[Federal Register Volume 60, Number 77 (Friday, April 21, 1995)]
[Notices]
[Pages 19916-19917]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-9928]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4722-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075. Weekly receipt of
Environmental Impact Statements Filed April 10, 1995 Through April 14,
1995 Pursuant to 40 CFR 1506.9.
EIS No. 950113, FINAL EIS, DOE, CO, Flatiron-Erie 115-kV Electrical
Transmission Line Replacement of Wood-Pole Structures, Construction,
Operation and Right-of-Way Grant, City of Longmont, Larimer, Boulder
and Weld Counties, CO, Due: May 22, 1995, Contact: Rodney Jones (303)
490-7200. Published FR--03-31-95--Refiled/Due Date Correction.
EIS No. 950133, FINAL SUPPLEMENT, AFS, CA, Bear Mountain Ski Resort
Expansion, (Formerly Known as Goldmine) New Information, San Bernardino
National Forest, Special-Use-Permit and Possible COE Section 404
Permit, San Bernardino County, CA, Due: May 22, 1995, Contact: Hal
Seyden (909) 383-5588.
EIS No. 950134, FINAL EIS, FHW, OK, OK-99/OK-3E/US 377 North of Ada
Transportation Corridor Reconstruction, Funding, COE Section 404 and
NPDES Permits, Pontotoc and Seminole Cos., OK, Due: May 22, 1995,
Contact: Gary E. Larsen (405) 231-4724.
EIS No. 950135, FINAL EIS, USA, NC, Military Ocean Terminal Navigation
Basins and Entrance Channels Improvements, Implementation, Sunny Point,
Brunswick and New Hanover Counties, NC, Due: May 22, 1995, Contact:
Gordon Schwerzmann (703) 614-6605.
EIS No. 950136, DRAFT EIS, AFS, NM, Agua/Caballos Timber Sale,
Harvesting Timber and Managing Existing Vegetation, Implementation,
Carson National Forest, El Rito Ranger District, Taos County, NM, Due:
June 16, 1995, Contact: Audrey Kuykendall (505) 758-6200.
EIS No. 950137, DRAFT EIS, BIA, MT, Yellowstone Pipe Line Easement,
Construction and Operation, Renewal of Right-of-Way (ROW) Grant for
Easement, Across the Flathead Indian Reservation, Approval of Trust and
Allotted Lands and COE Section 404 Permit, Missoula, Lake and Sanders
Counties, MT, Due: June 05, 1995, Contact: George Farris (202) 208-
4791.
EIS No. 950138, DRAFT EIS, AFS, WY, Tie Hack Dam and Reservoir
Construction, Special-Use-Permit, NPDES and COE Section 404 Permits,
Bighorn National Forest, Buffalo Ranger District, City of Buffalo, WY,
Due: June 05, 1995, Contact: John W. Almond (307) 672-0751.
EIS No. 950139, DRAFT EIS, EPA, CA, Humboldt Bay Open Ocean Dredged
Material Disposal Site (ODMDs) Designation, Samoa Peninsula, Humboldt
County, CA, Due: June 05, 1995, Contact: Allan Ota (415) 744-1980.
EIS No. 950140, DRAFT EIS, FHW, PA, US 22/US 322 (PA-0022 Section C02)
Lewistown Improvements, Construction, Funding and COE Section 404
Permit, Mifflin County, PA, Due: June 05, 1995, Contact: Manual A.
Marks (717) 782-3461.
EIS No. 950141, DRAFT EIS, AFS, CA, Barkley Fire Salvage Sale,
Implementation, Lower Deer Creek Management Area, Lassen National
Forest, Almanor Ranger District, Tehama County, CA, Due: June 05, 1995,
Contact: Phillip Tuma (916) 258-2141.
EIS No. 950142, DRAFT EIS, DOE, Nuclear Weapons Nonproliferation Policy
Concerning Foreign Research Reactor Spent Nuclear Fuel, Implementation,
Due: June 20, 1995, Contact: Charles Head (1) (800) 736-3282.
EIS No. 950143, DRAFT EIS, MMS, AL, TX, MS, LA, 1996 Center and Western
Gulf of Mexico Outer Continental Shelf (OSC) Oil and Gas Lease, Sales
No. 157 (March 1996) and No. 161 (August 1996), Lease Offerings,
offshore Coastal Counties/Parishes of Al, MS, LA and TX, Due: July 14,
1995, Contact: Archie P. Melancon (703) 787-5471. [[Page 19917]]
EIS No. 950144, DRAFT EIS, BLM, WY, Fontenelle Natural Gas Infill
Drilling Projects, Implementation, Right-of-Way Grants and Permit
Issuance, Sweetwater and Lincoln Counties, WY, Due: June 06, 1995,
Contact: Bill McMahan (307) 382-5350.
EIS No. 950145, FINAL EIS, FHW, MD, Canal Parkway Development Study,
Improvement from MD-51 to the Wiley Ford Bridge in Cumberland, Funding,
Right-of-Way Grant and COE Section 404 Permit, Allegany County, MD,
Due: May 22, 1995, Contact: David Lawton (410) 962-4440.
EIS No. 950146, DRAFT EIS, GSA, AZ, Evo A. Deconcini Federal Building--
United States Courthouse, Site Selection and Construction, Central
Business Area (CBA), City of Tucson, AZ, Due: June 06, 1995, Contact:
Mitra K. Nejad (415) 744-8107.
Amended Notices
EIS No. 950079, DRAFT EIS, FHW, MT, US 93 Highway Transportation
Project, Improvements between Evaro and Polson, Funding and COE Section
404 Permit, Missoula and Lake Counties, MT, Due: June 23, 1995,
Contact: Joe Marskik (406) 444-6394. Published FR 03-17-95--Review
period extended.
Dated: April 18, 1995.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 95-9928 Filed 4-20-95; 8:45 am]
BILLING CODE 6560-50-U