95-9350. Airworthiness Directives; McDonnell Douglas Model DC-10 Series Airplanes and KC-10A (Military) Airplanes  

  • [Federal Register Volume 60, Number 73 (Monday, April 17, 1995)]
    [Proposed Rules]
    [Pages 19185-19188]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-9350]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF TRANSPORTATION
    14 CFR Part 39
    
    [Docket No. 94-NM-244-AD]
    
    
    Airworthiness Directives; McDonnell Douglas Model DC-10 Series 
    Airplanes and KC-10A (Military) Airplanes
    
    AGENCY: Federal Aviation Administration, DOT.
    
    ACTION: Notice of proposed rulemaking (NPRM).
    
    -----------------------------------------------------------------------
    
    SUMMARY: This document proposes the supersedure of an existing 
    airworthiness directive (AD), applicable to McDonnell Douglas Model DC-
    10 series airplanes and KC-10A (military) airplanes, that currently 
    requires the implementation of a program of structural inspections to 
    detect and correct fatigue cracking in order to ensure the continued 
    airworthiness of these airplanes as they approach the manufacturer's 
    original fatigue design life goal. This action [[Page 19186]] would 
    require, among other things, clarification of some Principle Structural 
    Elements (PSE) and some non-destructive inspection (NDI) procedures. 
    This proposal is prompted by new data submitted by the manufacturer 
    indicating that certain revisions to the program are necessary in order 
    to clarify some PSE's and some NDI procedures. The actions specified by 
    the proposed AD are intended to prevent fatigue cracking that could 
    compromise the structural integrity of these airplanes.
    
    DATES: Comments must be received by June 6, 1995.
    
    ADDRESSES: Submit comments in triplicate to the Federal Aviation 
    Administration (FAA), Transport Airplane Directorate, ANM-103, 
    Attention: Rules Docket No. 94-NM-244-AD, 1601 Lind Avenue, SW., 
    Renton, Washington 98055-4056. Comments may be inspected at this 
    location between 9 a.m. and 3 p.m., Monday through Friday, except 
    Federal holidays.
        The service information referenced in the proposed rule may be 
    obtained from McDonnell Douglas Corporation, P.O. Box 1771, Long Beach, 
    California 90801-1771, Attention: Business Unit Manager, Technical 
    Administrative Support, Department L51, M.C. 2-98. This information may 
    be examined at the FAA, Transport Airplane Directorate, 1601 Lind 
    Avenue, SW., Renton, Washington; or at the FAA, Transport Airplane 
    Directorate, Los Angeles Aircraft Certification Office, 3960 Paramount 
    Boulevard, Lakewood, California.
    
    FOR FURTHER INFORMATION CONTACT: Maureen Moreland, Aerospace Engineer, 
    Airframe Branch, ANM-121L, FAA, Transport Airplane Directorate, Los 
    Angeles Aircraft Certification Office, 3960 Paramount Boulevard, 
    Lakewood, California 90712; telephone (310) 627-5238; fax (310) 627-
    5210.
    
    SUPPLEMENTARY INFORMATION:
    
    Comments Invited
    
        Interested persons are invited to participate in the making of the 
    proposed rule by submitting such written data, views, or arguments as 
    they may desire. Communications shall identify the Rules Docket number 
    and be submitted in triplicate to the address specified above. All 
    communications received on or before the closing date for comments, 
    specified above, will be considered before taking action on the 
    proposed rule. The proposals contained in this notice may be changed in 
    light of the comments received.
        Comments are specifically invited on the overall regulatory, 
    economic, environmental, and energy aspects of the proposed rule. All 
    comments submitted will be available, both before and after the closing 
    date for comments, in the Rules Docket for examination by interested 
    persons. A report summarizing each FAA-public contact concerned with 
    the substance of this proposal will be filed in the Rules Docket.
        Commenters wishing the FAA to acknowledge receipt of their comments 
    submitted in response to this notice must submit a self-addressed, 
    stamped postcard on which the following statement is made: ``Comments 
    to Docket Number 94-NM-244-AD.'' The postcard will be date stamped and 
    returned to the commenter.
    
    Availability of NPRMs
    
        Any person may obtain a copy of this NPRM by submitting a request 
    to the FAA, Transport Airplane Directorate, ANM-103, Attention: Rules 
    Docket No. 94-NM-244-AD, 1601 Lind Avenue, SW., Renton, Washington 
    98055-4056.
    
    Discussion
    
        On August 25, 1993, the FAA issued AD 93-17-09, amendment 39-8680 
    (58 FR 54949, October 25, 1993), applicable to McDonnell Douglas Model 
    DC-10 series airplanes and KC-10A (military) airplanes, to require 
    implementation of a program of structural inspections to detect and 
    correct fatigue cracking in order to ensure the continued airworthiness 
    of these airplanes as they approach the manufacturer's original fatigue 
    design life goal. That action was prompted by new data submitted by the 
    manufacturer indicating that certain revisions to the program are 
    necessary in order to clarify some Principal Structural Elements (PSE) 
    and some non-destructive inspection (NDI) procedures. The requirements 
    of that AD are intended to prevent fatigue cracking that could 
    compromise the structural integrity of these airplanes.
        Since the issuance of that AD, the manufacturer has issued 
    McDonnell Douglas Report No. L26-012, ``DC-10 Supplemental Inspection 
    Document (SID),'' Volume I, Revision 5, dated October 1994; Volume II, 
    Revision 5, dated October 1994; and Volume III-94, dated November 1994. 
    This revision of the SID revises the sampling program by:
        1. Clarifying some PSE titles;
        2. Moving portions of some PSE's under a different PSE designator;
        3. Clarifying some non-destructive inspection (NDI) procedures;
        4. Including some revised alternative NDI procedures for previously 
    existing PSE's; and
        5. Updating the planning data continued in Volume III-94.
        The FAA has reviewed and approved the revised SID and has 
    determined that these revised procedures must be incorporated into the 
    affected operators' SID programs in order to provide an acceptable 
    level of confidence that cracks in PSE's do not exist in the fleet.
        Since an unsafe condition has been identified that is likely to 
    exist or develop on other products of this same type design, the 
    proposed AD would supersede AD 93-17-09 to require clarifying some PSE 
    titles and some NDI procedures, and updating the planning data. The 
    actions would be required to be accomplished in accordance with the 
    service document described previously.
        There are approximately 419 Model DC-10 series airplanes and KC-10A 
    (military) airplanes of the affected design in the worldwide fleet. The 
    FAA estimates that 249 airplanes of U.S. registry and 13 U.S. operators 
    would be affected by this proposed AD. Incorporation of the SID program 
    into an operator's maintenance program, as required by AD 93-17-09 is 
    estimated to necessitate 1,270 work hours (per operator), at an average 
    labor rate of $60 per work hour. Based on these figures, the cost to 
    the 13 affected U.S. operators to incorporate the SID program is 
    estimated to be $990,600.
        The incorporation of the revised procedures proposed in this AD 
    action would require approximately 20 additional work hours per 
    operator to accomplish, at an average labor rate of $60 per work hour. 
    Based on these figures, the cost to the 13 affected U.S. operators to 
    incorporate these revised procedures into the SID program into an 
    operator's maintenance program is estimated to be $15,600.
        The recurring inspection costs, as required by AD 93-17-09, are 
    estimated to be 365 work hours per airplane per year, at an average 
    labor rate of $60 per work hour. Based on these figures, the recurring 
    inspection costs required by AD 93-17-09 are estimated to be $21,900 
    per airplane, or $5,453,100 for the affected U.S. fleet.
        Since no new recurring inspection procedures have been added to the 
    program by this proposed AD action, there would be no additional 
    economic burden on affected operators to perform additional recurrent 
    inspections.
        Based on the above figures, the total cost impact of the proposed 
    AD on U.S. operators is estimated to be $5,468,700 for the first year, 
    and $5,453,100 for each year thereafter. These ``total cost 
    [[Page 19187]] impact'' figures assume that no operator has yet 
    accomplished any of the requirements of this AD. However, it can be 
    reasonably assumed that a majority of the affected operators have 
    already initiated the SID program (as required by AD 93-17-09).
        Additionally, the number of required work hours for each proposed 
    inspection (and the SID program), as indicated above, is presented as 
    if the accomplishment of those actions were to be conducted as ``stand 
    alone'' actions. However, in actual practice, these actions for the 
    most part will be accomplished coincidentally or in combination with 
    normally scheduled airplane inspections and other maintenance program 
    tasks. Therefore, the actual number of necessary additional work hours 
    will be minimal in many instances. Further, any cost associated with 
    special airplane scheduling can be expected to be minimal.
        The regulations proposed herein would not have substantial direct 
    effects on the States, on the relationship between the national 
    government and the States, or on the distribution of power and 
    responsibilities among the various levels of government. Therefore, in 
    accordance with Executive Order 12612, it is determined that this 
    proposal would not have sufficient federalism implications to warrant 
    the preparation of a Federalism Assessment.
        For the reasons discussed above, I certify that this proposed 
    regulation (1) is not a ``significant regulatory action'' under 
    Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
    Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
    and (3) if promulgated, will not have a significant economic impact, 
    positive or negative, on a substantial number of small entities under 
    the criteria of the Regulatory Flexibility Act. A copy of the draft 
    regulatory evaluation prepared for this action is contained in the 
    Rules Docket. A copy of it may be obtained by contacting the Rules 
    Docket at the location provided under the caption ADDRESSES.
    
    List of Subjects in 14 CFR Part 39
    
        Air transportation, Aircraft, Aviation safety, Safety.
    
    The Proposed Amendment
    
        Accordingly, pursuant to the authority delegated to me by the 
    Administrator, the Federal Aviation Administration proposes to amend 
    part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
    follows:
    
    PART 39--AIRWORTHINESS DIRECTIVES
    
        1. The authority citation for part 39 continues to read as follows:
    
        Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C. 
    106(g); and 14 CFR 11.89.
    
    
    Sec. 39.13  [Amended]
    
        2. Section 39.13 is amended by removing amendment 39-8680 (58 FR 
    54949, October 25, 1993), and by adding a new airworthiness directive 
    (AD), to read as follows:
    
    McDonnell Douglas: Docket 94-NM-244-AD. Supersedes AD 93-17-09, 
    Amendment 39-8680.
    
        Applicability: Model DC-10 series airplanes and KC-10A 
    (military) airplanes, certificated in any category.
        Compliance: Required as indicated, unless accomplished 
    previously.
        To ensure the continuing structural integrity of these 
    airplanes, accomplish the following:
        (a) Within 6 months after November 24, 1993 (the effective date 
    of AD 93-17-09, amendment 39-8680), incorporate a revision into the 
    FAA-approved maintenance inspection program which provides for 
    inspection(s) of the Principal Structural Elements (PSE's) defined 
    in Section 2 of Volume I of McDonnell Douglas Report No. L26-012, 
    ``DC-10 Supplemental Inspection Document (SID),'' Revision 3, dated 
    December 1992, in accordance with Section 2 of Volume III-92, dated 
    October 1992, of the SID. The non-destructive inspection (NDI) 
    techniques set forth in Section 2 and Section 4 of Volume II, 
    Revision 3, dated December 1992, of the SID provide acceptable 
    methods for accomplishing the inspections required by this 
    paragraph. All inspection results (negative or positive) must be 
    reported to McDonnell Douglas, in accordance with the instructions 
    contained in Section 2 of Volume III-92, dated October 1992, of the 
    SID. Information collection requirements contained in this 
    regulation have been approved by the Office of Management and Budget 
    (OMB) under the provisions of the Paperwork Reduction Act of 1980 
    (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 
    2120-0056.
        (1) For those Fleet Leader Operator Sampling (FLOS) PSE's which 
    do not have a Normal Maintenance Visual Inspection specified in 
    Section 4 of Volume II, Revision 3, dated December 1992, of the SID, 
    the procedure for general visual inspection is as follows: Perform 
    an inspection of the general PSE area for cleanliness, presence of 
    foreign objects, security of parts, cracks, corrosion, and damage.
        (2) For PSE's 53.10.031E/.032E, 53.10.047E/.048E, and 
    57.10.029E/.030E: The ENDDATE for these PSE's is October 1993. (For 
    these PSE's disregard the June 1993 ENDDATE specified in Section 2 
    of Volume III-92, dated October 1992, of the SID.)
        (b) Within 6 months after the effective date of this AD, replace 
    the revision of the FAA-approved maintenance inspection program 
    required by paragraph (a) of this AD with a revision that provides 
    for inspection(s) of the PSE's defined in Section 2 of Volume I of 
    McDonnell Douglas Report No. L26-012, ``DC-10 Supplemental 
    Inspection Document (SID),'' Revision 5, dated October 1994, in 
    accordance with Section 2 of Volume III-94, dated November 1994, of 
    the SID.
        (1) Prior to reaching the threshold (Nth) specified for any 
    PSE listed in Volume III-94, dated November 1994, of the SID inspect 
    each PSE sample in accordance with the NDI procedures set forth in 
    Section 2 and Section 4 of Volume II, Revision 5, dated October 
    1994. Thereafter repeat the inspection for that PSE at intervals not 
    to exceed DNDI/2 of the NDI procedure that is specified in Volume 
    III-94, dated November 1994, of the SID.
        (2) The NDI techniques set forth in Section 2 and Section 4 of 
    Volume II, Revision 5, dated October 1994, of the SID provide 
    acceptable methods for accomplishing the inspections required by 
    this paragraph.
        (3) Visual inspections of all PSE's on airplanes listed in 
    Volume III-94, dated November 1994, of the SID planning data, are 
    required by the fleet leader-operator sampling (FLOS) program at 
    least once during the interval between the start date (SDATE) and 
    the end date (EDATE) established for each PSE. These visual 
    inspections are defined in Section 4 of Volume II, Revision 5, dated 
    October 1994, of the SID, and are required only for those airplanes 
    that have not been inspections previously in accordance with Section 
    2 of Volume II, Revision 5, dated October 1994, of the SID.
        (4) For those Fleet Leader Operator Sampling (FLOS) PSE's which 
    do not have a Normal Maintenance Visual Inspection specified in 
    Section 4 of Volume II, Revision 3, dated December 1992, of the SID, 
    the procedure for general visual inspection is as follows: Perform 
    an inspection of the general PSE area for cleanliness, presence of 
    foreign objects, security of parts, cracks, corrosion, and damage.
        (5) For PSE's 53.10.055/.056E, 55.10.013/.014B, 53.10.005/.006E, 
    53.10.031/.032E, 53.10.047/.048E, 57.10.029/.030E: The EDATE for 
    these PSE's is June 1998. (For these PSE's, disregard the June 1996 
    EDATE specified in Section 2, of Volume III-94, dated November 1994, 
    of the SID.)
        (6) All inspection results (negative or positive) must be 
    reported to McDonnell Douglas in accordance with the instructions 
    contained in Section 2 of Volume III-94, dated November 1994, of the 
    SID. Information collection requirements contained in this 
    regulation have been approved by the Office of Management and Budget 
    (OMB) under the provisions of the Paperwork Reduction Act of 1980 
    (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 
    2120-0056.
        (c) Any cracked structure detected during the inspections 
    required by paragraph (a) or (b) of this AD must be repaired before 
    further flight, in accordance with a method approved by the Manager, 
    Los Angeles Aircraft Certification Office (ACO), FAA, Transport 
    Airplane Directorate.
    
        Note 1: Requests for approval of any PSE repair that would 
    affect the FAA-approved [[Page 19188]] maintenance inspection 
    program that is required by this AD should include a damage 
    tolerance assessment for that PSE repair.
    
        (d) An alternative method of compliance or adjustment of the 
    compliance time that provides an acceptable level of safety may be 
    used if approved by the Manager, Los Angeles ACO. Operators shall 
    submit their requests through an appropriate FAA Principal 
    Maintenance Inspector, who may add comments and then send it to the 
    Manager, Los Angeles ACO.
    
        Note 2: Information concerning the existence of approved 
    alternative methods of compliance with this AD, if any, may be 
    obtained from the Los Angles ACO.
        Note 3: Alternative methods of compliance previously granted for 
    amendment 39-8680, AD 93-17-09, continue to be considered as 
    acceptable alternative methods of compliance with this amendment.
    
        (e) Special flight permits may be issued in accordance with 
    Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 
    21.197 and 21.199) to operate the airplane to a location where the 
    requirements of this AD can be accomplished.
    
        Issued in Renton, Washington, on April 10, 1995.
    S.R. Miller,
    Acting Manager, Transport Airplane Directorate, Aircraft Certification 
    Service.
    [FR Doc. 95-9350 Filed 4-14-95; 8:45 am]
    BILLING CODE 4910-13-U
    
    

Document Information

Published:
04/17/1995
Department:
Transportation Department
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
95-9350
Dates:
Comments must be received by June 6, 1995.
Pages:
19185-19188 (4 pages)
Docket Numbers:
Docket No. 94-NM-244-AD
PDF File:
95-9350.pdf
CFR: (1)
14 CFR 39.13