02-9285. Notice of Applications Ready For Environmental Analysis, Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • Start Preamble April 11, 2002.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Application for new license.

    b. Project No.: 2086-035.

    c. Date filed: August 30, 2001.

    d. Applicant: Southern California Edison.

    e. Name of Project: Vermillion Valley Project.

    f. Location: On Mono Creek in Fresno County, near Shaver Lake, California. The project affects federal lands in the Sierra National Forest, covering a total of 2,202 acres.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. §§ 791 (a)—825(r).

    h. Applicant Contact: Thomas J. McPheeters, Manager, Northern Hydro Region, Southern California Edison Company, 54205 Mountain Poplar Road, P.O. Box 100, Big Creek, California 93605, (559) 893-3646.

    i. FERC Contact: Jim Fargo at (202) 219-2848; e-mail james.fargo@ferc.fed.us.

    j. Cooperating agencies: We are asking Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us to prepare the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in item k below.

    k. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice.

    All documents (original and eight copies) should be filed with: Magalie R. Salas Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    The Commission's rules of practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    Comments, recommendations, terms and conditions, and prescriptions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site (http://www.ferc.gov) under the “e-Filing” link.

    l. Status of environmental analysis: This application has been accepted for filing and is now ready for environmental analysis

    m. The existing Vermillion Project consists of: (1) A 4,234-foot-long earth-fill dam; (2) Lake Edison, with a 125,035 acre-foot storage capacity at 7,642 feet; (3) a service spillway at the left abutment with a single manually operated radial gate 15 feet wide by 8 feet high, and an auxiliary spillway at the right abutment with an ungated chute discharging into an ungated channel; (4) a man-made outlet channel extending 1,300 feet to Mono Creek; and (5) a 3-kW Pelton-wheel turbine located in the outlet structure used to recharge batteries in the valve house.

    n. Locations of the Applications: Copies of the applications are available for inspection or reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First Street, NE., Washington, DC 20426, or by calling (202) 208-2326. The applications may also be viewed on the web at http://www.ferc.gov using the “RIMS” link-select “Docket #” and follow the instructions (call 202-208-2222 for assistance). A copy is also available for inspection and reproduction at the address in item h above.

    o. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and Start Printed Page 18890conditions and prescriptions concerning the application be filed with the Commission within 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice.

    Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008.

    All filings must (1) bear in all capital letters the title “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.

    Start Signature

    Linwood A. Watson, Jr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 02-9285 Filed 4-16-02; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/17/2002
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
02-9285
Pages:
18889-18890 (2 pages)