99-10284. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 64, Number 78 (Friday, April 23, 1999)]
    [Notices]
    [Pages 19999-20000]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-10284]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6241-9]
    
    
    Environmental Impact Statements; Notice of Availability
    
    RESPONSIBLE AGENCY: Office of Federal Activities, General Information 
    (202) 564-7167 OR (202) 564-7153.
        Weekly receipt of Environmental Impact Statements Filed April 12, 
    1999 Through April 16, 1999 Pursuant to 40 CFR 1506.9.
    
    EIS No. 990121, Draft EIS, COE, FL, Alligator Chain of Lakes and Lake 
    Gentry Extreme Drawdown and Habitat Enhancement Project, Implement 
    Aquatic Habitat Enhancement, Osceola County, FL, Due: June 10, 1999, 
    Contact: Christine Bauer (904) 232-3271.
    EIS No. 990122, Draft EIS, GSA, TN, Volunteer Army Ammunition Plant, 
    Disposal and Transfer Ownership of Property to Other Federal Agencies 
    and Private Entities, City of Chattanooga's, Hamilton County, TN, Due: 
    June 08, 1999, Contact: Phil Youngberg (404) 331-1831.
    EIS No. 990123, Draft EIS, COE, IL, Hunter Lake New Supplemental Water 
    Supply Reservoir, Construction, City of Springfield Application for 
    Permit, Sangamon County, IL, Due: June 07, 1999, Contact: Charlene 
    Carmack (309) 794-5570.
    EIS No. 990124, Final EIS, DOE, TN, NY, IL, NM, Spallation Neutron 
    Source (SNS) Facility Construction and Operation, Implementation and 
    Site Selection, Oak Ridge National Laboratory, Oak Ridge, TN; Argonne 
    National Laboratory, Argonne, IL; Brookhaven National Laboratory, 
    Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM, Due: May 
    24, 1999, Contact: David Wilfert (800) 927-9964.
    EIS No. 990125, Final EIS, FHW, WA, WA-167 Corridor Adoption, WA-167 
    Freeway Extension from WA-167/Meridian Street North in the City of 
    Puyallup to the proposed WA-509 Freeway/East-West Alignment in the City 
    of Tacoma, Funding and COE Section 404 Permit, Pierce County, WA, Due: 
    May 24, 1999, Contact: Jeff Sawyer (360) 357-2713.
    EIS No. 990126, Draft EIS, AFS, MT, North Belts Travel Plan/Maypie 
    Confederate Vegetation Restoration Project, Improvements, Helena 
    National Forest, Townsend and Helena Ranger District, Broadwater, Lewis 
    and Clark and Meagher County, MT, Due: June 07, 1999, Contact: Carol 
    Nunn (406) 266-3425.
    
        The US Department of Agriculture, Forest Service and the US 
    Department of the Interior, Bureau of Land Management are Joint Lead 
    Agencies on the above project.
    
    EIS No. 990127, Final EIS, DOE, CA, Sutter Power Plant Project, 
    Operation and Maintenance of a High-Voltage Electric Transmission, 500 
    megawatt (MW) Gas Fueled, Sutter County, CA, Due: May 24, 1999, contact 
    Loreen McMahon (916) 353-4460.
    EIS No. 990128, Draft EIS, FRC, PA, NJ, NY, Millennium Pipeline 
    Project, Construct and Operate an Interstate Natural Gas Pipeline from 
    United States to Canada, including PA, NY and NJ, Due: June 07, 1999, 
    Contact: Paul McKee (202) 208-1611.
    EIS No. 990129, Draft EIS, FRC, MA, Holyoke Hydroeletric Relicensing 
    Project, (FERC Nos. 2004-073 and 11607-000), Construction, Operation 
    and Maintenance, Located on the Connecticut River, Hampshire, Hampden 
    and Franklin Counties, MA, Due: June 07, 1999, Contact: Allan E. 
    Creamer (202) 219-0365.
    EIS No. 990130, Revised Draft EIS, DOE, WA, Hanford Remedial Action, 
    Revised and New Alternatives, Comprehensive Land-Use Plan, Hanford Site 
    lies within the Pasco Basin of the Columbia Plateau, WA, Due: June 07, 
    1999, Contact: Thomas W. Ferns (509) 372-0649.
    EIS No. 990131, Final EIS, NCP, MD, National Harbor Project, 
    Construction and Operation along the Potomac River on a 534 acre site 
    adjacent to the Capital Beltway and Oxon Hill Manor, COE Section 10 and 
    404 Permits, Prince George's County, MD, Due: May 24, 1999, Contact: 
    Eugene Keller (202) 482-7251.
    EIS No. 990132, Final EIS, DOE, KY, TN, OH, TN, Programmatic EIS--
    Alternative Strategies for the Long-Term Management and Use of Depleted 
    Uranium Hexafluoride, Paducah Site, McCracken County, KY; Portsmouth 
    Site, Pike County, OH; and K-25 Site on the Oak Ridge Reservation, 
    Anderson and Roane Counties, TN, Due: May 24, 1999, Contact: Scott E. 
    Harlow (301) 903-3352.
    EIS No. 990133, Draft EIS, FRC, IL, MI, PA, IN, OH, NJ, Independence 
    Pipeline and Market Link Expansion Projects, Construction and 
    Operation, Interstate National Gas Pipeline, (Docket Nos. CP97-315-001, 
    CP97-319-000, CP98-200-000 and CP98-540-000), NPDES and COE Section 404 
    Permits, IL, IN, MI, OH, PA and NJ, Due: June 07, 1999, Contact: Paul 
    McKee (202) 208-1611.
    
    [[Page 20000]]
    
    Amended Notices
    
    EIS No. 990107, Final EIS, FRC, MI, IN, IL, IN, Vector Pipeline 
    Project, Natural Gas Pipeline and Associated above ground Facilities 
    Construction and Operation, Approval, Joliet, IL to Vector Canada at 
    the International Border near St. Clair, MI, several counties, MI, IN, 
    and IL , Due: May 10, 1999, Contact: Paul McKee (202) 208-1611.
    Published FR 04-09-99 Correction to Telephone Number.
    
        Dated: April 20, 1999.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 99-10284 Filed 4-22-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
04/23/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-10284
Pages:
19999-20000 (2 pages)
Docket Numbers:
ER-FRL-6241-9
PDF File:
99-10284.pdf