99-8183. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 63 (Friday, April 2, 1999)]
    [Notices]
    [Pages 15969-15970]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-8183]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6241-4]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared March 8, 1999 through March 
    12, 1999 pursuant to the Environmental Review Process (ERP), under 
    Section 309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal activities at (202) 
    564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in the Federal Register dated 
    April 10, 1998 (63 FR 17856).
    
    Draft EISs
    
        ERP No. D-AFS-B65005-NH Rating EC2, Appalachian Mountain Club (AMC) 
    Huts and Pinkham Notch Visitor Center (PNVC) Continued Operations, 
    Special Use Permit and Possible COE Permit Issuance, White Mountain 
    National Forest, Grafton and Coos Counties, NH.
        Summary: EPA expressed environmental concerns with regard to the 
    analysis of impacts to water supply, ground water and wetlands and 
    asked that those issues be addressed in the final EIS in order to fully 
    evaluate the environmental acceptability of the proposed project.
        ERP No. D-AFS-B65008-VT Rating EC2, Mount Snow/Haystack Resort, 
    Expansion of Snowmaking Coverage and Development of Alternative Water 
    Supplies, Special-Use-Permit and COE Section 404 Permit, Green Mountain 
    National Forest, Manchester Ranger District, Windham County, VT.
        Summary: EPA expressed environmental concerns pertaining to water 
    quality impacts and asked for a more complete discussion of cumulative 
    effects associated with the development of the proposed snowmaking 
    infrastructure. EPA supported the proposed changes that would bring 
    existing water withdrawals in line with established flow criteria and 
    encouraged the Forest Service to use the comments on the DEIS to frame 
    discussions about modifications to the existing water withdrawal 
    settlement agreement.
        ERP No. D-AFS-J65217-UT Rating EC2, Brighton Ski Resort Master 
    Development Plan Updated, Implementation, Wasatch-Cache National 
    Forest, Salt Lake City, UT.
    
    [[Page 15970]]
    
        Summary: EPA expressed environmental concerns from based primarily 
    on the need for identifying potential adverse impacts to wetlands 
    resources from snow storage. The final EIS should include additional 
    mitigation measures to reduce impacts to the aquatic ecosystem.
        ERP No. D-AFS-J65293-MT Rating EC2, Taylor Fork Timber Sale and 
    Road Restoration, Implementation, Buck Creek, Taylor Fork Creek and 
    Eldridge Creek, Gallatin National Forest, Madison Ranger, Hebgen Lake 
    Ranger District, Yellow Stone, Gallatin County, MT.
        Summary: EPA expressed environmental concerns due to lack of 
    information regarding wetlands, existing watershed conditions, and 
    potential impacts to westslope cutthroat trout.
        ERP No. D-AFS-J65298-CO Rating EC2, South Fork Salvage Analysis 
    Area, Implementation, Routt Divide Blowdown, Land and Resource 
    Management Plan, Medicine Bow-Routt National Forests, Hahns Peak/Bears 
    Ears Ranger District, Rounty County, CO.
        Summary: EPA expressed environmental concerns and requested 
    information on impacts from road reconstruction actions and 
    identification of any roads in Streamline Management Zones (SMZs).
        ERP No. D-AFS-L61218-ID Rating EC2, Frank Church--River of No 
    Return Wilderness (FC-RONRW), Implementation for the Future Management 
    of Land and Water Resource, Bitterroot, Boise, Nez Perce, Payette and 
    Salmon-Challis National Forests, ID.
        Summary: EPA expressed environmental concerns related to the 
    potential adverse of using herbicides to manage noxious weeds in 
    wilderness areas.
        ERP No. D-AFS-L65313-ID Rating EC2, Silver Creek Integrated 
    Resource Project, Implementation, Middle Fork Payette River, Boise 
    National Forest, Boise and Valley Counties, ID.
        Summary: EPA expressed environmental concerns with potential 
    adverse impacts to water quality, air quality and wilderness habitat.
        ERP No. D-AFS-L65314-OR Rating EO2, Mill Creek Watershed Timber 
    Sales Project, Implementation, Ochoco National Forest, Crook County, 
    OR.
        Summary: EPA expressed environmental objections with the proposed 
    alternative and with potential adverse impacts to water quality, 
    wildlife and riparian conservation areas.
        ERP No. D-AFS-L65315-ID Rating EO2, West Fork Potlatch Timber 
    Harvesting, Road Construction, Reforestation and Watershed Restoration, 
    Palouse Ranger District, Latah County, ID.
        Summary: EPA expressed environmental concerns related to the lack 
    of an adequate water quality analysis, impacts associated with road 
    construction, and the failure to treat the Potlatch basin as a key 
    watershed. EPA recommends that the Forest Service consider the value of 
    withdrawing the EIS and issuing a revised document.
        ERP No. D-AFS-L65320-00 Rating EC2, Targhee National Forest Open 
    Road and Open Motorized Trail Analysis, To Implement a new Travel Plan, 
    several counties, ID and Lincoln and Teton Counties, WY.
        Summary: EPA expressed environmental concerns with potential 
    impacts to water quality, cutthroat trout, canada lynx and their 
    habitat.
        ERP No. D-BLM-K65214-AZ Rating EC2, Dos Pobres/San Juan Mining Plan 
    and Land Exchange, Implementation of two Open Pit Copper Mines and one 
    Central Ore Facility, NPDES and COE Section 404 Permits, Graham County, 
    AZ.
        Summary: EPA expressed environmental concerns over potential 
    impacts to air resources, water resources and quality, and water-
    related biologic resources. EPA expect that additional mitigation 
    measures of clarification of planned mitigation and monitoring, and 
    inclusion of other additional requested information in the Final EIS 
    may alleviate or reduce these concerns. EPA level of concern over 
    potential impacts to air and water resources has also been raised by 
    the physical magnitude and potential long time line of the Proposed 
    Action.
        ERP No. D-NPS-L61222-WA Rating LO, Lake Roosevelt National 
    Recreation Area, General Management Plan, Implementation, Ferry, Grant, 
    Lincoln, Okanogan and Stevens Counties, WA.
        Summary: EPA had no objection to the preferred alternative. EPA did 
    request further discussion about how the Lake Roosevelt Management 
    Agreement affects development of a new plan; the effect of lake level 
    fluctuations on recreation facilities: water resources; geology; and 
    sustain ability.
    
    Final EISs
    
        ERP No. F-AFS-K65176-CA Sequoia National Forest Trail System Plan, 
    Implementation, Amendment to the Sequoia National Forest Land and 
    Resource Management Plan, Fresno, Kern and Tulare Counties, CA.
        Summary: EPA expressed environmental concerns with the final plan. 
    Elements of the plan may conflict the moratorium on construction in 
    road-less areas, and the Clean Water Action Plan, and EPA requested 
    that the Forest Service suspend evaluation and construction of new 
    motorized trails pursuant to the Forest Plan amendment pending the 
    release or the Forest Service's long-term transportation policy and the 
    completion of the Sierra Nevada Forest Plan Amendment NEPA process.
        ERP No. F-BLM-L61219-AK Squirrel River Wild and Scenic River 
    Suitability Study, Designation and Non-Designation, National Wild and 
    Scenic Rivers System, AK.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-NPS-E61038-TN Stones River National Battlefield General 
    Management Plan and Development Concept Plan, Implementation, Ruthford 
    County, TN.
        Summary: EPA recommends that new building construction and 
    renovations meet energy efficiency strategies, as outlined in the 
    American Society for Heating, Refrigeration and Air Conditioning 
    Efficiency guidelines. Any contractors working in the Stones River 
    floodplain should be required to conform to ``Floodplain Management 
    Guidelines'', which were issued as NPS ``Special Directive 93-4'' in 
    1993.
    
        Dated: March 30, 1999.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 99-8183 Filed 4-1-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
04/02/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-8183
Pages:
15969-15970 (2 pages)
Docket Numbers:
ER-FRL-6241-4
PDF File:
99-8183.pdf