2020-08259. North Eastern Wisconsin Hydro, LLC; Notice of Application for Temporary Amendment and Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Application Type: Temporary amendment of exemption.
b. Project No.: 8015-008.
c. Date Filed: April 13, 2020.
d. Applicant: North Eastern Wisconsin Hydro, LLC.
e. Name of Project: Shawano Paper Mills Dam Project.
f. Location: The project is located on the Wolf River in Shawano County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Renewable Energy, 116 N State St., P.O. Box 167, Neshkoro, WI 54960; telephone: (920) 293-4628 ext. 347.
i. FERC Contact: Christopher Chaney, telephone: (202) 502-6778, and email address: christopher.chaney@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission.
All documents may be filed electronically via the internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's website at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-8015-008. Comments emailed to Commission staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. Description of Request: The exemptee requests authorization to increase the normal target impoundment elevation from 802.5 feet mean sea level (msl) to a target elevation of 802.9 feet msl between May 15, 2020, and November 15, 2020, while continuing to operate the project within the authorized elevation range of 801.83 feet msl and 803.17 feet msl. The exemptee states the amendment is necessary to determine appropriate mitigation measures for the navigational hazards that exist on Shawano Lake and the channel, and implement them prior to the 2021 recreation season.
l. Locations of the Application: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Agencies may obtain copies of the application directly from the applicant. At this time, the Commission has suspended access to the Commission's Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID-19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll free, (866) 208-3676 or TTY, (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable ; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 385.2010.
Start SignatureDated: April 14, 2020.
Kimberly Bose,
Secretary.
[FR Doc. 2020-08259 Filed 4-17-20; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 04/20/2020
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2020-08259
- Pages:
- 21848-21848 (1 pages)
- Docket Numbers:
- Project No. 8015-008
- PDF File:
- 2020-08259.pdf