2013-09127. Uranium Enrichment Fuel Cycle Inspection Reports Regarding Louisiana Energy Services, National Enrichment Facility, Eunice, New Mexico, Prior to the Commencement of Operations  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Notice of availability.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Raddatz, Project Manager, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Rockville, Maryland 20852; telephone: 301-492-3108; email: Michael.Raddatz@nrc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Introduction

    The U.S. Nuclear Regulatory Commission (NRC) staff has conducted inspections of the Louisiana Energy Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has authorized the introduction of uranium hexafluoride (UF6) into cascades numbered 2.9, 2.10, 2.11, 2.12, 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, and 3.9. In addition, the NRC verified that the Phase 2a and Chemistry Laboratory of the Cylinder Receipt and Dispatch Building (CRDB) of the facility have been constructed in accordance with the requirements of the approved license. Phase 2a included the CRDB Civil Structure and CRDB shell operations such as: movement of cylinders; fire walls; transient combustible inspections; cylinder movers; and worker evacuation. The NRC staff has prepared inspection reports documenting its findings in accordance with the requirements of the NRC Inspection Manual, and these reports are available for review as specified in Section II of this notice. The publication of this notice satisfies the requirements of Section 70.32(k) of Title 10 of the Code of Federal Regulations (10 CFR), and section 193(c) of the Atomic Energy Act of 1954, as amended.

    The introduction of UF6 into any module of the National Enrichment Facility is not permitted until the NRC completes an operational readiness and management measures verification review to verify that management measures that ensure compliance with the performance requirements of 10 CFR 70.61 have been implemented and confirms that the facility has been constructed in accordance with the license and will be operated safely. Subsequent operational readiness and management measures verification reviews will continue throughout the various phases of plant construction and, upon completion of these subsequent phases, additional notices of the operation approval letters will be published in the Federal Register in accordance with 10 CFR 70.32(k).

    II. Further Information

    Documents related to this action, including the application for amendment and supporting documentation, are available online in the NRC Library at http://www.nrc.gov/​reading-rm/​adams.html. From this site, you can access the NRC's Agencywide Document Access and Management System (ADAMS), which provides text and image files of NRC's public documents. Inspection reports associated with the approval letters are referenced in the letters and are also available electronically in ADAMS. Accession numbers for the approval letters are being noticed here as follows:

    NRC Cascades Authorization Letters

    Authorization lettersDateADAMS accession No.
    Cascade numbered 2.9September 28, 2012ML12272A189
    Cascade numbered 2.10September 14, 2012ML12261A040
    Cascade numbered 2.11August 24, 2012ML12237A190
    Cascade numbered 2.12July 16, 2012ML12198A121
    Cascade numbered 3.1August 14, 2012ML12227A401
    Cascade numbered 3.2September 25, 2012ML12269A155
    Start Printed Page 23313
    Cascade numbered 3.3October 31, 2012ML12306A048
    Cascade numbered 3.4October 31, 2012ML12306A048
    Cascade numbered 3.5November 21, 2012ML12326A563
    Cascade numbered 3.6December 20, 2012ML12355A171
    Cascade numbered 3.7January 14, 2013ML13015A042
    Cascade numbered 3.8February 13, 2013ML13044A527
    Cascade numbered 3.9March 14, 2013ML13074A068

    NRC Authorization Letters Related to the Cylinder Receipt and Dispatch Building

    Authorization lettersDateADAMS accession No.
    CRDB Chemistry LaboratoryJanuary 16, 2013ML13016A011
    CRDB Phase 2aJanuary 30, 2013ML13030A327

    If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC Public Document Room (PDR) Reference staff at 1-800-397-4209, 301-415-4737 or by email to pdr.resource@nrc.gov.

    These documents may also be viewed electronically on the public computers located at the NRC's PDR, O 1 F21, One White Flint North, 11555 Rockville Pike Rockville, MD 20852. The PDR reproduction contractor will copy documents for a fee.

    Start Signature

    Dated at Rockville, Maryland this 11th day of April.

    For the Nuclear Regulatory Commission.

    Brian W. Smith,

    Chief, Uranium Enrichment Branch, Division of Fuel Cycle Safety, and Safeguards Office of Nuclear Material Safety, and Safeguards.

    End Signature End Supplemental Information

    [FR Doc. 2013-09127 Filed 4-17-13; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Comments Received:
0 Comments
Published:
04/18/2013
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Notice of availability.
Document Number:
2013-09127
Pages:
23312-23313 (2 pages)
Docket Numbers:
Docket No. 70-3103, NRC-2010-0264
PDF File:
2013-09127.pdf