E7-7415. Drawbridge Operation Regulation; Illinois Waterway, Illinois  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Final rule.

    SUMMARY:

    The Coast Guard is revising the drawbridge operations for the Pekin Railroad Drawbridge, Mile 151.2, at Pekin, Illinois and the Chessie Railroad Drawbridge, Mile 254.1 at Seneca, Illinois across the Illinois Waterway. The present regulation found in § 117.393(b) is being revised to reflect the actual procedures that have always been followed. That regulation was intended to be temporary, for test purposes only, and was inadvertently permanently included in the Code of Federal Regulations. This rule eliminates the “Specific Requirements” for remote operation, and the bridge will continue to operate, as required by the Coast Guard, under the “General Requirements”. In addition, the Coast Guard is revising the regulation governing the operation of the Chessie Railroad Drawbridge across the Illinois Waterway, Mile 254.1, at Seneca, Illinois. The existing regulation requires the drawspan to open on signal. This revision is necessary to reflect a change in operating procedure.

    DATES:

    This rule is effective on May 21, 2007.

    ADDRESSES:

    Comments and material received from the public, as well as documents indicated in the preamble as being available in the docket, are part of docket CGD8-06-013 and are available for inspection or copying at room 2.107(f), in the Robert A. Young Federal Building, Eighth Coast Guard District, 1222 Spruce Street, St. Louis, MO 63103-2832, between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. Commander (dwb), Eighth Coast Guard District, Bridge Branch maintains the public docket for this rulemaking.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Roger K. Wiebusch, Bridge Administrator, (314) 269-2378.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory History

    On June 26, 2006, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulation, Illinois Waterway, IL in the Federal Register (71 FR 36295). On November 16, 2006, we published a Supplemental notice of proposed rulemaking (SNPRM) entitled Drawbridge Operation Regulation, Illinois Waterway, IL in the Federal Register (71 FR 66713). We received no letters commenting on the proposed rules. No public hearing was requested, and none was held.

    Background and Purpose

    A test period to remotely operate the Pekin Railroad Drawbridge, Mile 151.2, across the Illinois Waterway was proposed by the bridge owner. After that test period, it was determined that remote operation was not feasible. The bridge owner withdrew the proposal and the Coast Guard required the continued on-site operation of the bridge. The bridge is not remotely operated. The bridge owner has always maintained an on-site bridge operator for the bridge. However, the regulation allowing the test period was inadvertently published as a permanent change, and can be found in 33 CFR 117.393(b).

    This rulemaking corrects the drawbridge operating regulations to reflect Coast Guard approved operating conditions presently adhered to by the bridge owner and waterway users.

    33 CFR 117.5 requires the Chessie Railroad Drawbridge, mile 254.1, Illinois Waterway at Seneca, Illinois to open on signal for the passage of vessels. Due to reduced train use, the bridge owner removed the bridgetender, maintains the drawspan in the fully open position and allows train operators to close the bridge. This action was taken without proper Coast Guard notification or approval. The rule improves the navigation safety of bridge operations by establishing a method of operation and communication between vessels and bridge closure personnel.

    Discussion of Comments and Changes

    The Coast Guard received no comment letters in response to either the NPRM or the SNPRM. There were no requests for public meetings. No changes have been made to this final rule. Start Printed Page 19667

    Regulatory Evaluation

    This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security.

    The Coast Guard expects that these changes will have no economic impact on commercial traffic operating on the Illinois Waterway.

    The regulation changes will not affect the present safe operation of the bridges.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    This rule is neutral to all business entities since it affects only how the vessel operators request bridge openings.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process. Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that may disproportionately affect children.

    Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal government and Indian tribes, or on the distribution of power and responsibilities between the Federal government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    Environment

    We have analyzed this rule under Commandant Instruction M16475.1D, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore this rule is categorically excluded under figure 2-1, paragraph 32(e) of the Instruction from further environmental documentation. Paragraph 32(e) excludes the promulgation of operating regulations or procedures for drawbridges from the environmental documentation requirements of NEPA. Since this regulation would alter the normal operating conditions of the drawbridge, it falls within this exclusion. A “Categorical Exclusion Start Printed Page 19668Determination” is available in the docket for inspection or copying where indicated under ADDRESSES.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects

    Regulations

    Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; Department of Homeland Security Delegation No. 017.1; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

    End Authority Start Amendment Part

    2. Revise § 117.393(b) to read as follows:

    End Amendment Part
    Illinois Waterway.
    * * * * *

    (b) The draw of the Chessie Railroad Bridge, mile 254.1, at Seneca, Illinois, operates as follows:

    (1) The draw is normally maintained in the fully open position, displaying green mid-channel lights to indicate the span is fully open.

    (2) When a train approaches the bridge and the draw is in the open position, the train will stop, train operator shall walk out on the bridge and scan the river for approaching vessels.

    (3) If a vessel is approaching the bridge, the draw will remain open. The vessel shall contact the train operator on VHF-FM channel 16 and the train operator shall keep the draw in the fully open position until the vessel has cleared the bridge.

    (4) If no vessels are observed, the train operator initiates a five minute warning period on VHF-FM radio channel 16 before closing the bridge. The train operator will broadcast the following message: “The Chessie Railroad Bridge at Mile 254.1, Illinois River, will close to navigation in five minutes.” The announcement is repeated every minute counting down the time remaining until closure.

    (5) At the end of the five minute warning period, and if no vessels are approaching the bridge, the train operator shall sound the siren for 10 seconds, activate the alternate flashing red lights on top of the draw, then lower and lock the draw in place. Red lights shall continue to flash to indicate the draw is closed to navigation.

    (6) After the train has cleared the bridge, the draw shall be raised to its full height and locked in place, the red flashing lights stopped, and the draw lights changed from red to green.

    * * * * *
    Start Signature

    Dated: April 3, 2007.

    J.R. Whitehead,

    Rear Admiral, U.S. Coast Guard Commander, Eighth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. E7-7415 Filed 4-18-07; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
5/21/2007
Published:
04/19/2007
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
E7-7415
Dates:
This rule is effective on May 21, 2007.
Pages:
19666-19668 (3 pages)
Docket Numbers:
CGD08-06-013
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
e7-7415.pdf
CFR: (1)
33 CFR 117.393