E7-7146. Egan Hub Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Egan Fourth Cavern Project and Request for Comments on Environmental Issues
-
Start Preamble
April 9, 2007.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Egan Fourth Cavern Project, involving construction and operation of facilities by Egan Hub Gas Storage, LLC (Egan Hub) in Acadia and Evangeline Parishes, Louisiana. The EA will be used by the Commission in its decision-making process to determine whether or not to authorize the project.
This notice announces the opening of the scoping period that will be used to gather environmental input from the public and interested agencies on the project. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on May 9, 2007.
An effort is being made to send this notice to all individuals, organizations, Native American Tribes, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within distances defined in the Commission's regulations of certain aboveground facilities. We[1] encourage government representatives to notify their constituents of this planned Start Printed Page 18977project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The pipeline company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings in accordance with state law.
A fact sheet prepared by the FERC entitled “An Interstate Natural Gas Facility on My Land? What Do I Need to Know?” addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission's proceedings. It is available for viewing on the FERC Internet Web site (http://www.ferc.gov).
Summary of the Proposed Project
Egan Hub proposes to expand its existing storage facility in Acadia and Evangeline Parishes, Louisiana. The project would involve constructing a new salt dome storage cavern and a 16.5-mile-long, 24-inch-diameter looping pipeline, along with other appurtenant facilities, to connect the Egan Gas Storage Facility with an existing Texas Gas Transmission Corporation pipeline. The proposed storage cavern would have a capacity of 10.5 Bcf (8.0 Bcf working gas), and increase Egan Hub's total storage capacity to 42 Bcf (32 Bcf working gas).[2]
The general location of Egan Hub's proposed facilities is shown in appendix 1.[3]
Land Requirements for Construction
Construction of the proposed Egan Fourth Cavern Project would affect a total of about 248.3 acres of land. Following construction, about 134.2 acres of land would be allowed to revert to its previous conditions. Disturbance associated with aboveground facilities would comprise about 4.7 acres of permanently affected land.
For the associated 24-inch-diameter pipeline, an 85-foot-wide construction right-of-way (ROW) is proposed in upland areas and a 75-foot-wide construction ROW is proposed in upland forested and wetland areas. Egan Hub would maintain a 50-foot-wide permanent ROW for operation and maintenance of the proposed facilities.
The EA Process
We are preparing the EA to comply with the National Environmental Policy Act (NEPA) which requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as “scoping”. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice, we are requesting public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA.
Our independent analysis of the issues will be in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to federal, state, and local agencies; public interest groups; interested individuals; affected landowners; newspapers and libraries in the project area; and the Commission's official service list for this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
Public Participation
You can make a difference by providing us with your specific comments or concerns about the project. By becoming a commenter, your concerns will be addressed in the EA and considered by the Commission. Your comments should focus on the potential environmental effects of the proposal, reasonable alternatives to the proposal (including alternative locations and routes), and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded:
- Send an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Room 1A, Washington, DC 20426.
- Label one copy of the comments for the attention of Gas Branch 1;
- Reference Docket No. CP07-88-000;
- Mail your comments so that they will be received in Washington, DC on or before May 9, 2007.
Please note that the Commission strongly encourages electronic filing of comments. See 18 Code of Federal Regulations (CFR) 385.2001(a)(1)(iii) and the instructions on the Commission's Internet Web site at http://www.ferc.gov under the “eFiling” link and the link to the User's Guide. Prepare your submission in the same manner as you would if filing on paper and save it to a file on your hard drive. Before you can file comments you will need to create an account by clicking on “Login to File” and then “New User Account.” You will be asked to select the type of filing you are making. This filing is considered a “Comment on Filing.”
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding known as an “intervenor”. Intervenors play a more formal role in the process. Among other things, intervenors have the right to receive copies of case-related Commission documents and filings by other intervenors. Likewise, each intervenor must send one electronic copy (using the Commission's e-Filing system) or 14 paper copies of its filings to the Secretary of the Commission and must send a copy of its filings to all other parties on the Commission's service list for this proceeding. If you want to become an intervenor, you must file a motion to intervene according to Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.214). Only intervenors have the right to seek rehearing of the Commission's decision.
Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your environmental comments considered.
Additional Information
Additional information about the project is available from the Commission's Office of External Affairs at 1-866-208 FERC (3372) or on the FERC Internet Web site (http://Start Printed Page 18978www.ferc.gov). Using the “eLibrary” link, select “General Search” from the eLibrary menu, enter the selected date range and “Docket Number” (i.e., CP07-88-000), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at 1-866-208-3676, TTY (202) 502-8659, or at FERCOnlineSupport@ ferc.gov. The eLibrary link on the FERC Internet Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings.
In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Start SignatureKimberly D. Bose,
Secretary.
Footnotes
1. “We”, “us”, and “our” refer to the environmental staff of the Office of Energy Projects (OEP).
Back to Citation2. Egan Hub's application in Docket No. CP07-88-000 was filed with the Commission under Section 7 of the Natural Gas Act.
Back to Citation3. The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices, other than appendix 1 (map), are available on the Commission's Web site at the “eLibrary” link or from the Commission's Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502-8371. For instructions on connecting to eLibrary, refer to the last page of this notice. Copies of the appendices were sent to all those receiving this notice in the mail.
Back to Citation[FR Doc. E7-7146 Filed 4-13-07; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 04/16/2007
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E7-7146
- Pages:
- 18976-18978 (3 pages)
- Docket Numbers:
- Docket No. CP07-88-000
- EOCitation:
- of 2007-04-09