[Federal Register Volume 61, Number 78 (Monday, April 22, 1996)]
[Notices]
[Pages 17694-17696]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-9814]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. EC96-16-000, et al.]
MidAmerica Energy Company, et al.; Electric Rate and Corporate
Regulation Filings
April 16, 1996.
Take notice that the following filings have been made with the
Commission:
1. MidAmerican Energy Company
[Docket No. EC96-16-000]
Take notice that on April 12, 1996, MidAmerican Energy Company
tendered for filing a Supplement to Exhibit G to the Application for
Order Authorizing Corporate Reorganization filed in the above-
referenced docket on March 29, 1996.
Comment date: May 6, 1996, in accordance with Standard Paragraph E
at the end of this notice.
2. Newgulf Power Venture, Inc.
[Docket No. EG96-55-000]
On April 11, 1996, Newgulf Power Venture, Inc. (Applicant), 1616
Woodall Rodgers Freeway, Dallas, Texas 75202, filed with the Federal
Energy Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
regulations.
Applicant is a wholly owned subsidiary of CSW Energy, Inc., which
is a wholly owned subsidiary of Central and South West Corporation, a
registered holding company. Applicant intends, directly or indirectly,
to own and operate all or part of eligible facilities including,
without limitation, an 85 MW electric generating facility located in or
near Wharton County, Texas.
Comment date: May 7, 1996, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
3. Montaup Electric Company
[Docket No. ER94-1062-004]
Take notice that on April 12, 1996, Montaup Electric Company
tendered for filing its refund report in the above-referenced docket.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
4. Public Service Electric and Gas Company
[Docket Nos. ER95-1286-001, ER95-1287-000, ER95-1288-000, ER95-1289-
000, ER95-1290-000 and EL96-6-000]
Take notice that on April 5, 1996, Public Service Electric and Gas
Company tendered for filing a
[[Page 17695]]
compliance report applicable to the offer of settlement between the
Boroughs of Milltown, South River, and Park Ridge, New Jersey; Jersey
Central Power & Light Company; and Atlantic City Electric Company in
Docket Nos. ER95-1286-000, ER95-1287-000, ER95-1288-000, ER95-1290-000
and EL96-6-000.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
5. New England Power Company
[Docket No. ER96-1004-001]
Take notice that on April 12, 1996, New England Power Company
tendered for filing its refund report in the above-referenced docket.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
6. New England Ventures, Inc.
[Docket No. ER96-1387-000]
Take notice that on April 11, 1996, New England Ventures, Inc.
tendered for filing an amendment to its March 25, 1996 filing filed in
this docket.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
7. Wisconsin Public Service Corporation
[Docket No. ER96-1435-000]
Take notice that on March 26, 1996, Wisconsin Pubic Service
Corporation (WPSC) tendered for filing an executed Transmission Service
Agreement between WPSC and Noram Energy Services. The Agreement
provides for transmission service under the Comparable Transmission
Service Tariff, FERC Original Volume No. 7.
WPSC requests that the agreement become effective retroactively to
March 11, 1996.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
8. Wisconsin Electric Power Company
[Docket No. ER96-1513-000]
Take notice that on April 5, 1996, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing an Electric Service Agreement
and a Transmission Service Agreement between itself and Sonat Power
Marketing, Inc. (Sonat). The Electric Service Agreement provides for
service under Wisconsin Electric's Coordination Sales Tariff. The
Transmission Service Agreement allows Sonat to receive transmission
service under Wisconsin Electric's FERC Electric Tariff, Original
Volume No. 5, Rate Schedule STNF, under Docket No. ER95-1474.
Wisconsin Electric requests an effective date of sixty days from
date of filing. Copies of the filing have been served on Sonat, the
Public Service Commission of Wisconsin and the Michigan Public Service
Commission.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
9. Green Mountain Power Corporation
[Docket No. ER96-1514-000]
Take notice that on April 5, 1996, Green Mountain Power Corporation
(GMP), tendered for filing a Service Agreement for sales of capacity
and energy under its FERC Electric Tariff, Original Volume No. 2
(Opportunity Transmission Tariff) to Vermont Electric Cooperative, Inc.
GMP has requested waiver of the notice requirements of the Commission's
regulations in order to permit the Service Agreement to be made
effective as of April 1, 1996.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
10. Kentucky Utilities Company
[Docket No. ER96-1515-000]
Take notice that on April 8, 1996, Kentucky Utilities Company (KU),
tendered for filing service agreements between KU and Commonwealth
Edison Company, and KU and Florida Power Corporation under its TS
Tariff. KU requests effective dates of March 6, 1996 and March 15,
1996, respectfully, for these two Agreements.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
11. SEMCOR, Inc.
[Docket No. ER96-1516-000]
Take notice that on April 8, 1996, SEMCOR, Inc. (SEMCOR), tendered
for filing an application for waivers and blanket approvals under
various regulations of the Commission and for an order accepting its
FERC Electric Rate Schedule No. 1 to be effective on the date of the
Commission's order accepting the Rate Schedule for filing.
SEMCOR intends to engage in electric power and energy transactions
as a marketer. In these transactions, SEMCOR proposes to charge market-
determined rates, mutually agreed upon by the parties. All sales and
purchases will be arms-length transactions.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
12. Southern Company Services, Inc.
[Docket No. ER96-1517-000]
Take notice that on April 8, 1996, Southern Company Services, Inc.
(SCS), acting on behalf of Alabama Power Company, Georgia Power
Company, Gulf Power Company, Mississippi Power Company, and Savannah
Electric and Power Company (collectively referred to as Southern
Companies) filed six (6) service agreements between SCS, as agent of
the Southern Companies, and (i) Federal Energy Sales, Inc., (ii)
Entergy Power, Inc. (iii) Entergy Power Marketing Corporation, (iv)
Jacksonville Electric Authority, (v) Utilicorp United, Inc., and (vi)
Eastex Power Marketing, Inc. for non-firm transmission service under
the Point-to-Point Transmission Service Tariff of Southern Companies.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
13. Wisconsin Electric Power Company
[Docket No. ER96-1518-000]
Take notice that on April 8, 1996, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing a transmission service
agreement between itself and Upper Peninsula Power Company (UPPCO). The
agreement provides for 2 MW of firm point-to-point transmission service
to be rendered from Wisconsin Power and Light Company (WP&L) to UPPCO's
isolated Iron River Michigan service area for the six months ending
September 30, 1996.
Wisconsin Electric respectfully requests waiver of the Commission's
advance notice requirements in order to permit an effective date of
April 1, 1996, in order to comply with UPPCO's March 12, 1996 requests
for service. Wisconsin Electric is authorized to state that UPPCO joins
in the requested effective date.
Copies of the filing have been served on UPPCO, WP&L, the Michigan
Public Service Commission, and the Public Service Commission of
Wisconsin.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
14. Louisville Gas and Electric Company
[Docket No. ER96-1519-000]
Take notice that on April 8, 1996, Louisville Gas and Electric
Company, tendered for filing copies of a service agreement between
Louisville Gas and Electric Company and Enron Power Marketing, Inc.
under Rate GSS.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
[[Page 17696]]
15. Wisconsin Power and Light Company
[Docket No. ER96-1520-000]
Take notice that on April 8, 1996, Wisconsin Power and Light
Company (WP&L), tendered for filing an Agreement dated April 2, 1996,
establishing Engelhard Power Marketing, Inc. as a customer under the
terms of WP&L's Point-to-Point Transmission Tariff.
WP&L requests an effective date of April 2, 1996 and accordingly
seeks waiver of the Commission's notice requirements. A copy of this
filing has been served upon the Public Service Commission of Wisconsin.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
16. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER96-1521-000]
Take notice that on April 8, 1996, GPU Service Corporation (GPU),
on behalf of Jersey Central Power & Light company, Metropolitan Edison
Company and Pennsylvania Electric Company (jointly referred to as the
GPU Companies), filed a Service Agreement between GPU and Morgan
Stanley Capital Group, Inc. (MSCG) dated. This Service Agreement
specifies that MSCG has agreed to the rates, terms and conditions of
the GPU Companies' Energy Transmission Service Tariff accepted by the
Commission on September 28, 1995 in Docket No. ER95-791-000 and
designated as FERC Electric Tariff, Original Volume No. 3.
GPU requests a waiver of the Commission's notice requirements for
good causes shown and an effective date of April 2, 1996 for the
Service Agreement. GPU has served copies of the filing on regulatory
agencies in New Jersey and Pennsylvania and on MSCG.
Comment date: April 30, 1996, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 96-9814 Filed 4-19-96; 8:45 am]
BILLING CODE 6717-01-P