95-9322. CNG Transmission Corp.; Application  

  • [Federal Register Volume 60, Number 73 (Monday, April 17, 1995)]
    [Notices]
    [Page 19249]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-9322]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-303-000]
    
    
    CNG Transmission Corp.; Application
    
    April 11, 1995.
        Take notice that on April 5, 1995, CNG Transmission Corporation 
    (CNG), 445 West Main Street, Clarksburg, West Virginia 26301, filed in 
    Docket No. CP95-303-000 an application pursuant to Section 7(b) of the 
    Natural Gas Act, for permission and approval to abandon, in place, 
    approximately 20.40 miles of 12-inch pipeline, known as H-197, located 
    in Wetzel and Marshall Counties, West Virginia, all as more fully set 
    forth in the application on file with the Commission and open to public 
    inspection.
        CNG states that line H-197 was constructed in 1946 to serve various 
    industrial plants along the Ohio River basin. It is stated that many of 
    those plants have closed over the years eliminating the market need for 
    that section of H-197. CNG further states that during the ensuing 
    decades, corrosion has created a substantial number of leaks in that 
    pipeline segment.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before May 2, 1995, file 
    with the Federal Energy Regulatory Commission, Washington, DC 20426, a 
    motion to intervene or a protest in accordance with the requirements of 
    the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). 
    All protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that permission and approval for the proposed abandonment are 
    required by the public convenience and necessity. If a motion for leave 
    to intervene is timely filed, or if the Commission on its own motion 
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for CNG to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-9322 Filed 4-14-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
04/17/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-9322
Pages:
19249-19249 (1 pages)
Docket Numbers:
Docket No. CP95-303-000
PDF File:
95-9322.pdf