2015-09221. Gulf South Pipeline Company, LP; Notice of Request Under Blanket Authorization  

  • Start Preamble

    Take notice that on April 3, 2015, Gulf South Pipeline Company, LP (Gulf South) filed in Docket No. CP15-152-000, a Prior Notice request pursuant to section 157.205 of the Commission's Regulations under the Natural Gas Act (NGA), and Gulf South's blanket certificate issued in Docket No. CP82-430-000. Gulf South seeks authorization to increase its maximum storage capacity in the Petal Salt Dome Cavern 12A, located in Forest County in the State of Mississippi, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Specifically, Gulf South proposes to increase the total certificated storage capacity of the cavern from 9.26 Billion cubic feet (Bcf) to 9.75 Bcf. Gulf South proposes the increase because the cavern size was determined to be slightly larger than originally anticipated based upon temperature survey data obtained after cavern dewatering operations were completed. No construction of facilities is required for the proposal.

    Any questions regarding this application should be directed to Kyle Stephens, Vice President, Regulatory Affairs, Gulf South Pipeline Company, LP, 9 Greenway Plaza, Suite 2800, Houston, TX 77046 by telephone at (713) 479-8033, by FAX at (713) 479-1745 or by email at kyle.stephens@bwpmlp.com.

    Any person or the Commission's Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission's Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

    Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such motions or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    The Commission encourages electronic submission of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    This filing is accessible on-line at http://www.ferc.gov, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Start Signature

    Dated: April 15, 2015.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2015-09221 Filed 4-21-15; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/22/2015
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2015-09221
Pages:
22510-22510 (1 pages)
Docket Numbers:
Docket No. CP15-152-000
PDF File:
2015-09221.pdf