Start Preamble
AGENCY:
Office of Electricity, Department of Energy.
ACTION:
Revocation of prohibition order.
SUMMARY:
The U.S. Department of Energy (DOE or Department) gives notice that the Prohibition Order Securing Critical Defense Facilities, dated December 17, 2020 (December 2020 Prohibition Order), is revoked.
DATES:
The effective date of the revocation of the December 2020 Prohibition Order is April 20, 2021.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Patricia A. Hoffman, Acting Assistant Secretary, Office of Electricity, U.S. Department of Energy, Mailstop OE-20, Room 8G-042, 1000 Independence Avenue SW, Washington, DC 20585; (202) 586-1411, or electricsystemEO@hq.doe.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Nation's energy infrastructure supports our national defense, critical infrastructure, economy, and way of life. Adversarial nation-state actors are targeting our critical infrastructure, with increasing focus on the energy sector. The Department is engaged in partnership with the electricity subsector and other Federal agencies, in a comprehensive set of actions to strengthen supply chain risk management and recognizes the threat our foreign adversaries pose to our critical infrastructure.
In order to build on the work the Department has already completed in securing the electric system, the Department is developing recommendations to strengthen requirements and capabilities for supply chain risk management practices by the Nation's electric utilities. These recommendations are intended to enable an approach that builds on, clarifies, and, where appropriate, modifies prior executive and agency actions.Start Printed Page 21309
Executive Order 13920, Securing the United States Bulk-Power System, (E.O. 13920),[1] issued on May 1, 2020, declared an emergency that authorized the Secretary of Energy (Secretary) to, among other actions, prohibit the acquisition, transfer, or installation of certain BPS electric equipment sourced from foreign adversary countries for one year.[2] On December 17, 2020, the Secretary issued the December 2020 Prohibition Order, which took effect January 16, 2021, invoking the authority of E.O. 13920.[3] Pursuant to the December 2020 Prohibition Order, a limited number of utilities [4] were prohibited from acquiring, importing, transferring, or installing certain BPS electric equipment.[5] That order targeted select equipment manufactured or supplied by persons owned by, controlled by, or subject to the jurisdiction or direction of the People's Republic of China.[6]
On January 20, 2021, Executive Order 13990, Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis (E.O. 13990), was issued, which suspended E.O. 13920 for 90 days and directed the Secretary of Energy and the Director of the Office of Management and Budget jointly to “consider whether to recommend that a replacement order be issued.” [7] As the December 2020 Prohibition Order is predicated on the authorities delegated to DOE by E.O. 13920, the December 2020 Prohibition Order was also suspended during the same time period.
The Department is revoking the December 2020 Prohibition Order effective April 20, 2021, in order to create a stable policy environment before the emergency declaration made by E.O. 13920 expires on May 1, 2021, and while the Department conducts a Request for Information to develop a strengthened and administrable strategy to address the security of the U.S. energy sector.
Signing Authority
This document of the Department of Energy was signed on April 19, 2021, by Jennifer Granholm, Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register.
Start SignatureSigned in Washington, DC, on April 20, 2021.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
Footnotes
1. Executive Order 13920, Securing the United States Bulk-Power System: Request for Information, 85 FR 26595 (May 4, 2020).
Back to Citation2. Id. at 26595-26596.
Back to Citation3. Prohibition Order Securing Critical Defense Facilities, 86 FR 533 (Jan. 6, 2021).
Back to Citation4. The December 2020 Prohibition Order defined “Responsible Utility” as “an electric utility that owns or operates Defense Critical Electric Infrastructure (DCEI), as defined by section 215A(a)(4) of the Federal Power Act (FPA), that actively serves a CDF, as designated by the Secretary under section 215A(c) of the FPA.” Id. at 534.
Back to Citation5. Id.
Back to Citation6. Id.
Back to Citation7. Executive Order 13990, Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis, § 7(c), 86 FR 7037, 7042 (Jan. 25, 2021).
Back to Citation[FR Doc. 2021-08483 Filed 4-21-21; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Effective Date:
- 4/20/2021
- Published:
- 04/22/2021
- Department:
- Energy Department
- Entry Type:
- Notice
- Action:
- Revocation of prohibition order.
- Document Number:
- 2021-08483
- Dates:
- The effective date of the revocation of the December 2020 Prohibition Order is April 20, 2021.
- Pages:
- 21308-21309 (2 pages)
- PDF File:
- 2021-08483.pdf
- Supporting Documents:
- » Meetings: Environmental Management Site-Specific Advisory Board, Northern New Mexico
- » Presidential Permit Application: Versant Power
- » Presidential Permit Application: Versant Power
- » Meetings: Environmental Management Site-Specific Advisory Board, Northern New Mexico
- » Meetings: Environmental Management Site-Specific Advisory Board, Paducah
- » Environmental Impact Statements; Availability, etc.: Long Term Management and Storage of Elemental Mercury
- » Meetings: Environmental Management Site-Specific Advisory Board, Oak Ridge
- » Application to Amend Presidential Permit: CHPE LLC
- » Meetings: Electricity Advisory Committee
- » Revocation of Prohibition Order Securing Critical Defense Facilities