[Federal Register Volume 59, Number 78 (Friday, April 22, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-9819]
[[Page Unknown]]
[Federal Register: April 22, 1994]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
(ER-FRL-4710-6)
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared April 04, 1994 Through April
08, 1994 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(C) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities AT (202)
260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 08, 1994 (59
FR 16807).
Draft EISs
ERP No. D-AFS-L65224-OR Rating EC2, Newberry Geothermal Pilot
Project, Construction and Operation of a 33-megawatt Power Plant,
Approvals, Deschutes National Forest, Fort Rock Ranger District,
Deschutes County, OR.
Summary: EPA had environmental concerns based on the need for the
``additional mitigation measures'' to fully protect groundwater,
surface water, and air quality. EPA had requested additional
information about how future decisions will be made for well pad
siting, power plant siting, and the need for additional mitigation
measures once the chemical characteristics of the geothermal fluids are
identified.
ERP No. D-BPA-L08051-OR Rating EC2, Coyote Springs Cogeneration
Project, General Transmission Agreement Revision for Construction and
Operations of the Coyote Springs Interconnection, Implementation,
Morrow County, OR.
Summary: EPA expressed environmental concerns regarding the
alternative analysis, wetland, water quality and project monitoring.
EPA requested that these issues be addressed in the final document.
ERP No. D-GSA-K80033-CA Rating EC2, Sacramento Federal Building -
United States Courthouse, Site Selection and Construction within a
portion of the Central Business District, City of Sacramento,
Sacramento County, CA.
Summary: EPA expressed environmental concerns because the DEIS
contained insufficient information regarding the existence and cleanup
of hazardous materials and toxic substances at the site and because
there is little discussion of pollution prevention and energy
conservation measures.
Final EISs
ERP No. F-FAA-K51015-CA Lindbergh Field Facilities Improvements,
San Diego International Airport, Plan Approval, San Diego County, CA.
Summary: EPA asked that the EIS Record of Decision contain further
discussion and/or mitigation measures for emissions of hazardous air
pollutants, oxides of nitrogen and carbon monoxide, as well as
recognize that water quality mitigation measures are required under
various programs such as stormwater permitting.
ERP No. F-HUD-K80032-CA Martin Luther King, Jr. Plaza Development
on the former Marritt College and University High School Site, Funding
and Implementation, City of Oakland, Alameda County, CA.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-NOA-K64013-HI Pelagic Fisheries of the Western Pacific
Region, Amendment 7 to the Fishery Management Plan, Implementation,
Exclusive Economic Zone, (EEZ), HI.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-USN-K11100-CA San Diego Bay Programmatic Project,
Implementation, Disposal of Dredged Material, San Diego County, CA.
Summary: EPA expressed environmental concerns regarding mitigation
and the lack of commitment to require future site specific
environmental documentation. EPA requested that these issues be
addressed in the record of decision.
ERP No. FS-AFS-L65099-ID Cuddy Mountain Roadless Area, Grade/Dukes
Timber Sale and Road Construction, New Information concerning
Additional Modifications to the Blend Alternative, Implementation,
Payette National Forest, Washington and Adams Counties, ID.
Summary: EPA expressed environmental concerns regarding the water
quality conditions in Grade and Duke Creeks.
Dated: April 19, 1994
Marshall Cain,
Senior Legal Advisor Office of Federal Activities.
[FR Doc. 94-9819 Filed 4-21-94; 8:45 am]
BILLING CODE 6560-50-U