99-10144. Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests  

  • [Federal Register Volume 64, Number 78 (Friday, April 23, 1999)]
    [Notices]
    [Pages 19995-19996]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-10144]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Soliciting Motions 
    To Intervene and Protests
    
    April 16, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Preliminary Permit.
        b. Project No.: P-11713-000.
        c. Date Filed: March 26, 1999.
        d. Applicant: Universal Electric Power Corporation.
        e. Name of Project: La Grange L&D.
        f. Location: On the Illinois River, near the town of Meredosia, 
    Cass County,
    
    [[Page 19996]]
    
    Illinois, utilizing federal lands administered by the U.S. Army Corps 
    of Engineers.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Ronald S. Feltenberger, Universal 
    Electric Power Corp., 1145 Highbrook Street, Akron, OH 44301, (330) 
    535-7115.
        i. FERC Contact: Any questions on this notice should be addressed 
    to Charles T. Raabe, E-mail address, Charles.Raabe@ferc.fed.us, or 
    telephone (202) 219-2811.
        j. Deadline Date: 60 days from the issuance date of this notice.
        k. Description of Project: The proposed project would utilize the 
    existing U.S. Army Corps of Engineers' La Grange Lock and Dam and would 
    consist of: (1) five new 50-foot-long, 84-inch-diameter steel 
    penstocks; (2) a new 80-foot-long, 30-foot-wide, 30-foot-high 
    submersible powerhouse containing five generating units have a total 
    installed capacity of 9,100-kW; (3) a new exhaust apron; (4) a new 100-
    foot-long, 14.7-kV transmission line; and (5) appurtenant facilities.
        Applicant estimates that the average annual generation would be 56 
    GWh and that the cost of the studies to be performed under the terms of 
    the permit would be $1,750,000. Project energy would be sold to utility 
    companies, corporations, municipalities, aggregators, or similar 
    entities.
        l. Locations of the application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Washington, DC 20426, 
    or by calling (202) 208-1371. This filing may be viewed on the web at 
    http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for 
    assistance). A copy is also available for inspection and reproduction a 
    the address in item h above.
        Preliminary Permit--Anyone desiring to file a competing application 
    for preliminary permit for a proposed project must submit the competing 
    application itself, or a notice of intent to file such an application, 
    to the Commission on or before the specified comment date for the 
    particular application (see 18 CFR 4.36). Submission of a timely notice 
    of intent allows an interested person to file the competing preliminary 
    permit application no later than 30 days after the specified comment 
    date for the particular application. A competing preliminary permit 
    application must conform with 18 CFR 4.30(b) and 4.36.
        Preliminary Permit--Any qualified development applicant desiring to 
    file a competing development application must submit to the Commission, 
    on or before a specified comment date for the particular application, 
    either a competing development application or a notice of intent to 
    file such an application. Submission of a timely notice of intent to 
    file a development application allows an interested person to file the 
    competing application no later than 120 days after the specified 
    comment date for the particular application. A competing license 
    application must conform with 18 CFR 4.30(b) and 4.36.
        Notice of intent--A notice of intent must specify the exact name, 
    business address, and telephone number of the prospective applicant, 
    and must include an unequivocal statement of intent to submit, if such 
    an application may be filed, either a preliminary permit application or 
    a development application (specify which type of application). A notice 
    of intent must be served on the applicant(s) named in this public 
    notice.
        Proposed Scope of Studies under Permit--A preliminary permit, if 
    issued, does not authorize construction. The term of the proposed 
    preliminary permit would be 36 months. The work proposed under the 
    preliminary permit would include economic analysis, preparation of 
    preliminary engineering plans, and a study of environmental impacts. 
    Based on the results of these studies, the Applicant would decide 
    whether to proceed with the preparation of a development application to 
    construct and operate the project.
        Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.10, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        Filing and Service of Responsive Documents--Any filings must bear 
    in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO 
    FILE COMPETING APPLICATION,'' ``COMPETING APPLICATION'', ``PROTEST'', 
    ``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
    particular application to which the filing refers. Any of the above-
    named documents must be filed by providing the original and the number 
    of copies provided by the Commission's regulations to: The Secretary, 
    Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, DC 20426. An additional copy must be sent to Director, 
    Division of Project Review, Federal Energy Regulatory Commission, at 
    the above-mentioned address. A copy of any notice of intent, competing 
    application or motion to intervene must also be served upon each 
    representative of the Applicant specified in the particular 
    application.
        Agency Comments--Federal state, local agencies are invited to file 
    comments on the described application. A copy of the application may be 
    obtained by agencies directly from the Applicant. If an agency does not 
    file comments within the time specified for filing comments, it will be 
    presumed to have no comments. One copy of an agency's comments must 
    also be sent to the Applicant's representatives.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-10144 Filed 4-22-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
04/23/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-10144
Dates:
60 days from the issuance date of this notice.
Pages:
19995-19996 (2 pages)
PDF File:
99-10144.pdf