2021-08004. Air Plan Approval; Arkansas; Arkansas Regional Haze and Visibility Transport State Implementation Plan Revisions; Correction
-
Start Preamble
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule; correction.
SUMMARY:
The Environmental Protection Agency (EPA) is correcting a final rule that appeared in the Federal Register on March 22, 2021, and that will become effective on April 21, 2021. The EPA finalized approval of a revision to the Arkansas State Implementation Plan (SIP) submitted by the State of Arkansas through the Arkansas Department of Energy and Environment, Division of Environmental Quality (DEQ). This document corrects an error in the regulatory text. This correction does not Start Printed Page 20290change any final action taken by the EPA on March 22, 2021.
DATES:
Effective on April 21, 2021.
ADDRESSES:
The EPA has established a docket of all documents for this action at https://www.regulations.gov under Docket ID No. EPA-R06-OAR-2015-0189. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet. Publicly available docket materials are available electronically through https://www.regulations.gov.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
James E. Grady, EPA Region 6 Office, Regional Haze and SO2 Section, 1201 Elm Street, Suite 500, Dallas, TX 72570, 214-665-6745; grady.james@epa.gov. Out of an abundance of caution for members of the public and our staff, the EPA Region 6 office will be closed to the public to reduce the risk of transmitting COVID-19. Please call or email the contact listed above if you need alternative access to material indexed but not provided in the docket.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
On March 22, 2021 (86 FR 15104), EPA published a final rule action, “Air Plan Approval; Arkansas; Arkansas Regional Haze and Visibility Transport State Implementation Plan Revisions.” The final rule approved revisions to the State Implementation Plan (SIP) for the State of Arkansas concerning requirements of the Clean Air Act and the Regional Haze Rule for visibility protection in mandatory Class I Federal areas for the first implementation period and pertain specifically to the Domtar Ashdown Mill. The final rule also approved revisions concerning Arkansas' interstate visibility transport obligations for the following national ambient air quality standards (NAAQS): The 2006 24-hour fine particulate matter (PM2.5) NAAQS; the 2012 annual PM2.5 NAAQS; the 2008 and 2015 eight-hour ozone (O3) NAAQS; the 2010 one-hour nitrogen dioxide (NO2) NAAQS; and the 2010 one-hour SO2 NAAQS. For more information, please see the EPA's rulemaking action at https://www.regulations.gov under Docket ID No. EPA-R06-OAR-2015-0189.
Need for Correction
As published, the regulatory text in the final rule contains an error that omits the amendatory instruction for adding two entries to the table entitled “EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP” in 40 CFR 52.170(e). The EPA finds that there is good cause to make this correction without providing for notice and comment because neither notice nor comment is necessary and would not be in the public interest due to the nature of the correction which is minor, technical and does not change the obligations already existing in the rule. While the “Identification of Plan” section of the regulatory text accurately includes the three new entries added to the “EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP” table, the amendatory instruction erroneously states that one entry rather than three are being added to the table. Therefore, the EPA finds that the corrections are merely correcting the amendatory instruction without changing any final action taken by the EPA on March 22, 2021.
Federal Register Correction
Start Amendment PartIn FR Doc. 2021-05362 at 86 FR 15104 in the issue of Monday, March 22, 2021, the following corrections are made:
End Amendment Part[Corrected]1. On page 15131, in the third column, in amendment 2.b. the instruction “In paragraph (e), the third table titled “EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP” is amended by adding an entry for “Arkansas Regional Haze Phase III SIP Revision” at the end of the table.” is corrected to read “In paragraph (e), the third table titled “EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP” is amended by adding entries for “Arkansas Regional Haze Phase III SIP Revision,” “Arkansas 2015 O 3 NAAQS Interstate Transport SIP Revision,” and “Arkansas Regional Haze SO2 and PM SIP Revision” at the end of the table.”
End Amendment Part Start SignatureDated: April 14, 2021.
David Gray,
Acting Regional Administrator, Region 6.
[FR Doc. 2021-08004 Filed 4-16-21; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Effective Date:
- 4/21/2021
- Published:
- 04/19/2021
- Department:
- Environmental Protection Agency
- Entry Type:
- Rule
- Action:
- Final rule; correction.
- Document Number:
- 2021-08004
- Dates:
- Effective on April 21, 2021.
- Pages:
- 20289-20290 (2 pages)
- Docket Numbers:
- EPA-R06-OAR-2015-0189, FRL-10022-74-Region 6
- PDF File:
- 2021-08004.pdf
- Supporting Documents:
- » AR020.0276-000 NPCA, Sierra Club, and Earth Justice Comments and PDF exhibits
- » AR020.0271-000 SIP Appendix D
- » AR020.0269-000 SIP Appendix B
- » AR020.0258 Approval and Promulgation of Air Quality Implementation Plans; State of Arkansas; Regional Haze and Interstate Visibility Transport Federal Implementation Plan Revisions; Withdrawal of Federal Implementation Plan for NOx for Electric Generating Units in Arkansas, Final rule, 6 pages.
- » AR020.0243 Entergy Petition Seeking Reconsideration and Request for Administrative Stay of the Arkansas Regional Haze FIP. 306 pages 7.4 MB x7d
- » AR020.0233 TCEQ_CAMx_Modeling_Guidance_2007Dec
- » AR020.0230 reasonable_progress_guid071307
- » AR020.0227 IWAQM phase 1
- » AR020.0225 final-03-pm-rh-guidance_2007
- » AR020.0224 Exhibit 7- Evaluation of Craig BART Modeling for Regional Haze Analysis- Hoffnagle