95-9367. TSP Guatemala One, Inc., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 73 (Monday, April 17, 1995)]
    [Notices]
    [Pages 19246-19248]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-9367]
    
    
    
    [[Page 19246]]
    
    DEPARTMENT OF ENERGY
    
    [Docket No. EG95-38-000, et al.]
    
    
    TSP Guatemala One, Inc., et al.; Electric Rate and Corporate 
    Regulation Filings
    
    April 10, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. TPS Guatemala One, Inc.
    
    [Docket No. EG95-38-000]
    
        Take notice that on March 30, 1995, TPS Guatemala One, Inc. (TPS 
    Guatemala) filed an application with the Commission for a determination 
    that it is an exempt wholesale generator (EWG). In support of its 
    application, TPS Guatemala asserts that it will own indirectly a 
    majority interest in a 78 megawatt generating facility to be 
    constructed at a site near Escuintla, Guatemala, located approximately 
    35 miles southwest of Guatemala City, Guatemala. In its application, 
    TPS Guatemala states that its communications and correspondence 
    regarding this Application should be served on its representative: 
    Sheila M. McDevitt, Esq., Vice President, Assistant General Counsel, 
    TECO Energy, Inc., 702 North Franklin Street, Tampa, Florida 33602, 
    (813) 228-1804.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Tampa Centro Americana de Electricidad, Limitada
    
    [Docket No. EG95-39-000]
    
        Take notice that on March 30, 1995, Tampa Centro Americana de 
    Electricidad, Limitada (TCAE) submitted an application to the 
    Commission for a determination that it is an exempt wholesale generator 
    (EWG). In support of its application, TCAE asserts that it will own and 
    operate a 78 megawatt generating facility at a site near Escuintla, 
    Guatemala, located approximately 35 miles southwest of Guatemala City, 
    Guatemala. TCAE further states that all communications and 
    correspondence regarding this Application should be served on its 
    representative, Sheila M. McDevitt, Esq. Vice President, Assistant 
    General Counsel, TECO Energy, Inc., 702 North Franklin Street, Tampa, 
    Florida 33602, (813) 228-1804.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. New Hampshire Electric Cooperative v. Public Service Company of New 
    Hampshire
    
    [Docket No. EL95-37-000]
    
        Take notice that on March 27, 1995, New Hampshire Electric 
    Cooperative (NHEC) tendered for filing a complaint against Public 
    Service Company of New Hampshire's (PSNH's) Fuel and Purchased Power 
    Adjustment Clause submitted by PSNH to the Commission on December 27, 
    1994. PSNH filed this FPPAC, as it is annually required to do under the 
    Amended Partial Requirements Agreement between NHEC and PSNH in Docket 
    No. ER95-353-000.
        Comment date: May 10, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. Sithe/Independence Power Partners, L.P. v. Niagara Mohawk Power 
    Corp.
    
    [Docket No. EL95-38-000]
    
        Take notice that on March 29, 1995, Sithe/Independence Power 
    Partners L.P. (Sithe) tendered for filing a complaint against Niagara 
    Mohawk Power Corporation (Niagara) regarding Niagara's calculation of 
    transmission loss factors for Sithe. In its complaint Sithe requests 
    that the Commission: (a) Order Niagara to recalculate the transmission 
    losses associated with the November 5, 1991, Transmission Services 
    Agreement between Sithe and Niagara; (b) order Niagara to share with 
    Sithe and file with the Commission details about Niagara's methodology 
    for determining transmission losses on its system; and (c) investigate 
    the methodology Niagara uses to determine transmission losses on its 
    system and modify such methodology as necessary to ensure that it is 
    just, reasonable, not unduly discriminatory and in the public interest.
        Comment date: May 10, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. Pacific Gas and Electric Co.
    
    [Docket No. ER95-778-000]
    
        Take notice that on March 21, 1995, Pacific Gas and Electric 
    Company (PG&E), tendered for filing revisions to the following 
    agreements between PG&E and the City of Santa Clara, California (City 
    or Santa Clara): (1) The Interconnection Agreement between Pacific Gas 
    and Electric Company and the City of Santa Clara (LA), initially filed 
    in FERC docket No. ER84-6-000 and designated as PG&E Rate Schedule FERC 
    No. 85; (2) the Grizzly Development and Mokelume Settlement Agreement 
    (Grizzly Agreement), initially filed in FERC Project No. 137-002 and 
    designated as PG&E Rate Schedule FERC No. 137; (3) the System Bulk 
    Power Sale and Purchase Agreement (Bulk Power Agreement), initially 
    filed in FERC Docket No. ER87-498-000 and designated as PG&E Rate 
    Schedule FERC No. 108.
        PG&E's filing as to the IA proposes revisions to: (1) Section II.6 
    of Appendix A, relating to transmission rates and transmission 
    functions; (2) Section II.8 of Appendix A, regarding Capacity Reserve; 
    and (3) Exhibit A-4 to Appendix A, regarding Firm Transmission Service 
    between Points of Receipt and Points of Delivery.
        PG&E's filing as to Grizzly Amendment No. Two proposes revisions to 
    the power purchases for resources.
        PG&E's filing as to the Bulk Power Agreement proposes revisions to 
    the term of the agreement and terms, conditions and rates for power 
    sales.
        Copies of this filing were served upon Santa Clara and the 
    California Public Utilities Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Resources West Energy Corp.
    
    [Docket No. ER95-808-000]
    
        Take notice that on March 28, 1995, Resources West Energy 
    Corporation (Resources West), tendered for filing three transmission 
    tariffs; a network integration service tariff; a firm point-to-point 
    transmission service tariff; and a nonfirm point-to-point transmission 
    service tariff. Resources West proposes that these three tariffs become 
    effective upon the merger of Sierra Pacific Resources (parent company 
    of Sierra Pacific Power Company) and The Washington Water Power 
    Company.
        Copies of this filing have been served on the Public Service 
    Commission of Nevada, the Washington Utilities and Transportation 
    Commission, the California Public Utilities Commission, Montana Public 
    Service Commission, Public Utility Commission of Oregon and the Idaho 
    Public Utilities Commission, as well as current wholesale requirements 
    customers of Sierra Pacific Power Company and The Washington Water 
    Power Company and Parties of Record in Docket No. EC94-23-000.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Northeast Utilities Service Co.
    
    [Docket No. ER95-815-000]
    
        Take notice that on March 28, 1995, Northeast Utilities Service 
    Company [[Page 19247]] (NUSCO), tendered for filing a Service Agreement 
    and a Certificate of Concurrence with Vermont Electric Generation and 
    Transmission Cooperative (VEG&T) under the NU System Companies System 
    Power Sales/Exchange Tariff No. 6.
        NUSCO states that a copy of this filing has been mailed to VEG&T.
        NUSCO requests that the Service Agreement become effective on March 
    17, 1995.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Union Electric Co.
    
    [Docket No. ER95-816-000]
    
        Take notice that on March 28, 1995, Union Electric Company (UE), 
    tendered for filing a Transmission Service Agreement dated March 29, 
    1995 between Rainbow Energy Marketing Corporation (REMC) and UE. UE 
    asserts that the purpose of the Agreement is to set out specific rates, 
    terms, and conditions for transmission service transactions from UE to 
    REMC.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. PECO Energy Co.
    
    [Docket No. ER95-820-000]
    
        Take notice that on March 30, 1995, PECO Energy Company (PECO), 
    tendered for filing an Agreement between PECO and Atlantic City 
    Electric Company (ACE) dated March 17, 1995.
        PECO states that the Agreement sets forth the terms and conditions 
    for the sale of system energy which it expects to have available for 
    sale from time to time and the purchase of which will be economically 
    advantageous to ACE. In order to optimize the economic advantage to 
    both PECO and ACE, PECO requests that the Commission waive its 
    customary notice period and permit the agreement to become effective on 
    March 31, 1995.
        PECO states that a copy of this filing has been sent to ACE and 
    will be furnished to the Pennsylvania Public Utility Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Idaho Power Co.
    
    [Docket No. ER95-821-000]
    
        Take notice that on March 30, 1995, Idaho Power Company (IPC), 
    tendered for filing a rate schedule amendment for the Power Sale 
    Agreement between IPC and the cities of Azusa, Banning and Colton, 
    California.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Northeast Utilities Service Co.
    
    [Docket No. ER95-822-000]
    
        Take notice that on March 30, 1995, Northeast Utilities Service 
    Company (NUSCO), tendered for filing on behalf of The Connecticut Light 
    and Power Company, Western Massachusetts Electric Company, Holyoke 
    Water Power Company, and Public Service Company of New Hampshire 
    (together, the NU System Companies), a filing for a System Power Sales 
    Agreement with Commonwealth Electric Company (CES). NUSCO requests that 
    the rate schedule become effective on June 1, 1995.
        NUSCO states that copies of the filing have been mailed or 
    delivered to the NU System Companies, CES and the Massachusetts 
    Department of Public Utilities.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Central Maine Power Co.
    
    [Docket No. ER95-823-000]
    
        Take notice that on March 30, 1995, Central Maine Power Company 
    (CMP), tendered for filing executed service agreements entered into 
    with the following entities: Catex Vitol Electric Inc., Citizens Lehman 
    Power Sales, Commonwealth Electric Company, Consolidated Edison Co. of 
    New York, Inc., Louis Dreyfus Electric Power Inc., ENRON Power 
    Marketing, Inc., Long Island Lighting Co., New England Power Company, 
    New York Power Authority, Town of Hudson, Massachusetts and Vermont 
    Marble Power Division of Omya, Inc. Service will be provided pursuant 
    to CMP's previously accepted Power Sales Tariff, designated rate 
    schedule CMP--FERC Electric Tariff, Original Volume No. 2, as 
    supplemented. An effective date for commencement of service of April 1, 
    1995 is requested for each of the service agreements.
        CMP has served a copy of the filing on the affected customers and 
    on the Maine Public Utilities Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Puget Sound Power & Light Co.
    
    [Docket No. ER95-824-000]
    
        Take notice that on March 30, 1995, Puget Sound Power & Light 
    Company tendered for filing an Agreement Providing for Termination of 
    Agreement for Assignment and for Exchange of Power between Puget and 
    Public Utilities District No. 1 of Grays Harbor County, Washington (the 
    District) executed as of March 2, 1995 (the Exchange Agreement). A copy 
    of the filing was served upon the District.
        Puget states that the Exchange Agreement relates to the exchange 
    and scheduling by Puget and the District of the District's Centralia 
    Project output share, the sale by Puget to the District of reserve 
    capacity, and the provision by Puget of certain associated services, 
    all pursuant to the terms of the Exchange Agreement.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Western Resources, Inc.
    
    [Docket No. ER95-825-000]
    
        Take notice that on March 30, 1995, Western Resources, Inc. (WRI), 
    tendered for filing a change in its Service Agreement No. 4 under FERC 
    Electric Tariff, Original Volume No. 1. WRI states that the change is 
    to amend Exhibit A to the Transmission Service Agreement between WRI 
    and the City of Neodesha. This change is requested to become effective 
    June 1, 1995.
        Copies of this filing were served upon the City of Neodesha and the 
    Kansas Corporation Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Kansas Gas and Electric Co.
    
    [Docket No. ER95-826-000]
    
        Take notice that on March 30, 1995, Western Resources, Inc. (WRI), 
    on behalf of Kansas Gas and Electric Company (KG&E), tendered for 
    filing a proposed change to KG&E's Rate Schedule FPC No. 93. WRI states 
    that the proposed change is to add one year to the term of Service 
    Schedule SP-1 between KG&E and WRI, and to increase the capacity 
    nomination thereunder.
        A copy of the filing has been served upon the Kansas Corporation 
    Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Kansas Gas and Electric Co.
    
    [Docket No. ER95-827-000]
    
        Take notice that on March 30, 1995, Kansas Gas and Electric Company 
    (KG&E), tendered for filing a change in its Federal Power Commission 
    Electric Service Tariff No. 93. KG&E states that the change is to 
    reflect the amount of transmission capacity requirements required by 
    Western Resources, Inc. under Service Schedule W to FPC Rate 
    [[Page 19248]] Schedule No. 93 for the period June 1, 1995 through May 
    31, 1996.
        Copies of this filing were served upon the Kansas Corporation 
    Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Boston Edison Co.
    
    [Docket No. ER95-828-000]
    
        Take notice that on March 30, 1995, Boston Edison Company (Edison) 
    and New England Power Company (NEP), tendered for filing a Fourth 
    Extension Agreement to Rate Schedule No. 46. The purpose of the 
    agreement is to extend the notice of termination of service under Rate 
    Schedule No. 46 to September 30, 1995 from May 31, 1995 the return on 
    equity provision of the Facilities Support Agreement.
        The filing companies state that they have served the filing on the 
    Massachusetts Department of Public Utilities.
        The parties request that the amendment become effective on June 1, 
    1995.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Southern California Edison Co.
    
    [Docket No. ER95-830-000]
    
        Take notice that on March 31, 1995, Southern California Edison 
    Company, tendered for filing the following power sale agreement between 
    the City of Colton (Colton) and Edison, and the associated supplement 
    agreement to integrate the power sale agreement in accordance with the 
    terms of the 1990 Integrated Operations Agreement (1990 IOA), Rate 
    Schedule FERC No. 249:
    
    1995 Power Sale Agreement Between The City of Colton and The Southern 
    California Edison Company (1995 PSA)
    
    Supplemental Agreement for the Integration of the 1995 Power Sale 
    Agreement Between Southern California Edison and The City of Colton 
    (Supplemental Agreement)
    
        The 1995 PSA provides the terms and conditions whereby Edison shall 
    make available and Colton shall purchase Contract Capacity and 
    Associated Energy during the Delivery Season of June 1 through 
    September 30 (4 months/year) during the years 1995, 1996, and 1997. The 
    Supplemental Agreement sets forth the terms and conditions under which 
    Edison will integrate the 1995 PSA pursuant to the 1990 IOA.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. New England Power Co.
    
    [Docket No. ER95-837-000]
    
        Take notice that on March 31, 1995, New England Power Company 
    tendered for filing a transmission contract for service to Citizens 
    Lehman Power Sales.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Carolina Power & Light Co.
    
    [Docket No. ER95-839-000]
    
        Take notice that on March 31, 1995, Carolina Power & Light Company 
    (Carolina) tendered for filing a Notice of Termination of Rate Schedule 
    FERC No. 49 between Carolina and the Town of Bennettsville. Carolina 
    has requested a termination date of June 1, 1995.
        Notice of the termination has been served upon the Town of 
    Bennettsville.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    21. CNG Power Services Co.
    
    [Docket No. ER95-840-000]
    
        Take notice that on March 31, 1995, CNG Power Services Corporation 
    (CNGPS) tendered for filing a Service Agreement between CNGPS and R.J. 
    Dahnke & Associates (Dahnke), dated March 1, 1995, and a request for 
    waiver of the Commission's notice requirements. This Service Agreement 
    indicates that CNGPS has been authorized by the Commission to market 
    wholesale electric power. CNGPS obtained authority for such 
    transactions pursuant to its FERC Electric Rate Schedule No. 1 (Rate 
    Schedule), which was accepted by the Commission by letter order dated 
    October 25, 1994 at Docket No. ER94-1554-000. The Service Agreement 
    allows CNGPS and Dahnke to enter into individual transactions for the 
    sale by CNGPS to Dahnke of energy and/or capacity at mutually agreed 
    rates.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Northern Indiana Public Service Co.
    
    [Docket No. ER95-843-000]
    
        Take notice that on March 31, 1995, Northern Indiana Public Service 
    Company tendered for filing on behalf of Wabash Valley Power 
    Association, Inc. and itself the Eleventh Supplemental Agreement to the 
    Interconnection Agreement, Dated April 16, 1984, by and Between 
    Northern Indiana Public Service Company and Wabash Valley Power 
    Association, Inc. Dated March 14, 1995 (Supplemental).
        The Supplemental adds the phrase ``Up to'' the demand compensation 
    section of Service Schedule M--Unit Peaking Capacity and Energy NIPSCO 
    to Wabash Valley of the Interconnection Agreement between the Parties.
        Copies of this filing have been sent to Wasbash Valley Power 
    Association, Inc. and the Indiana Utility Regulatory Commission.
        Comment date: April 24, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-9367 Filed 4-14-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
04/17/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-9367
Dates:
April 24, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
19246-19248 (3 pages)
Docket Numbers:
Docket No. EG95-38-000, et al.
PDF File:
95-9367.pdf