99-10219. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 64, Number 78 (Friday, April 23, 1999)]
[Notices]
[Page 19986]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-10219]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-302-000]
Koch Gateway Pipeline Company; Notice of Request Under Blanket
Authorization
April 19, 1999.
Take notice that on April 13, 1998, Koch Gateway Pipeline Company
(Koch), P.O. Box 1478, Houston, Texas 77251-1478, filed under Sections
157.205 and 157.211(a) of the Commission's Regulations under the
Natural Gas Act to construct, own and operate a 16-inch tap, ultrasonic
meter station and regulation equipment \1\ to enable Koch to transport
gas on a firm basis for Southern Company Service, Inc. (SCS), to
Mississippi Power Company's Jack Watson Power Plant. Construction of
these facilities will allow Koch to make average day deliveries under
its Rate Schedule FTS to the Jack Watson Power Plant, totaling 20,000
MMBtu. Koch will transport these volumes under its blanket certificate
issued in Docket No. CP88-6-000. This docket is on file with the
Commission and open to public inspection. The application may also be
viewed on the web at www.ferc.fed.us. Call (202) 208-2222 for
assistance.
---------------------------------------------------------------------------
\1\ Facilities for this project also include 5,200 feet of 16-
inch line, which Koch plans to construct under Section 157.208(a) of
the Commission's Regulations.
---------------------------------------------------------------------------
Any person or the Commission's staff may, within 45 days after
insurance of the instant notice by the Commission, file pursuant to
Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion
to intervene or notice of intervention and pursuant to Section 157.205
of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authroization pursuant to Section 7 of the Natural
Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 99-10219 Filed 4-22-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 04/23/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-10219
- Pages:
- 19986-19986 (1 pages)
- Docket Numbers:
- Docket No. CP99-302-000
- PDF File:
-
99-10219.pdf