2013-09555. Drawbridge Operation Regulations; Saugatuck River, Westport, CT  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport, Connecticut. The deviation is necessary to facilitate emergency repairs. Under this temporary deviation, the bridge owner requires a 24 hour advance notice for bridge openings through June 1, 2013.

    DATES:

    This deviation is effective from May 4, 2013 through June 1, 2013.

    ADDRESSES:

    The docket for this deviation, [USCG-2013-0244] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140, on the ground floor of the Department of Start Printed Page 23847Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-7165. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Route 136 Bridge has a vertical clearance of 6 feet at mean high water in the closed position. The existing drawbridge operating regulations are found at 33 CFR 117.221(c).

    The bridge owner, Connecticut Department of Transportation, requested a 24 hour advance notice requirement for bridge openings to facilitate emergency repairs to the mechanical and electrical components at the bridge.

    We previously authorized the above request from March 5, 2013 through May 3, 2013; however, an additional 29 days will be necessary in order to finish storm related repairs from Hurricane Sandy last October. The bridge can operate manually in the event of an emergency situation.

    Under this temporary deviation at least a 24 hour advance notice shall be required for bridge openings at the Route 136 Bridge, mile 1.3, across the Saugatuck River at Westport, Connecticut, from May 4, 2013 through June 1, 2013.

    The Saugatuck River is predominantly a recreational waterway. During the time period that this temporary deviation will be in effect the impact on navigation will be minimal.

    In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated repair period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: April 10, 2013.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2013-09555 Filed 4-22-13; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Comments Received:
0 Comments
Effective Date:
5/4/2013
Published:
04/23/2013
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
2013-09555
Dates:
This deviation is effective from May 4, 2013 through June 1, 2013.
Pages:
23846-23847 (2 pages)
Docket Numbers:
USCG-2013-0244
PDF File:
2013-09555.pdf
CFR: (1)
33 CFR 117