E7-7147. Commission Information Collection Activities, Proposed Collection; Comment Request; Reinstatement  

  • Start Preamble April 9, 2007.

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice.

    SUMMARY:

    In compliance with the requirements of section 3506(c)(2)(a) of the Paperwork Reduction Act of 1995 (Pub. L. 104-13), the Federal Energy Regulatory Commission (Commission) is soliciting public comment on the specific aspects of the information collection described below.

    DATES:

    Comments on the collection of information are due June 16, 2007.

    ADDRESSES:

    Copies of sample filings of the proposed collection of information can be obtained from the Commission's Web site (http://www.ferc.gov/​docs-filings/​elibrary.asp) or from the Federal Energy Regulatory Commission, Attn: Michael Miller, Office of the Executive Director, ED-34, 888 First Street, NE., Washington, DC 20426. Comments may be filed either in paper format or electronically. Those parties filing electronically do not need to make a paper filing. For paper filing, the original and 14 copies of such comments should be submitted to the Secretary of the Commission, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426 and refer to Docket No. IC07-80-000. Documents filed electronically via the Internet must be prepared in WordPerfect, MS Word, Portable Document Format, or ASCII format. To file the document, access the Commission's Web site at http://www.ferc.gov and click on “Make an E-filing”, and then follow the instructions for each screen. First time users will have to establish a user name and password. The Commission will send an automatic acknowledgement to the sender's e-mail address upon receipt of comments.

    All comments may be viewed, printed or downloaded remotely via the Internet through FERC's homepage using the eLibrary link. For user assistance, contact FERCOlineSupport@ferc.gov or toll-free at (866) 208-3676. or for TTY, contact (202) 502-8659.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Miller may be reached by telephone at (202) 502-8415, by fax at (202) 273-0873, and by e-mail at michael.miller@ferc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The information collected under the requirements of FERC Form 80 “Licensed Hydropower Development Recreation Report” (OMB Control No. 1902-0106) is used by the Commission to implement the statutory provisions of sections 4(a), 10(a), 301(a), 304 and 309 of the Federal Power Act (FPA), 16 U.S.C. sections 797, 803, 825c and 8254. The authority for the Commission to collect this information comes from section 10(a) of the FPA which requires the Commission to be responsible for ensuring that hydro projects subject to its jurisdiction are consistent with the comprehensive development of the nation's waterway for recreation and other beneficial public uses. In the interest of fulfilling these objectives, the Commission expects licensees subject to its jurisdiction, to recognize the resources that are affected by their activities and to play a role in protecting such resources.

    FERC Form 80 is a report on the use and development of recreational facilities at hydropower projects licensed by the Commission. Applications for amendments to licenses and/or changes in land rights frequently involve changes in resources available for recreation. Commission staff utilizes FERC Form 80 data when analyzing the adequacy of existing public recreational facilities and in the amendment review process to help determine the impact of such changes. In addition, the Commission's regional office staff uses the FERC Form 80 data when conducting inspections of licensed projects. The Commission's inspectors use the data in evaluating compliance with various license conditions and in identifying recreational facilities at hydropower projects.

    The data required to be filed is specified by 18 Code of Federal Regulations (CFR) under 18 CFR 8.11 and 141.14.

    The FERC Form 80 has been revised to facilitate greater ease to respondents in providing the information. First, FERC Form 80 has been updated to eliminate data concerning the nearest city and population, since Commission staff can access the information from Start Printed Page 18968other sources. Second, Commission staff has clarified the definitions so respondents have a better understanding of the information to be provided. Third, resource data has been updated to include FERC approved recreational sites. Finally a new field has been added so that respondents can identify the method used for collecting the data.

    Action: The Commission is requesting reinstatement and a three-year approval of the information collection with the changes noted above.

    Burden Statement: Public reporting burden for this collection is estimated as:

    Number of respondents annuallyNumber of responses per respondentAverage burden hours per responseTotal annual burden hours
    (1)(2)(3)(1)x(2)x(3)
    400131,200

    Estimated cost burden to respondents is $70,464. (1,200 hours/2,080 hours per year times $122,137 per year average per employee = $70,464). The cost per respondent is $176 (rounded off).

    The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information.

    The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities, which benefit the whole organization rather than any one particular function or activity.

    Comments are invited on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    [FR Doc. E7-7147 Filed 4-13-07; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/16/2007
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice.
Document Number:
E7-7147
Dates:
Comments on the collection of information are due June 16, 2007.
Pages:
18967-18968 (2 pages)
Docket Numbers:
Docket No. IC07-80-000, FERC Form 80
EOCitation:
of 2007-04-09
PDF File:
e7-7147.pdf