E9-7347. City of Kaukauna, Wisconsin; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • Start Preamble March 26, 2009.

    Take notice that the following hydroelectric application has been filed Start Printed Page 14977with the Commission and is available for public inspection.

    a. Type of Application: New Major License.

    b. Project No.: 2677-019.

    c. Date filed: August 29, 2007.

    d. Applicant: City of Kaukauna, Wisconsin.

    e. Name of Project: Badger-Rapide Croche Hydroelectric Project.

    f. Location: On the Fox River in the City of Kaukauna, in Outagamie County, Wisconsin. The project does not affect federal lands.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)—825(r).

    h. Applicant Contact: Mike Pedersen, Kaukauna Utilities, 777 Island Street, P.O. Box 1777, Kaukauna, WI 54130-7077, (920) 462-0220, or Arie DeWaal, Mead & Hunt, Inc., 6501 Watts Road, Madison, WI 53719, (608) 273-6380.

    i. FERC Contact: John Smith (202) 502-8972 or john.smith@ferc.gov.

    j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice.

    All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    Comments, recommendations, terms and conditions, and prescriptions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov/​docs-filing/​ferconline.asp) under the “e-filing” link. For a simpler method of submitting text only comments, click on “Quick Comment.”

    k. This application has been accepted, and is ready for environmental analysis at this time.

    l. The existing project consists of the Badger and Rapide Croche developments.

    As licensed, the existing Badger Development utilizes the head created by the 22-foot-high Army Corps of Engineers (Corps) Kaukauna dam and consists of: (1) A 2,100-foot-long, 100-foot-wide power canal that bifurcates into a 260-foot-long, 200-foot-wide canal and a 250-foot-long, 80-foot-wide canal leading to; (2) the Old Badger powerhouse containing two 1,000-kilowatt (kW) generating units for a total installed capacity of 2,000 kW; and (3) the New Badger powerhouse containing two 1,800-kW generating units for a total installed capacity of 3,600 kW; and (4) appurtenant facilities.

    As licensed, the existing Rapide Croche Development utilizes the head created by the 20-foot-high Corps Rapide Croche dam, located approximately 4.5 miles downstream from the Badger Development and consists of: (1) A powerhouse, located on the south end of the dam, containing four 600-kW generating units for a total installed capacity of 2,400 kW; (2) the 5-mile-long, 12-kilovolt (kV) transmission line (serving both developments); and (3) appurtenant facilities.

    The license application also indicates that flashboards are used at the Kaukauna and Rapide Croche dams to provide additional head for project generation. The flashboards used at the Kaukauna dam are 6 inches high. The flashboards used at the Rapide Croche dam are 30 inches high.

    The proposed project would include decommissioning the Old Badger and New Badger developments and constructing a new 7-megawatt (MW) powerhouse about 150 feet upstream from the existing New Badger plant site. Proposed project works would consist of: (1) A modified power canal leading to; (2) a new powerhouse with integral intake; and (3) two identical 3.5- to 3.6-MW horizontal Kaplan “S” type turbines. The Old Badger development would be converted to an alternative use. The New Badger development would be decommissioned, demolished, and removed. The existing service road would be demolished and removed. The tailrace area associated with the existing Old Badger development would be filled with soil. A new service road would be constructed over the filled area. No significant changes are proposed for the Rapide Croche development.

    The existing Badger and Rapide Croche developments currently operate in a run-of-river mode. As proposed, the new project would continue to operate in a run-of-river mode.

    m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.

    All filings must (1) Bear in all capital letters the title “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    n. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E9-7347 Filed 4-1-09; 8:45 am]

    BILLING CODE

Document Information

Published:
04/02/2009
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E9-7347
Pages:
14976-14977 (2 pages)
Docket Numbers:
Project No. P-2677-019
EOCitation:
of 2009-03-26
PDF File:
e9-7347.pdf