2012-9763. Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed Start Printed Page 24484with the Commission and is available for public inspection:

    a. Application Type: Final Land Management Plan.

    b. Project No: 2161-032.

    c. Date Filed: August 1, 2011, and supplemented November 14, 2011.

    d. Applicant: Wausau Paper Mills, LLC.

    e. Name of Project: Rhinelander Hydroelectric Project.

    f. Location: The upper Wisconsin River in Oneida County, Wisconsin.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin 54501-3328; (715) 369-4181.

    i. FERC Contact: Patricia A. Grant, (312) 596-4435; patricia.grant@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests: May 17, 2012.

    All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov/​docs-filing/​efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P-2161-032) on any comments or motions filed.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. Description of Application: Pursuant to the requirements of Article 410 of the license, Wausau Paper Mills, LLC developed and filed a final Land Management Plan (LMP) for the Rhinelander project, utilizing its original LMP, filed June 26, 1998, Volume III, Appendix E.2 of its license application, for finalizing the plan. The proposed final LMP includes provisions regarding buffer zones, protection of wetland areas, land and timber management practices, and public access.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field (P-2161) to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Start Signature

    Dated: April 17, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-9763 Filed 4-23-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
04/24/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-9763
Pages:
24483-24484 (2 pages)
Docket Numbers:
Project No. 2161-032
PDF File:
2012-9763.pdf