99-9912. Independent Pipeline Company, ANR Pipeline Company, National Fuel Gas Supply Corporation, Transcontinental Gas Pipe Line Corporation; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Independence Pipeline ...  

  • [Federal Register Volume 64, Number 76 (Wednesday, April 21, 1999)]
    [Notices]
    [Pages 19524-19526]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-9912]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket Nos. CP97-315-000 et al., CP97-319-000, CP98-200-00, CP98-540-
    000]
    
    
    Independent Pipeline Company, ANR Pipeline Company, National Fuel 
    Gas Supply Corporation, Transcontinental Gas Pipe Line Corporation; 
    Notice of Availability of the Draft Environmental Impact Statement for 
    the Proposed Independence Pipeline and Market Link Expansion Projects
    
    April 15, 1999.
        The staff of the Federal Energy Regulatory Commission (FERC or 
    Commission) has prepared this draft environmental impact statement 
    (draft EIS) on natural gas pipeline facilities proposed by ANR Pipeline 
    Company (ANR), Independence Pipeline Company (Independence), National 
    Fuel Gas Supply Corporation (National Fuel), and Transcontinental Gas 
    Pipe Line Corporation (Transco) in the above-referenced dockets.
        The draft EIS was prepared to satisfy the requirements of the 
    National Environmental Policy Act. The staff concludes that approval of 
    the proposed projects, with appropriate mitigating measures as 
    recommended, would have limited adverse environmental impact. The draft 
    EIS also evaluates alternatives to the proposal, including system 
    alternatives.
        The draft EIS assesses the potential environmental effects of the 
    construction and operation of the following facilities in Illinois, 
    Indiana, Michigan, Ohio, Pennsylvania, and New Jersey:
    
    ANR
    
         About 72.3 miles of high pressure pipeline looping in 
    three segments, consisting of about 42.4 miles of 42-inch-diameter 
    pipeline, and about 29.9 miles of 30-inch-diameter pipeline;
    
    [[Page 19525]]
    
         15,000 horsepower (hp) of additional compression at one 
    existing compressor station, and minor modifications to two existing 
    stations; and
         Six new internal tool or ``pig'' launchers along the new 
    pipeline loops.
    
    Independence
    
         About 397.4 miles of 36-inch-diameter high pressure 
    pipeline;
         60,000 hp of compression at three new compressor stations;
         Three new meter stations;
         Six taps to local distribution companies; and
         28 mainline valves along the pipeline.
    
    National Fuel
    
         Abandon, primarily by removal, various segments of three 
    existing pipelines within about 39.3 miles of right-of-way; and
         Minor modifications to remaining facilities along that 
    section of right-of-way to maintain service to existing customers.
    
    Transco
    
         About 154.3 miles of high-pressure pipeline looping, 
    consisting of four segments totaling 63.2 miles of 36- and 42-inch-
    diameter pipeline in Pennsylvania, six segments totaling 84.8 miles of 
    36- and 42-inch-diameter pipeline in New Jersey, and 6.3 miles of 36-
    inch-diameter replacement in New Jersey;
         62,400 hp of additional compression at three existing 
    compressor stations, and replace impeller at one existing compressor 
    station;
         Modification to three regulator stations; and
         One new pig launcher.
        The purpose of the proposed projects would be to transport natural 
    gas principally from expansion projects destined for the Chicago, 
    Illinois area, to Leidy, Pennsylvania, and to markets in the eastern 
    United States.
    
    Comment Procedures and Public Meetings
    
        Any person wishing to comment on the draft EIS may do so. Please 
    carefully follow these instructions to ensure that your comments are 
    received in time and are properly recorded:
         Reference Docket No. CP97-315-000 et al.;
         Send two copies of your comments to: David Boergers, 
    Secretary, Federal Energy Regulatory Commission, 888 First St., N.E., 
    Room 1A, Washington, DC 20426; and
         Label one copy for the attention of the Environmental 
    Review and Compliance Branch I, PR-11.1.
         Mail your comments so that they will be received in 
    Washington, DC on or before June 4, 1999.
        In addition to written copies, we will hold ten public meetings in 
    the project area to receive comments on the draft EIS. All meetings 
    will begin at 7:00 pm, and are scheduled as follows:
    
    Crown Point, Indiana: May 24, 1999
    
    Marion Education Center, St. Anthony's Hospital, 1201 South Main 
    Street, Crown Point, Indiana, (219) 757-6398
    
    Buchanan, Michigan: May 25, 1999
    
    Buchanan High School Auditorium, 401 West Chicago Street, Buchanan, 
    Michigan, (616) 695-8403
    
    Tiffin, Ohio: May 24, 1999
    
    Tiffin Columbian High School Auditorium, 300 South Monroe Street, 
    Tiffin, OH, (419) 447-6331
    
    Wooster, Ohio: May 25, 1999
    
    Ohio Agriculture Research Development Center (Ohio State University), 
    Fisher Auditorium, 1680 Madison Avenue, Wooster, Ohio, (330) 263-3738
    
    North Canton, Ohio: May 24, 1999
    
    Hoover High School, Hoover Hall, 575 7th St., NE, North Canton, Ohio, 
    (330) 497-5600
    
    Butler, Pennsylvania: May 25, 1999
    
    Intermediate High School, Auditorium, 110 Campus Lane, Butler, 
    Pennsylvania, (724) 287-8721
    
    Ridgeway, Pennsylvania: May 24, 1999
    
    Royal Inn, Boot Jack Road, Route 219 (South of Ridgeway), Ridgeway, 
    Pennsylvania, (814) 773-3153
    
    Williamsport, Pennsylvania: May 25, 1999
    
    Sheraton Inn, 100 Pine Street, Williamsport, PA, (717) 327-8231
    
    Phillipsburg, New Jersey: May 24, 1999
    
    Holiday Inn, 1314 US Highway 22, Phillipsburg, New Jersey, (908) 454-
    9771
    
    Hasbrouck Heights, New Jersey: May 25, 1999
    
    Holiday Inn, 283 Route 17 South, Hasbrouck Heights, New Jersey, (202) 
    462-9600
    
        Interested groups and individuals are encouraged to attend and 
    present oral comments on the environmental impact described in the 
    draft EIS. Transcripts of the meetings will be prepared.
        After these comments are reviewed, any significant new issues are 
    investigated, and modifications are made to the draft EIS as necessary, 
    a final EIS will be published and distributed by the staff. The final 
    EIS will contain the staff's responses to timely comments received on 
    the draft EIS.
        Comments will be considered by the Commission but will not serve to 
    make the commenter a party to the proceeding. Any person seeking to 
    become a party to the proceeding must file a motion to intervene 
    pursuant to Rule 214 of the Commission's Rules of Practice and 
    Procedure (18 CFR 385.214).
        Anyone may intervene in this proceeding based on this draft EIS. 
    You must file your request to intervene as specified above. You do not 
    need intervenor status to have your comments considered.
        All intervenors and anyone providing written comments on the draft 
    EIS will receive a copy of the final EIS. If you do not wish to comment 
    on the draft EIS but wish to receive a copy of the final EIS, you must 
    write to the Secretary of the Commission indicating this request. 
    Individuals who do not indicate their desire to receive the final EIS 
    will receive an Executive Summary. Agencies, elected officials, local 
    governments, special interest groups, libraries, and media will receive 
    a final EIS.
        The draft EIS has been placed in the public files of the FERC and 
    is available for public inspection at: Federal Energy Regulatory 
    Commission, Public Reference and Files Maintenance Branch, 888 First 
    Street, NE, Room 2A, Washington, DC 20426, (202) 208-1371.
        A limited number of copies are available from the Public Reference 
    and Files Maintenance Branch identified above. In addition, the draft 
    EIS has been mailed to Federal, state, and local agencies; public 
    interest groups; individuals who requested a copy of the draft EIS; 
    affected landowners; libraries; newspapers; and parties to this 
    proceeding.
        Additional information about the proposed projects is available 
    from Paul McKee in the Commission's Office of External Affairs, at 
    (202) 208-1088 or on the FERC website (www.ferc.fed.us) using the 
    ``RIMS'' link to information in these docket numbers. Click on the 
    ``RIMS'' link, select ``Docket #'' from the RIMS menu, and follow the 
    instructions. For assistance with access to RIMS, the RIMS helpline can 
    be reached at (202) 208-2222.
        Similarly, the ``CIPS'' link on the FERC Internet website provides 
    access to the texts of formal documents issued by the Commission, such 
    as orders,
    
    [[Page 19526]]
    
    notices, and rulemakings. From the FERC Internet website, click on the 
    ``CIPS'' link, select ``Docket #'' from the CIPS menu, and follow the 
    instructions. For assistance with access the CIPS, the CIPS helpline 
    can be reached at (202) 208-2474.
    Lonwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-9912 Filed 4-20-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
04/21/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-9912
Pages:
19524-19526 (3 pages)
Docket Numbers:
Docket Nos. CP97-315-000 et al., CP97-319-000, CP98-200-00, CP98-540- 000
PDF File:
99-9912.pdf