated Charge Effective Date: July 1, 1997.
        Estimated Charge Expiration Date: April 1, 2003.
        Class of Air Carriers Not Required To Collect PFC's: None.
        Brief Description of Projects Approved for Collection and Use: 
    Security fence, Lighting, signage, and reflectors, Aircraft rescue and 
    firefighting (ARFF) vehicle, Airport master plan update, Land 
    acquisition (Tract 601), Land acquisition (Tract 602), Land acquisition 
    (Tract 603), Runway 18/36 high intensity runway lights and airfield 
    signage, Emergency generator, Runway 12/30 rehabilitation and narrowing 
    (Phase 1), Runway 12/30 edge drains feasibility study, Snow removal 
    equipment, Joint-use ARFF station design, Design rehabilitation of 
    taxilane and service road, New terminal feasibility study, Rehabilitate 
    taxilane and road (construction), Runway 12/30 rehabilitation and 
    narrowing (Phase II), Joint-use ARFF station (construction).
        Brief Description of Withdrawn Project: Runway 18/36 rehabilitation 
    design.
        Determination: This project was withdrawn by the public agency in 
    its supplemental application dated November 1, 1996. Therefore, the FAA 
    will not rule on this project in this decision.
        Decision Date: March 4, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Lorna Sandridge, Central Region 
    Airports Division, (816) 426-4730.
    
        Public Agency: Springfield Airport Authority, Springfield, 
    Illinois.
        Application Number: 97-08-C-00-SPI.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total Net PFC Revenue Approved in This Decision: $3,889,393.
        Estimated Charge Effective Date: February 1, 2006.
        Estimated Charge Expiration Date: May 1, 2007.
        Class of Air Carriers Not Required To Collect PFC's: On-demand air 
    taxis.
        Determination: Approved. Based on information contained in the 
    public agency's application, the FAA has determined that the proposed 
    class accounts for less than 1 percent of the total annual enplanements 
    at Capital Airport.
        Brief Description of Projects Approved for Authority To Use PFC 
    Revenue: Land acquisition-noise (parcels 9-4-EE, 9-4-FF, 9-4-HH, 9-4-
    II, 9-4-JJ, and 17-3-A), Land acquisition (parcels 9-4-J, 9-4-PP, and 
    9-4-P), Land acquisition (parcels 16-4-A, 16-4-B1, 16-4-B2, and 16-4-
    C), Land acquisition (parcels 16-2-B and 16-4-E), Rehabilitate runways 
    4/22 and 18/36, Rehabilitate runway 13/31, Widen taxiway A, Exhibit A, 
    update master plan, Snow equipment (blower and snowplow), Terminal 
    building expansion, Disabled passenger lift.
        Brief Description of Project Approved for Collection and Use: Snow 
    removal equipment (sweeper).
        Decision Date: March 11, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Philip M. Smithmeyer, Chicago Airports 
    District Office, (847) 294-7435.
    
        Public Agency: New Orleans Airport Board, New Orleans, Louisiana.
        Application Number: 96-03-C-00-MSY.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total Net PFC Revenue Approved in This Decision: $11,963,536.
        Estimated Charge Effective Date: December 1, 2008.
        Estimated Charge Expiration Date: August 1, 2009.
        Class of Air Carriers Not Required To Collect PFC'S: Air taxi/
    commercial operators.
        Determination: Approved. Based on information contained in the 
    public agency's application, the FAA has determined that the proposed 
    class accounts for less than 1 percent of the total annual enplanements 
    at New Orleans International Airport.
        Brief Description of Projects Approved for Use: ARFF perimeter 
    road, stage II, ARFF perimeter road, stage III, East air cargo apron, 
    stage II.
        Brief Description of Project Approved for Collection: Terminal 
    improvements.
        Brief Description of Withdrawn Project: East/west taxiway land 
    acquisition.
        Determination: This project was withdrawn by the public agency in 
    its letter dated January 31, 1997. Therefore, the FAA will not rule on 
    this project in this decision. In addition, the project no longer meets 
    the requirements of Sec. 158.33(c)(1) and has automatically expired.
        Decision Date: March 24, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Ben Guttery, Southwest Region Airports 
    Division, (817) 222-5614.
    
        Public Agency: Horry County Department of Airports, Myrtle Beach, 
    South Carolina.
        Application Number: 97-02-C-00-MYR.
        Application Type: Impose and use a PFC.
        PFC LEVEL: $3.00.
        Total Net PFC Revenue Approved in This Decision: $14,121,635.
        Estimated Charge Effective Date: July 1, 2005.
        Estimated Charge Expiration Date: July 1, 2010.
        Class of Air Carriers Not Required To Collect PFC'S: Nonscheduled 
    air taxi/commercial operators filing FAA Form 1800-31.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the proposed 
    class accounts for less than 1 percent of the total annual emplanements 
    at Myrtle Beach International Airport.
        Brief Description of Project Approved for Collection and Use: 
    Terminal A baggage claim expansion.
        Brief Description of Project Partially Approved for Collection and 
    Use: Preparation of PFC application.
        Determination: Partially and conditionally approved. Documents 
    submitted to the FAA in support of this project were insufficient to 
    establish that project elements contained in the contract between the 
    public agency and
    
    [[Page 18383]]
    
    its consultant were necessary for the preparation of a PFC application. 
    The approved amount was limited to the amount invoiced by the public 
    agency's consultant for preparation of the PFC application.
        Decision Date: March 24, 1997.
    
    FOR FURTHER INFORMATION CONTACT: D. Cameron Bryan, Atlanta Airports 
    District Office, (404) 305-7144.
    
        Public Agency: Spokane Airport Board, Spokane, Washington.
        Application Number: 97-03-C-00-GEG.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total Net PFC Revenue Approved in This Decision: $17,606,000.
        Estimated Charge Effective Date: May 1, 2000.
        Estimated Charge Expiration Date: June 1, 2005.
        Class of Air Carriers Not Required To Collect PFC'S: None.
        Brief Description of Projects Approved for Collection and Use: 
    Master plan update, Airport terminal signage, Fire life safety system, 
    Taxiways D and H, Taxiway J relocation, Multiple use apron 
    rehabilitation (identified as apron G), Multiple use apron 
    construction, Regional terminal concourse expansion and associated 
    apron, Terminal ticketing/baggage expansion.
        Decision Date: March 24, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Mary Vargas, Seattle Airports District 
    Office, (206) 227-2660.
    
    Amendments To PFC Approvals
    
    ----------------------------------------------------------------------------------------------------------------
                                                                                         Original         Amended   
                                         Amendment       Original         Amended        estimated       estimated  
       Amendment No., city, state      approved date   approved net    approved net     charge exp.     charge exp. 
                                                        PFC revenue     PFC revenue        date            date     
    ----------------------------------------------------------------------------------------------------------------
    92-01-C-03-BNA,.................        07/01/96     $75,480,900     $87,729,800        10/01/99        01/01/02
    Nashville, Tennessee                                                                                            
    92-01-C-03-CLE,.................        03/25/96      38,343,640      37,343,640        02/01/97        02/01/97
    Cleveland, Ohio                                                                                                 
    93-01-C-01-MOT,.................        06/19/96       1,569,483         646,047        11/01/98        04/01/97
    Minot, North Dakota                                                                                             
    95-03-C-01-CLE,.................        08/27/96      19,475,642      21,500,642        02/01/97        08/01/97
    Cleveland, Ohio                                                                                                 
    92-01-C-02-MHT,.................        12/18/96      5,702,523,       5,679,523        09/01/97        09/01/97
    Manchester, New Hampshire                                                                                       
    93-01-C-03-RHI,.................        01/21/97         188,951         183,301        10/01/00        10/01/00
    Rhinelander, Wisconsin                                                                                          
    ----------------------------------------------------------------------------------------------------------------
    
    
        Issued in Washington, D.C. on April 10, 1997.
    Kendall Ball,
    Acting Manager, Passenger Facility Charge Branch.
    [FR Doc. 97-9638 Filed 4-14-97; 8:45 am]
    BILLING CODE 4910-13-M
    
    
    

Document Information

Effective Date:
12/1/1994
Published:
04/15/1997
Department:
Federal Aviation Administration
Entry Type:
Notice
Action:
Monthly Notice of PFC Approvals and Disapprovals. In March 1997, there were six applications approved. Additionally, six approved amendments to previously approved applications are listed.
Document Number:
97-9638
Dates:
December 1, 1994.
Pages:
18381-18383 (3 pages)
PDF File:
97-9638.pdf