2010-9128. Drawbridge Operation Regulations; Hampton River, Hampton, NH, Maintenance  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the SR1A Bridge across the Hampton River at mile 0.0, at Hampton, New Hampshire. This temporary deviation allows the SR1A Bridge to remain in the closed position for 10 hours on one day to facilitate bridge maintenance.

    DATES:

    This deviation is effective from 7 a.m. through 5 p.m. on May 18, 2010.

    ADDRESSES:

    Documents mentioned in this preamble as being available in the docket are part of docket USCG-2010-0246 and are available online at http://www.regulations.gov, inserting USCG-2010-0 in the “Keyword” and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have any questions on this temporary deviation, call or e-mail Mr. John McDonald, Project Officer, First Coast Guard District, at (617) 223-8364, john.w.mcdonald@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The SR1A Bridge, across the Hampton River at mile 0.0, at Hampton, New Hampshire, has a vertical clearance in the closed position of 18 feet at mean high water and 26 feet at mean low water. The Start Printed Page 20776existing drawbridge operation regulations are listed at 33 CFR 117.697.

    The waterway predominantly supports recreational vessels of various sizes.

    The bridge owner, New Hampshire Department of Transportation, requested a temporary deviation to facilitate completion of the bridge rehabilitation, removal of the barrier system and associated counter weight.

    Under this temporary deviation the SR1A Bridge may remain in the closed position from 7 a.m. through 5 p.m. on May 18, 2010. Vessels that can pass under the bridge without a bridge opening may do so at all times.

    In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: April 5, 2010.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2010-9128 Filed 4-20-10; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
5/18/2010
Published:
04/21/2010
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
2010-9128
Dates:
This deviation is effective from 7 a.m. through 5 p.m. on May 18, 2010.
Pages:
20775-20776 (2 pages)
Docket Numbers:
Docket No. USCG-2010-0246
PDF File:
2010-9128.pdf
CFR: (1)
33 CFR 117