[Federal Register Volume 60, Number 73 (Monday, April 17, 1995)]
[Notices]
[Page 19249]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-9322]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-303-000]
CNG Transmission Corp.; Application
April 11, 1995.
Take notice that on April 5, 1995, CNG Transmission Corporation
(CNG), 445 West Main Street, Clarksburg, West Virginia 26301, filed in
Docket No. CP95-303-000 an application pursuant to Section 7(b) of the
Natural Gas Act, for permission and approval to abandon, in place,
approximately 20.40 miles of 12-inch pipeline, known as H-197, located
in Wetzel and Marshall Counties, West Virginia, all as more fully set
forth in the application on file with the Commission and open to public
inspection.
CNG states that line H-197 was constructed in 1946 to serve various
industrial plants along the Ohio River basin. It is stated that many of
those plants have closed over the years eliminating the market need for
that section of H-197. CNG further states that during the ensuing
decades, corrosion has created a substantial number of leaks in that
pipeline segment.
Any person desiring to be heard or to make any protest with
reference to said application should on or before May 2, 1995, file
with the Federal Energy Regulatory Commission, Washington, DC 20426, a
motion to intervene or a protest in accordance with the requirements of
the Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).
All protests filed with the Commission will be considered by it in
determining the appropriate action to be taken but will not serve to
make the protestants parties to the proceeding. Any person wishing to
become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for CNG to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 95-9322 Filed 4-14-95; 8:45 am]
BILLING CODE 6717-01-M