2012-9659. Commission Information Collection Activities (FERC-725); Comment Request; Extension  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission, DOE.

    ACTION:

    Notice of information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards.

    DATES:

    Comments on the collection of information are due June 22, 2012.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC12-11-000) by either of the following methods:

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: FERC-725 and Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards.

    OMB Control No.: 1902-0225.

    Type of Request: Three-year extension of the FERC-725 information collection requirements with no changes to the current reporting requirements. However, FERC is making adjustments to the burden estimates based on current information.

    Abstract: The Commission uses the information collected under the requirements of FERC-725 [1] to implement the statutory provisions of Section 215 of the Federal Power Act (FPA).[2]

    Section 215 of the FPA aids the Commission's efforts to strengthen the reliability of the interstate grid through the granting of new authority to provide for a system of mandatory Reliability Standards developed by the Electric Reliability Organization (ERO) and reviewed and approved by FERC.

    On February 3, 2006, the Commission issued Order No.672 [3] certifying a single ERO [the North American Electric Reliability Corporation (NERC)], to oversee the reliability of the United States' portion of the interconnected North American Bulk-Power System, subject to Commission oversight. The ERO is responsible for developing and enforcing the mandatory Reliability Standards. The Reliability Standards apply to all users, owners and operators of the Bulk-Power System. The Commission has the authority to approve all ERO actions, to order the ERO to carry out its responsibilities under these statutory provisions, and (as appropriate) to enforce Reliability Standards.

    The ERO can delegate its enforcement responsibilities to a Regional Entity. Delegation is effective only after the Commission approves the delegation agreement. A Regional Entity can also propose a Reliability Standard to the ERO for submission to the Commission for approval.

    The FERC-725 contains the following information collection elements:

    Self Assessment and ERO Application: The Commission requires the ERO to submit to FERC a performance assessment report every five years. Each of regional entity submits a performance assessment report to the ERO. Submitting an application to become an ERO is also part of this collection.[4]

    Reliability Assessments: 18 CFR 39.11 requires the ERO to assess the reliability and adequacy of the Bulk-Power System in North America. Subsequently, the ERO must report to the Commission on its findings. Regional entities perform similar assessments within individual regions.

    Reliability Compliance: Reliability Standards are mandatory and enforceable. In addition to the specific information collection requirements contained in each standard, there are general compliance, monitoring and enforcement information collection requirements imposed on applicable entities. Audits, spot checks, self-certifications, exception data submittals, violation reporting, and mitigation plan confirmation are included in this area.

    Stakeholder Survey: The ERO used a stakeholder survey to solicit feedback from registered entities in preparation for its three year performance assessment. The Commission assumes that the ERO will perform another survey prior to the 2014 performance assessment.

    Other Reporting: This category refers to all other reporting requirements imposed on the ERO or regional entities in order to comply with the Commission's regulations.

    The Commission implements its responsibilities through the Code of Federal Regulations in 18 CFR part 39.

    Type of Respondents: Electric reliability organization, regional entities, and registered entities.Start Printed Page 24190

    Estimate of Annual Burden[5] : The Commission estimates the total public reporting burden for this information collection as:

    FERC-725—Certification of the ERO 4; Procedures for Electric Reliability Standards

    Type of respondentType of reporting requirement 4Number of respondentsNumber of responses per respondentTotal number of responsesAverage burden hours per responseEstimated total annual burden
    (A)(B) 6(A) × (B) = (C)(D)(C) × (D)
    Electric Reliability Organization (ERO)Self-Assessment0.330.3310,4003,432
    Reliability Assessments11113,12034,320
    Reliability Compliance1176,83776,837
    Standards Development1151,83451,834
    Other Reporting1112,0802,080
    Regional EntitiesSelf-Assessment0.332.6416,64043,930
    Reliability Assessments1816,679133,432
    Reliability Compliance1846,788374,304
    Standards Development18* 4,14233,134
    Other Reporting8181,0408,320
    Registered EntitiesStakeholder Survey0.3353742,148
    Reliability Compliance1,62711,627* 483786,342
    Subtotals:
    ERO168,503
    Regional7 N/A593,120
    Registered788,490
    Total1,6367 N/A7 N/A7 N/A1,550,113
    * (Rounded)

    The Commission derived the figures above using NERC's Business Plan and Budget Submissions, NERC's Compliance, Enforcement and Monitoring Plans, NERC's Performance Assessments, other information on NERC's Web site (http://www.nerc.com/​), and internal FERC staff estimates. See the appendix for more details regarding the burden estimates.[8]

    The total estimated annual cost burden to respondents is $115,655,020 ($15,128,199 + $46,121,011 + $54,405,810).

    ERO Cost: 168,503 hours @ $89.78/hr = $15,128,199.

    Regional Entity Cost: 593,120 hours @ $77.76/hr = $46,121,011.

    Registered Entity Cost: 788,490 hours @ $69/hr = $54,405,810 .

    The hourly cost figures are loaded (i.e. includes salary and other personnel costs). The Commission used NERC's 2012 Business Plan and internal FERC salary estimates for these cost figures.

    Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: April 16, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    1.  “Electric Reliability Organization” or “ERO” means the organization certified by the Commission the purpose of which is to establish and enforce Reliability Standards for the Bulk-Power System, subject to Commission review.

    Back to Citation

    2.  Section 215 was added by the Energy Policy Act of 2005, Public Law 109-58, 119 Stat. 594 (2005) (codified at 42 U.S.C. 16451, et seq.)

    Back to Citation

    3.  Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards ¶ 31,204 71 FR 8662 (2006) Order on rehearing, 71 FR 19,814 (2006), FERC Statutes and Regulations ¶ 31,212 (2006).

    Back to Citation

    4.  The Commission does not expect any new ERO applications to be submitted in the next three years and is not including any burden for this requirement in the burden estimate.

    Back to Citation

    5.  Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.

    Back to Citation

    6.  In all instances below where the number of responses per respondent is “1” the Commission acknowledges that actual number of responses varies and cannot be estimated clearly.

    Back to Citation

    7.  N/A = not applicable.

    Back to Citation

    8.  The appendix will not be published in the Federal Register. The appendix is available in FERC's eLibrary system under the notice issuance in Docket No. IC12-11-000.

    Back to Citation

    [FR Doc. 2012-9659 Filed 4-20-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/23/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collection and request for comments.
Document Number:
2012-9659
Dates:
Comments on the collection of information are due June 22, 2012.
Pages:
24189-24190 (2 pages)
Docket Numbers:
Docket No. IC12-11-000
PDF File:
2012-9659.pdf