94-9441. ENVIRONMENTAL PROTECTION AGENCY  

  • [Federal Register Volume 59, Number 76 (Wednesday, April 20, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-9441]
    
    
    [[Page Unknown]]
    
    [Federal Register: April 20, 1994]
    
    
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    
    EQUAL EMPLOYMENT OPPORTUNITY COMMISSION
     
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    40 CFR Part 52
    
    [IL89-1-6199; FRL-4875-4]
    
    Approval and Promulgation of Implementation Plans; Illinois
    
    AGENCY: Environmental Protection Agency.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On November 18, 1993, the State of Illinois submitted a State 
    Implementation Plan (SIP) revision request to the United States 
    Environmental Protection Agency (USEPA) in response to USEPA's 
    September 22, 1993 proposed sulfur dioxide (SO2) nonattainment 
    designation for Alton Township, Madison County. This revision request, 
    which limits the SO2 emissions from the Laclede Steel Co. 
    facility, is being approved because it corrects modeled ambient air 
    quality noncompliance and comports with USEPA's requirements regarding 
    Federal enforceability. Because USEPA considers this finding to be 
    noncontroversial, final action is being taken without prior proposal. 
    Also, as a consequence of the approval of the SIP revision request 
    submitted by the State, the proposed nonattainment designation for 
    Alton Township becomes moot.
    DATES: This final rule will be effective June 20, 1994 unless notice is 
    received by May 20, 1994 that someone wishes to submit adverse 
    comments. If the effective date is delayed, timely notice will be 
    published in the Federal Register.
    
    ADDRESSES: Copies of the revision request and USEPA's analysis are 
    available for inspection at the following address: U.S. Environmental 
    Protection Agency, Region 5, Air and Radiation Division, 77 West 
    Jackson Boulevard, Chicago, Illinois 60604. (It is recommended that you 
    telephone Rosanne M. Lindsay at (312) 353-1151 before visiting the 
    Region 5 Office.)
        Written comments should be sent to: J. Elmer Bortzer, Chief, 
    Regulation Development Section, Regulation Development Branch (AR-18J), 
    U.S. Environmental Protection Agency, 77 West Jackson Boulevard, 
    Chicago, Illinois 60604.
    
    FOR FURTHER INFORMATION CONTACT: Rosanne M. Lindsay at (312) 353-1151.
    
    SUPPLEMENTARY INFORMATION:
    
    I. Summary of State Submittal
    
        On November 18, 1993, the Illinois Environmental Protection Agency 
    (IEPA) submitted a SIP revision request in response to USEPA's 
    intention to designate Alton Township as nonattainment for sulfur 
    dioxide (SO2) (see 58 FR 67334, December 21, 1993). The submittal 
    corrects modeled SIP deficiencies by limiting SO2 emissions from 
    the boilers and reheat furnaces at the Laclede Steel Co. facility 
    (Laclede Steel), requiring them to use only natural gas and distillate 
    oil. These restrictions on Laclede Steel, which include recordkeeping 
    and reporting requirements, are incorporated into a federally 
    enforceable State operating permit (FESOP) for Laclede Steel pursuant 
    to the State FESOP program, approved by USEPA on December 17, 1992. The 
    modeling and emission inventory included in the submittal demonstrate 
    that the control measures at Laclede Steel address those SIP 
    deficiencies, identified by USEPA, which led to USEPA's proposed 
    nonattainment designation of Alton Township.
    
    II. Analysis of State Submittal
    
        The USEPA has undertaken its analysis of the revision request based 
    on a review of the modeling, emission inventory, and the emission 
    limitations for Laclede Steel.
    
    A. Review of Modeling and Emission Inventory
    
        Modeling consistent with USEPA guidance was performed with regard 
    to Alton Township under a contract reviewed by USEPA. The current 
    version of the Industrial Source Complex Short Term (ISCST) model was 
    used with 5 years of representative meteorological data from St. Louis, 
    Missouri. The attainment demonstration used a set of receptor arrays 
    with resolution of 100 meters. The Alton area contains some portions of 
    complex terrain. The ISCST model and the Complex-I model were evaluated 
    for use with the local terrain. ISCST was determined to provide the 
    most conservative estimations, and was therefore used throughout the 
    attainment demonstration for receptors at all terrain evaluations.
        The modeling study initially included only the SO2 emissions 
    from the 8 SO2-emitting facilities in Alton Township and the Union 
    Electric Power Plant in Portage des Sioux Township, Missouri. The 
    boilers which were included in the modeling were screened to determine 
    the load which gave the worst emissions. All boilers were found to 
    cause the greatest ambient impacts at maximum capacity, and were 
    modeled accordingly. Background SO2 concentrations were determined 
    using ambient data from local air quality monitors correlated with 
    hourly wind direction measurements.
        It was determined that attainment of the SO2 NAAQS could be 
    demonstrated if a set of emission reductions at the Laclede Steel 
    facility in Alton Township were in place. These emission reductions 
    have been incorporated into the Laclede Steel facility FESOP. Once the 
    attainment strategy for the Alton Township sources had been developed, 
    the effect of the SO2 emissions from three facilities located in 
    adjacent Wood River Township, Illinois, was taken into account. The 
    final model runs predicted that the combined emissions from Laclede 
    Steel, with the applicable emission reductions in place, the other 
    Alton area sources, and the Wood River sources would not violate the 
    NAAQS.
    
    B. Review of the Emission Limitations
    
        The IEPA has satisfied the requirements for the submittal of a 
    revision request through the issuance of an operating permit with 
    federally enforceable conditions (Application No. 93070030). The permit 
    was given public notice and was made available for public comment. The 
    conditions of the permit limit emissions of sulfur dioxide from 
    existing boilers and reheat furnaces at Laclede Steel by restricting 
    fuel usage to natural gas and distillate fuel, only. These restrictions 
    will ensure compliance with the NAAQS for the area. The permit also 
    contains recordkeeping and reporting requirements for the equipment 
    identified, the fuel received and burned at the facility, and any 
    exceedance or violation of the requirements. The entire submittal, 
    including modeling and emission inventory, has been reviewed against 
    Federal air pollution control regulations, including the Clean Air Act, 
    and conforms to the requirements for Federal enforceability.
    
    III. Final Rulemaking Action
    
        Based on the consideration of materials submitted by the State of 
    Illinois, which rectify modeled ambient air quality violations 
    identified in a September 22, 1993 proposed rule, USEPA has determined 
    that this SIP revision request for Laclede Steel is approvable. The 
    proposed redesignation of Alton Township is rendered moot as a 
    consequence of this approval.
        Because USEPA considers this action noncontroversial and routine, 
    we are approving it today without prior proposal. The action will 
    become effective on June 20, 1994. However, if we receive notice by May 
    20, 1994 that someone wishes to submit adverse comments, then USEPA 
    will publish: (1) A document that withdraws the action; and (2) a 
    document that begins a new rulemaking by proposing the action and 
    establishing a comment period.
        This action has been classified as a Table 2 action by the Regional 
    Administrator under the procedures published in the Federal Register on 
    January 19, 1989, (54 FR 2214-2225). A revision to the SIP processing 
    review tables was approved by the Acting Assistant Administrator for 
    Office of Air and Radiation on October 4, 1993 (Michael Shapiro's 
    memorandum to Regional Administrators). A future document will inform 
    the general public of these tables. Under the revised tables this 
    action remains classified as a Table 2. On January 6, 1989, the Office 
    of Management and Budget (OMB) waived Table 2 and 3 SIP revisions (54 
    FR 2222) from the requirements of section 3 of Executive Order 12291 
    for a period of 2 years. USEPA has submitted a request for a permanent 
    waiver for Table 2 and 3 SIP revisions. The OMB has agreed to continue 
    the waiver until such time as it rules on USEPA's request. This request 
    continued in effect under Executive Order 12866 which superseded 
    Executive Order 12291 on September 30, 1993.
        Nothing in this action should be construed as permitting, allowing 
    or establishing a precedent for any future request for revision to any 
    SIP. USEPA shall consider each request for revision to the SIP in light 
    of specific technical, economic, and environmental factors and in 
    relation to relevant statutory and regulatory requirements.
        Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., USEPA 
    must prepare a regulatory flexibility analysis assessing the impact of 
    any proposed or final rule on small entities. (5 U.S.C. 603 and 604.) 
    Alternatively, USEPA may certify that the rule will not have a 
    significant impact on a substantial number of small entities. Small 
    entities include small businesses, small not-for-profit enterprises, 
    and government entities with jurisdiction over populations of less than 
    50,000.
        SIP approvals under section 110 and subchapter I, part D of the 
    Clean Air Act do not create any new requirements, but simply approve 
    requirements that the State is already imposing. Therefore, because the 
    Federal SIP-approval does not impose any new requirements, I certify 
    that it does not have a significant impact on any small entities 
    affected. Moreover, due to the nature of the Federal-State relationship 
    under the Clean Air Act, preparation of a regulatory flexibility 
    analysis would constitute Federal inquiry into the economic 
    reasonableness of the State action. The Clean Air Act forbids USEPA to 
    base its actions concerning SIPs on such grounds. Union Electric Co. v. 
    USEPA., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2).Under 
    section 307(b)(1) of the Clean Air Act, petitions for judicial review 
    of this action must be filed in the United States Court of Appeals for 
    the appropriate circuit by June 20, 1994. Filing a petition for 
    reconsideration by the Administrator of this final rule does not affect 
    the finality of this rule for the purposes of judicial review nor does 
    it extend the time within which a petition for judicial review may be 
    filed, and shall not postpone the effectiveness of such rule or action. 
    This action may not be challenged later in proceedings to enforce its 
    requirements. (See section 307(b)(2).)
    
    List of Subjects in 40 CFR Part 52
    
        Environmental protection, Air pollution control, Sulfur oxides.
    
        Dated: April 6, 1994.
    Valdas V. Adamkus,
    Regional Administrator.
    
        Part 52, chapter I, title 40 of the Code of Federal Regulations is 
    amended as follows:
    
    PART 52--[AMENDED]
    
        1. The authority citation for part 52 continues to read as follows:
    
        Authority: 42 U.S.C. 7401-7671q.
    
    Subpart O--Illinois
    
        2. Section 52.724 is amended by adding paragraph (g) to read as 
    follows:
    
    
    Sec. 52.724  Control strategy: Sulfur dioxide.
    
    * * * * *
        (g) Part D--Approval--The State plan for Alton Township, Madison 
    County, which consists of a federally Enforceable State Operating 
    Permit controlling sulfur dioxide emissions from the boilers and reheat 
    furnaces at Laclede Steel, which was submitted on November 18, 1993, is 
    approved.
    [FR Doc. 94-9441 Filed 4-19-94; 8:45 am]
    BILLING CODE 6560-50-F
    
    
    

Document Information

Effective Date:
6/20/1994
Published:
04/20/1994
Department:
Equal Employment Opportunity Commission
Entry Type:
Uncategorized Document
Action:
Final rule.
Document Number:
94-9441
Dates:
This final rule will be effective June 20, 1994 unless notice is received by May 20, 1994 that someone wishes to submit adverse comments. If the effective date is delayed, timely notice will be published in the Federal Register.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: April 20, 1994
CFR: (1)
40 CFR 52.724