2014-08859. Defense Federal Acquisition Regulation Supplement: Photovoltaic Devices (DFARS Case 2014-D006)  

  • Start Preamble

    AGENCY:

    Defense Acquisition Regulations System, Department of Defense (DoD).

    ACTION:

    Final rule.

    SUMMARY:

    DoD has adopted as final, without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to clarify rules of origin under trade agreements for photovoltaic devices to be utilized under covered DoD contracts, as required by a section of the National Defense Authorization Act for Fiscal Year 2011.

    DATES:

    Effective April 21, 2014.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Amy G. Williams, telephone 571-372-6106.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    DoD published an interim rule in the Federal Register at 78 FR 76993 on December 20, 2013, to clarify rules of origin under trade agreements for photovoltaic devices to be utilized under covered DoD contracts, as required by a section of the National Defense Authorization Act for Fiscal Year 2011. One respondent submitted a public comment in response to the interim rule.

    II. Discussion and Analysis

    DoD reviewed the public comment in the development of the final rule. The interim rule was converted to a final rule without change. The one comment received related to performance of a net zero green house gas analysis, and was outside the scope of the rule.

    III. Executive Orders 12866 and 13563

    Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.

    IV. Regulatory Flexibility Act

    DoD certifies that this final rule will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because this rule will only have an impact on the determination of whether photovoltaic devices are substantially transformed in a designated country. No domestic entities will be impacted because the United States is not a designated country. For the definition of “small business,” the Regulatory Flexibility Act refers to the Small Business Act, which in turn allows the U.S. Small Business Administration (SBA) Administrator to specify detailed definitions or standards (5 U.S.C. 601(3) and 15 U.S.C. 632(a)). The SBA regulations at 13 CFR 121.105 discuss who is a small business: “(a)(1) Except for small agricultural cooperatives, a business concern eligible for assistance from SBA as a small business is a business entity organized for profit, with a place of business located in the United States, and which operates primarily within the United States or which makes a significant contribution to the U.S. economy through payment of taxes or use of American products, materials or labor.

    V. Paperwork Reduction Act

    The rule contains information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35); however, these changes to the DFARS do not impose additional information Start Printed Page 22042collection requirements to the paperwork burden previously approved under OMB Control Number 0704-0229, entitled Defense Federal Acquisition Regulation Supplement (DFARS); Part 225, Foreign Acquisition.

    Start List of Subjects

    List of Subjects in 48 CFR Part 252

    • Government procurement
    End List of Subjects Start Signature

    Manuel Quinones,

    Editor, Defense Acquisition Regulations System.

    End Signature

    Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending 48 CFR part 252, which was published at 78 FR 76993 on December 20, 2013, is adopted as a final rule without change.

    End Supplemental Information

    [FR Doc. 2014-08859 Filed 4-18-14; 8:45 am]

    BILLING CODE 5001-06-P

Document Information

Effective Date:
4/21/2014
Published:
04/21/2014
Department:
Defense Acquisition Regulations System
Entry Type:
Rule
Action:
Final rule.
Document Number:
2014-08859
Dates:
Effective April 21, 2014.
Pages:
22041-22042 (2 pages)
RINs:
0750-AI18
Topics:
Government procurement
PDF File:
2014-08859.pdf
CFR: (1)
48 CFR 252