[Federal Register Volume 60, Number 73 (Monday, April 17, 1995)]
[Notices]
[Pages 19246-19248]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-9367]
[[Page 19246]]
DEPARTMENT OF ENERGY
[Docket No. EG95-38-000, et al.]
TSP Guatemala One, Inc., et al.; Electric Rate and Corporate
Regulation Filings
April 10, 1995.
Take notice that the following filings have been made with the
Commission:
1. TPS Guatemala One, Inc.
[Docket No. EG95-38-000]
Take notice that on March 30, 1995, TPS Guatemala One, Inc. (TPS
Guatemala) filed an application with the Commission for a determination
that it is an exempt wholesale generator (EWG). In support of its
application, TPS Guatemala asserts that it will own indirectly a
majority interest in a 78 megawatt generating facility to be
constructed at a site near Escuintla, Guatemala, located approximately
35 miles southwest of Guatemala City, Guatemala. In its application,
TPS Guatemala states that its communications and correspondence
regarding this Application should be served on its representative:
Sheila M. McDevitt, Esq., Vice President, Assistant General Counsel,
TECO Energy, Inc., 702 North Franklin Street, Tampa, Florida 33602,
(813) 228-1804.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Tampa Centro Americana de Electricidad, Limitada
[Docket No. EG95-39-000]
Take notice that on March 30, 1995, Tampa Centro Americana de
Electricidad, Limitada (TCAE) submitted an application to the
Commission for a determination that it is an exempt wholesale generator
(EWG). In support of its application, TCAE asserts that it will own and
operate a 78 megawatt generating facility at a site near Escuintla,
Guatemala, located approximately 35 miles southwest of Guatemala City,
Guatemala. TCAE further states that all communications and
correspondence regarding this Application should be served on its
representative, Sheila M. McDevitt, Esq. Vice President, Assistant
General Counsel, TECO Energy, Inc., 702 North Franklin Street, Tampa,
Florida 33602, (813) 228-1804.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
3. New Hampshire Electric Cooperative v. Public Service Company of New
Hampshire
[Docket No. EL95-37-000]
Take notice that on March 27, 1995, New Hampshire Electric
Cooperative (NHEC) tendered for filing a complaint against Public
Service Company of New Hampshire's (PSNH's) Fuel and Purchased Power
Adjustment Clause submitted by PSNH to the Commission on December 27,
1994. PSNH filed this FPPAC, as it is annually required to do under the
Amended Partial Requirements Agreement between NHEC and PSNH in Docket
No. ER95-353-000.
Comment date: May 10, 1995, in accordance with Standard Paragraph E
at the end of this notice.
4. Sithe/Independence Power Partners, L.P. v. Niagara Mohawk Power
Corp.
[Docket No. EL95-38-000]
Take notice that on March 29, 1995, Sithe/Independence Power
Partners L.P. (Sithe) tendered for filing a complaint against Niagara
Mohawk Power Corporation (Niagara) regarding Niagara's calculation of
transmission loss factors for Sithe. In its complaint Sithe requests
that the Commission: (a) Order Niagara to recalculate the transmission
losses associated with the November 5, 1991, Transmission Services
Agreement between Sithe and Niagara; (b) order Niagara to share with
Sithe and file with the Commission details about Niagara's methodology
for determining transmission losses on its system; and (c) investigate
the methodology Niagara uses to determine transmission losses on its
system and modify such methodology as necessary to ensure that it is
just, reasonable, not unduly discriminatory and in the public interest.
Comment date: May 10, 1995, in accordance with Standard Paragraph E
at the end of this notice.
5. Pacific Gas and Electric Co.
[Docket No. ER95-778-000]
Take notice that on March 21, 1995, Pacific Gas and Electric
Company (PG&E), tendered for filing revisions to the following
agreements between PG&E and the City of Santa Clara, California (City
or Santa Clara): (1) The Interconnection Agreement between Pacific Gas
and Electric Company and the City of Santa Clara (LA), initially filed
in FERC docket No. ER84-6-000 and designated as PG&E Rate Schedule FERC
No. 85; (2) the Grizzly Development and Mokelume Settlement Agreement
(Grizzly Agreement), initially filed in FERC Project No. 137-002 and
designated as PG&E Rate Schedule FERC No. 137; (3) the System Bulk
Power Sale and Purchase Agreement (Bulk Power Agreement), initially
filed in FERC Docket No. ER87-498-000 and designated as PG&E Rate
Schedule FERC No. 108.
PG&E's filing as to the IA proposes revisions to: (1) Section II.6
of Appendix A, relating to transmission rates and transmission
functions; (2) Section II.8 of Appendix A, regarding Capacity Reserve;
and (3) Exhibit A-4 to Appendix A, regarding Firm Transmission Service
between Points of Receipt and Points of Delivery.
PG&E's filing as to Grizzly Amendment No. Two proposes revisions to
the power purchases for resources.
PG&E's filing as to the Bulk Power Agreement proposes revisions to
the term of the agreement and terms, conditions and rates for power
sales.
Copies of this filing were served upon Santa Clara and the
California Public Utilities Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
6. Resources West Energy Corp.
[Docket No. ER95-808-000]
Take notice that on March 28, 1995, Resources West Energy
Corporation (Resources West), tendered for filing three transmission
tariffs; a network integration service tariff; a firm point-to-point
transmission service tariff; and a nonfirm point-to-point transmission
service tariff. Resources West proposes that these three tariffs become
effective upon the merger of Sierra Pacific Resources (parent company
of Sierra Pacific Power Company) and The Washington Water Power
Company.
Copies of this filing have been served on the Public Service
Commission of Nevada, the Washington Utilities and Transportation
Commission, the California Public Utilities Commission, Montana Public
Service Commission, Public Utility Commission of Oregon and the Idaho
Public Utilities Commission, as well as current wholesale requirements
customers of Sierra Pacific Power Company and The Washington Water
Power Company and Parties of Record in Docket No. EC94-23-000.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
7. Northeast Utilities Service Co.
[Docket No. ER95-815-000]
Take notice that on March 28, 1995, Northeast Utilities Service
Company [[Page 19247]] (NUSCO), tendered for filing a Service Agreement
and a Certificate of Concurrence with Vermont Electric Generation and
Transmission Cooperative (VEG&T) under the NU System Companies System
Power Sales/Exchange Tariff No. 6.
NUSCO states that a copy of this filing has been mailed to VEG&T.
NUSCO requests that the Service Agreement become effective on March
17, 1995.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
8. Union Electric Co.
[Docket No. ER95-816-000]
Take notice that on March 28, 1995, Union Electric Company (UE),
tendered for filing a Transmission Service Agreement dated March 29,
1995 between Rainbow Energy Marketing Corporation (REMC) and UE. UE
asserts that the purpose of the Agreement is to set out specific rates,
terms, and conditions for transmission service transactions from UE to
REMC.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
9. PECO Energy Co.
[Docket No. ER95-820-000]
Take notice that on March 30, 1995, PECO Energy Company (PECO),
tendered for filing an Agreement between PECO and Atlantic City
Electric Company (ACE) dated March 17, 1995.
PECO states that the Agreement sets forth the terms and conditions
for the sale of system energy which it expects to have available for
sale from time to time and the purchase of which will be economically
advantageous to ACE. In order to optimize the economic advantage to
both PECO and ACE, PECO requests that the Commission waive its
customary notice period and permit the agreement to become effective on
March 31, 1995.
PECO states that a copy of this filing has been sent to ACE and
will be furnished to the Pennsylvania Public Utility Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
10. Idaho Power Co.
[Docket No. ER95-821-000]
Take notice that on March 30, 1995, Idaho Power Company (IPC),
tendered for filing a rate schedule amendment for the Power Sale
Agreement between IPC and the cities of Azusa, Banning and Colton,
California.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
11. Northeast Utilities Service Co.
[Docket No. ER95-822-000]
Take notice that on March 30, 1995, Northeast Utilities Service
Company (NUSCO), tendered for filing on behalf of The Connecticut Light
and Power Company, Western Massachusetts Electric Company, Holyoke
Water Power Company, and Public Service Company of New Hampshire
(together, the NU System Companies), a filing for a System Power Sales
Agreement with Commonwealth Electric Company (CES). NUSCO requests that
the rate schedule become effective on June 1, 1995.
NUSCO states that copies of the filing have been mailed or
delivered to the NU System Companies, CES and the Massachusetts
Department of Public Utilities.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
12. Central Maine Power Co.
[Docket No. ER95-823-000]
Take notice that on March 30, 1995, Central Maine Power Company
(CMP), tendered for filing executed service agreements entered into
with the following entities: Catex Vitol Electric Inc., Citizens Lehman
Power Sales, Commonwealth Electric Company, Consolidated Edison Co. of
New York, Inc., Louis Dreyfus Electric Power Inc., ENRON Power
Marketing, Inc., Long Island Lighting Co., New England Power Company,
New York Power Authority, Town of Hudson, Massachusetts and Vermont
Marble Power Division of Omya, Inc. Service will be provided pursuant
to CMP's previously accepted Power Sales Tariff, designated rate
schedule CMP--FERC Electric Tariff, Original Volume No. 2, as
supplemented. An effective date for commencement of service of April 1,
1995 is requested for each of the service agreements.
CMP has served a copy of the filing on the affected customers and
on the Maine Public Utilities Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
13. Puget Sound Power & Light Co.
[Docket No. ER95-824-000]
Take notice that on March 30, 1995, Puget Sound Power & Light
Company tendered for filing an Agreement Providing for Termination of
Agreement for Assignment and for Exchange of Power between Puget and
Public Utilities District No. 1 of Grays Harbor County, Washington (the
District) executed as of March 2, 1995 (the Exchange Agreement). A copy
of the filing was served upon the District.
Puget states that the Exchange Agreement relates to the exchange
and scheduling by Puget and the District of the District's Centralia
Project output share, the sale by Puget to the District of reserve
capacity, and the provision by Puget of certain associated services,
all pursuant to the terms of the Exchange Agreement.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
14. Western Resources, Inc.
[Docket No. ER95-825-000]
Take notice that on March 30, 1995, Western Resources, Inc. (WRI),
tendered for filing a change in its Service Agreement No. 4 under FERC
Electric Tariff, Original Volume No. 1. WRI states that the change is
to amend Exhibit A to the Transmission Service Agreement between WRI
and the City of Neodesha. This change is requested to become effective
June 1, 1995.
Copies of this filing were served upon the City of Neodesha and the
Kansas Corporation Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
15. Kansas Gas and Electric Co.
[Docket No. ER95-826-000]
Take notice that on March 30, 1995, Western Resources, Inc. (WRI),
on behalf of Kansas Gas and Electric Company (KG&E), tendered for
filing a proposed change to KG&E's Rate Schedule FPC No. 93. WRI states
that the proposed change is to add one year to the term of Service
Schedule SP-1 between KG&E and WRI, and to increase the capacity
nomination thereunder.
A copy of the filing has been served upon the Kansas Corporation
Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
16. Kansas Gas and Electric Co.
[Docket No. ER95-827-000]
Take notice that on March 30, 1995, Kansas Gas and Electric Company
(KG&E), tendered for filing a change in its Federal Power Commission
Electric Service Tariff No. 93. KG&E states that the change is to
reflect the amount of transmission capacity requirements required by
Western Resources, Inc. under Service Schedule W to FPC Rate
[[Page 19248]] Schedule No. 93 for the period June 1, 1995 through May
31, 1996.
Copies of this filing were served upon the Kansas Corporation
Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
17. Boston Edison Co.
[Docket No. ER95-828-000]
Take notice that on March 30, 1995, Boston Edison Company (Edison)
and New England Power Company (NEP), tendered for filing a Fourth
Extension Agreement to Rate Schedule No. 46. The purpose of the
agreement is to extend the notice of termination of service under Rate
Schedule No. 46 to September 30, 1995 from May 31, 1995 the return on
equity provision of the Facilities Support Agreement.
The filing companies state that they have served the filing on the
Massachusetts Department of Public Utilities.
The parties request that the amendment become effective on June 1,
1995.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
18. Southern California Edison Co.
[Docket No. ER95-830-000]
Take notice that on March 31, 1995, Southern California Edison
Company, tendered for filing the following power sale agreement between
the City of Colton (Colton) and Edison, and the associated supplement
agreement to integrate the power sale agreement in accordance with the
terms of the 1990 Integrated Operations Agreement (1990 IOA), Rate
Schedule FERC No. 249:
1995 Power Sale Agreement Between The City of Colton and The Southern
California Edison Company (1995 PSA)
Supplemental Agreement for the Integration of the 1995 Power Sale
Agreement Between Southern California Edison and The City of Colton
(Supplemental Agreement)
The 1995 PSA provides the terms and conditions whereby Edison shall
make available and Colton shall purchase Contract Capacity and
Associated Energy during the Delivery Season of June 1 through
September 30 (4 months/year) during the years 1995, 1996, and 1997. The
Supplemental Agreement sets forth the terms and conditions under which
Edison will integrate the 1995 PSA pursuant to the 1990 IOA.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
19. New England Power Co.
[Docket No. ER95-837-000]
Take notice that on March 31, 1995, New England Power Company
tendered for filing a transmission contract for service to Citizens
Lehman Power Sales.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
20. Carolina Power & Light Co.
[Docket No. ER95-839-000]
Take notice that on March 31, 1995, Carolina Power & Light Company
(Carolina) tendered for filing a Notice of Termination of Rate Schedule
FERC No. 49 between Carolina and the Town of Bennettsville. Carolina
has requested a termination date of June 1, 1995.
Notice of the termination has been served upon the Town of
Bennettsville.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
21. CNG Power Services Co.
[Docket No. ER95-840-000]
Take notice that on March 31, 1995, CNG Power Services Corporation
(CNGPS) tendered for filing a Service Agreement between CNGPS and R.J.
Dahnke & Associates (Dahnke), dated March 1, 1995, and a request for
waiver of the Commission's notice requirements. This Service Agreement
indicates that CNGPS has been authorized by the Commission to market
wholesale electric power. CNGPS obtained authority for such
transactions pursuant to its FERC Electric Rate Schedule No. 1 (Rate
Schedule), which was accepted by the Commission by letter order dated
October 25, 1994 at Docket No. ER94-1554-000. The Service Agreement
allows CNGPS and Dahnke to enter into individual transactions for the
sale by CNGPS to Dahnke of energy and/or capacity at mutually agreed
rates.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
22. Northern Indiana Public Service Co.
[Docket No. ER95-843-000]
Take notice that on March 31, 1995, Northern Indiana Public Service
Company tendered for filing on behalf of Wabash Valley Power
Association, Inc. and itself the Eleventh Supplemental Agreement to the
Interconnection Agreement, Dated April 16, 1984, by and Between
Northern Indiana Public Service Company and Wabash Valley Power
Association, Inc. Dated March 14, 1995 (Supplemental).
The Supplemental adds the phrase ``Up to'' the demand compensation
section of Service Schedule M--Unit Peaking Capacity and Energy NIPSCO
to Wabash Valley of the Interconnection Agreement between the Parties.
Copies of this filing have been sent to Wasbash Valley Power
Association, Inc. and the Indiana Utility Regulatory Commission.
Comment date: April 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-9367 Filed 4-14-95; 8:45 am]