96-9624. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 77 (Friday, April 19, 1996)]
    [Notices]
    [Page 17283]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-9624]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-310-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    April 15, 1996.
        Take notice that on April 11, 1996, ANR Pipeline Company (ANR), 500 
    Renaissance Center, Detroit, Michigan 48243, filed a request with the 
    Commission in Docket No. CP96-310-000. Pursuant to Sections 157.205 and 
    157.212 the Commission's Regulations under the Natural Gas Act (NGA) 
    for authorization to construct and operate a new delivery point for 
    delivery of natural gas for an existing customer, in Fulton County, 
    Ohio, authorized in blanket certificate issued in Docket No. CP82-480-
    000, all as more fully set forth in the request on file with the 
    Commission and open to public inspection.
        ANR proposes to construct and operate an interconnection between 
    ANR and West Ohio Gas Company (West Ohio), in Dover Township, Fulton 
    County, Ohio. The proposed interconnection would enable West Ohio to 
    provide deliveries of natural gas to North Star BHP Steel LTD. ANR 
    states that the interconnection would consist of two six-inch taps and 
    an electronic measurement system. The estimated cost of the facilities 
    would be approximately $75,000. The quantities of natural gas to be 
    delivered would be 12,000 to 15,000 Mcf per day.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-9624 Filed 4-18-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
04/19/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-9624
Pages:
17283-17283 (1 pages)
Docket Numbers:
Docket No. CP96-310-000
PDF File:
96-9624.pdf