94-9835. REA Performance Specification for Line Concentrators  

  • [Federal Register Volume 59, Number 79 (Monday, April 25, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-9835]
    
    
    [[Page Unknown]]
    
    [Federal Register: April 25, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF AGRICULTURE
    
    Rural Electrification Administration
    
    7 CFR Part 1755
    
     
    
    REA Performance Specification for Line Concentrators
    
    AGENCY: Rural Electrification Administration, USDA.
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Rural Electrification Administration proposes to amend its 
    regulation on REA Telecommunications Standards and Specifications for 
    Material, Equipment and Construction by codifying the REA bulletin 
    concerning REA Performance Specification for Line Concentrators, REA 
    form 397g. This specification has been incorporated by reference and 
    will be rescinded after the effective date of the final rule. The 
    specification proposes to update the end product performance 
    requirements brought about through technology advancements since this 
    specification was last issued on July 29, 1985.
    DATES: Written comments must be received by REA or postmarked no later 
    then May 25, 1994.
    ADDRESSES: Written comments should be addressed to the Director of the 
    Telecommunications Standards division, U.S. Department of Agriculture, 
    Rural Electrification Administration, Room 2838-S, Washington, DC 
    20250-1500. REA requires a signed original and three copies of all 
    comments (7 CFR 1700.30(e)). Comments will be available for public 
    inspection during regular business hours (7 CFR 1.27 (b)).
    
    FOR FURTHER INFORMATION CONTACT: Mr. John J. Schell, Chief, Central 
    Office Equipment Branch, Telecommunications Standards Division, U.S. 
    Department of Agriculture, Rural Electrification Administration, room 
    2838-S, Washington, DC 20250-1500. Telephone: (202) 720-0671.
    
    SUPPLEMENTARY INFORMATION:
    
    Executive Order 12866
    
        This proposed rule is issued in conformance with Executive Order 
    12866.
    
    Executive Order 12778
    
        This proposed rule has been reviewed under Executive Order 12778, 
    Civil Justice Reform. If adopted, this proposed rule:
        (1) Will not preempt any state or local laws, regulations, or 
    policies, unless they present an irreconcilable conflict with this 
    rule;
        (2) Will not have any retroactive effect; and
        (3) Will not require administrative proceedings before any parties 
    may file suit challenging the provisions of this rule.
    
    Regulatory Flexibility Act Certification
    
        The Administrator of REA has determined that this proposed rule 
    will not have a significant economic impact on a substantial number of 
    small entities, as defined by the Regulatory Flexibility Act (5 U.S.C. 
    601 et seq.) the REA programs provide and finance grants and loans to 
    REA borrowers at interest rates and terms that are more favorable than 
    those generally available from the private sector. REA borrowers, as a 
    result of obtaining Federal financing, receive economic benefits which 
    ultimately offset any direct economic costs associated with complying 
    with REA regulations and requirements.
    
    Information Collection and Recordkeeping Requirements
    
        In compliance with the Office of Management and Budget (OMB) 
    regulations (5 CFR Part 1320) which implements the Paperwork Reduction 
    Act of 1980 (44 U.S.C. 3501 et seq.) and section 3504 of that Act, 
    information collection and recordkeeping requirements contained in this 
    proposed rule have been approved by OMB under control number 0572-0077. 
    Comments concerning these requirements should be directed to the Office 
    of Information and Regulatory Affairs of OMB, Attention: Desk Officer 
    for USDA, Room 3201, NEOB, Washington, DC 20503.
    
    National Environmental Policy Act Certification
    
        The Administrator of REA has determined that this proposed rule 
    will not significantly affect the quality of the human environment as 
    defined by the National Environmental Policy Act of 1969 (42 U.S.C. 
    4321 et seq.). Therefore, this action does not require an environmental 
    impact statement or assessment.
    
    Catalog of Federal Domestic Assistance
    
        The program described by this proposed rule is listed in the 
    Catalog of Federal Domestic Assistance Programs under number 10.851, 
    Rural Telephone Loans and Loan Guarantees. This catalog is available on 
    a subscription basis from the Superintendent of Documents, the United 
    States Government Printing Office, Washington, DC 20402.
    
    Executive Order 12372
    
        This proposed rule is excluded from the scope of Executive Order 
    12372, Intergovernmental Consultation. A Notice of Final Rule entitled 
    Department Programs and Activities Excluded from Executive Order 12372 
    (50 FR 47034) exempts REA and RTB loans and loan guarantees, and RTB 
    bank loans, to governmental and nongovernmental entities from coverage 
    under this Order;
    
    Background
    
        REA makes loans and loan guarantees to telephone system to provide 
    and improve telecommunications service in rural areas, as authorized by 
    the Rural Electrification Act of 1936, as amended, 7 U.S.C. 901 et 
    seq., (RE Act). REA maintains a system of construction standards and 
    specifications for materials and equipment. In accordance with the REA 
    loan contract, these standards and specifications apply to facilities 
    constructed by REA telephone borrowers.
        Presently, REA Bulletin 345-185, REA Performance Specification for 
    Line Concentrators REA Form 397g, dated July 29, 1985, is incorporated 
    by reference at 7 CFR 1755.97. Because of the many improvements in 
    technology since the specification was last issued, REA believes that 
    by updating and codifying the revised specification, borrowers will be 
    provided with an opportunity to improve and increase subscriber 
    services through enhanced system designs brought about through the 
    technological advancements in an economical and efficient manner.
    
    List of Subjects in 7 CFR Part 1755
    
        Loan Programs--communications, Reporting and recordkeeping 
    requirements, Rural areas, Telephone.
    
        For the reasons set out in the preamble, REA proposes to amend 
    chapter XVII of title 7 of the Code of Federal Regulations as follows:
    
    PART 1755--TELECOMMUNICATIONS STANDARDS AND SPECIFICATIONS FOR 
    MATERIALS, EQUIPMENT AND CONSTRUCTION
    
        1. The authority citation for part 1755 continues to read as 
    follows:
    
        Authority: 7 U.S.C. 901 et seq., 1921 et seq.
    
    
    Sec. 1755.97  [Amended]
    
        2. Section 1755.97 is amended by removing the entry REA Bulletin 
    345-185 from the table.
        3. Section 1755.397 is revised to read as follows:
    
    
    Sec. 1755.397  REA performance specfication for line concentrators.
    
        (a) General. (1) This section covers general requirements for a 
    line concentrator (LC) system. This system shall operate in accordance 
    with the manufacturer's specifications. Reliability shall be of prime 
    importance in the design, manufacture and installation of the 
    equipment. The equipment shall automatically provide for:
        (i) Terminating subscriber lines at a location remote from the 
    serving central office;
        (ii) Concentrating the subscriber lines over a few transmission and 
    supervisory paths to the serving central office; and
        (iii) Terminating the lines at the central office without loss of 
    individual identity. A subscriber connected to a line concentrator 
    shall be capable of having essentially the same services as a 
    subscriber connected directly to the central office equipment (COE). 
    Intra-unit calling among subscribers connected to the concentrator may 
    be provided, but is not required.
        (2) Industry standards, or portions thereof, referred to in this 
    specification are incorporated by reference by REA. This incorporation 
    by reference was approved by the Director of the Federal Register in 
    accordance with 5 U.S.C. 552 (a) and 1 CFR part 51. Copies of these 
    standards are available for inspection during normal business hours at 
    the Office of the Federal Register, 800 North Capitol Street, NW., 
    suite 700, Washington, DC.
    
        [Note: The incorporation by reference and availability of 
    inspection copies are pending approval by the Office of the Federal 
    Register.]
        (3) ANSI standards are available from ANSI Inc., 11 West 42nd 
    Street, 13th floor, New York, NY 10036, Telephone (212) 642-4900.
        (i) ANSI Standards S1.4-1983, Specification for Sound Level Meters.
        (ii) [Reserved]
        (4) ASTM Specification B33-91, Standard Specifications for Tinned 
    Soft or Annealed Copper Wire for Electrical Purposes.
        (5) Bell Communication Research (Bellcore) standards are available 
    from Bellcore Customer Service, 60 New England Avenue, Piscataway, NJ 
    08854, telephone 1-800-521-2673.
        (i) TR-TSY-00008-1987, Digital Interface between the SLC 96 Digital 
    Loop Carrier System and a Local Digital Switch.
        (ii) Bell Communications Research (Bellcore) document TR-TSY-
    000057-1987, Functional Criteria for Digital Loop Carrier Systems Issue 
    1 dated April 1987.
        (iii) Bell Communications Research (Bellcore) Document TR-TSY-
    000303-1986, Integrated Digital Loop Carrier System Generic 
    Requirements, Objectives and Interface, Issue 1 dated September 1986.
        (6) IEEE standards are available from IEEE Service Center, 445 Hoes 
    Lane, P. O. Box 1331, Piscataway, NJ 08854, telephone 1-800-521-2673.
        (i) IEEE Standard #455-1985, Standard Testing Procedure for 
    Measuring Longitudinal Balance of Telephone Equipment Operating in the 
    Voice Band.
        (ii) Federal Standard H28-1978 Screw-Thread Standards for Federal 
    Services.
        (7) REA standards are available from Publications and Directives 
    Management Branch, Administrative Services Division, Rural 
    Electrification Administration, room 0180, South Building, U.S. 
    Department of Agriculture, Washington, DC 20250-1500.
        (i) REA Bulletin 345-50, PE-60 (Sept 1979), REA Specification for 
    Trunk Carrier Systems, is incorporated by reference at 7 CFR 1755.97.
        (ii) [Reserved]
        (b) Types of requirements. (1) Unless otherwise indicated, the 
    requirements listed in this section are considered to be fixed 
    requirements.
        (2) The concentrator system shall communicate with standard T-1 
    digital transmission format between the concentrator and central office 
    terminals. Analog conversion functions at remote and central office 
    terminals shall be capable of being eliminated to accomodate end-to-end 
    digital transmission.
        (3) The LC shall operate properly as an integral part of the 
    telephone network when connected to physical or carrier derived 
    circuits and central offices meeting REA specifications and other 
    generally accepted telecommunications practices, such as (Bellcore) 
    Document TR-TSY-000303 Integrated Digital Loop Carrier System Generic 
    Requirements, TR-TSY-0008, Digital Interface between the SLC 96 Digital 
    Loop Carrier System and a Local Digital Switch, and Bell Communications 
    Research document TR-TSY-00057 Functional Criteria for Digital Loop 
    Carrier Systems.
        (4) For REA acceptance consideration of a LC, the manufacturer must 
    certify and demonstrate that all requirements specified in this section 
    are available and in compliance with this section.
        (5) Certain requirements are included in this section for features 
    which may not be needed for every application. Such features are 
    identifiable by the inclusion in the requirements of some such phrase 
    as ``when specified by the owner'' or ``as specified by the owner.'' In 
    some cases where an optional feature will not be required by an owner, 
    either now or in the future, a system which does not provide this 
    feature shall be considered to be in compliance with the specification 
    for the specific installation under consideration, but not in 
    compliance with the entire specification.
        (6) The owner may properly request bids from any supplier of an REA 
    accepted LC whose system provides all the features which will be 
    required for a specific installation.
        (7) When required by the owner, the supplier shall state compliance 
    to the Carrier Serving Area (CSA) requirements, as stated in Bell 
    Communications Research (Bellcore) Standard TR-TSY-000057, Functional 
    Criteria for Digital Loop Carrier Systems.
        (c) Reliability. (1) The failure rate of printed circuit boards 
    shall not exceed an average of 2.0 percent per month of all equipped 
    cards in all system terminals during the first 3 months after cutover, 
    and shall not exceed an average of 1.0 percent per month of all 
    equipped cards in all system terminals during the second 3-month 
    period. The failure rate for the equipment shall be less than 0.5 
    percent per month of all equipped cards in all system terminals after 6 
    months. A failure is considered to be the failure of a component on the 
    PC board which requires it to be repaired or replaced.
        (2) The line concentrator terminal units shall be designed such 
    that there will be no more than 4 hours of total outages in 20 years.
        (d) System type acceptance tests. General test results will be 
    required on each system type. Any system provided in accordance with 
    this section shall be capable of meeting any requirement in this 
    section on a spot-check basis.
        (e) Features required. (1) The network control equipment and 
    peripheral equipment shall be comprised of solid-state and integrated 
    circuitry components as far as practical and in keeping with the state-
    of-the-art and economics of the subject system.
        (2) When subscriber loops that exceed the resistance and voice 
    frequency gain range of the line concentrator equipment are required, 
    external loop extenders and loop extender/voice frequency repeater (LE/
    VFR) combinations must be of a type accepted by REA.
        (3) When specified by the owner, party line service shall be 
    supplied. The number of parties per line shall be no more than four.
        (f) Subscriber lines--(1) General. (i) The remote LC units shall 
    operate satisfactorily with subscriber lines which meet all of the 
    conditions under the bidder's specifications and all the requirements 
    of this section. This section recognizes that the loop limit of the 
    line concentrator is dependent upon the transmission facility between 
    the LC central office termination and the LC remote unit. When voice 
    frequency (physical) circuits are used, the loop limit from the COE to 
    the subscriber shall be 1900 ohms (including the telephone set). When 
    electronically derived circuits (carrier, lightwave, etc.) are used, 
    the loop limits of the electronic system will control. The bidder shall 
    identify the loop limits of the equipment to be supplied.
        (ii) The LC system shall be capable of allowing subscribers on the 
    same party line to call each other in systems providing party line 
    service when connected to central office equipment arranged to provide 
    reverting party line service.
        (iii) There should be provisions for such types of lines as ground 
    start, loop start, regular subscriber, pay stations, etc.
        (2) Dialing. (i) The line concentrator remote and central office 
    terminal equipment shall satisfactorily transmit dialing information 
    when used with subscriber dials having a speed of operation between 8 
    and 12 dial pulses per second and a break period of 55 to 65 % of the 
    total signaling period.
        (ii) Subscriber dial interdigital time. The remote and central 
    office LC equipment shall permit satisfactory telecommunications 
    operation when used with subscriber rotary dial interdigital times of 
    200 milliseconds minimum, and pushbutton dialing with 50 milliseconds 
    minimum.
        (iii) Subscriber line pushbutton dialing frequencies. The frequency 
    pairs assigned for pushbutton dialing when provided by the central 
    office shall be as listed in this paragraph (f)(2)(iii), with an 
    allowable variation of 1.5 percent:
    
    ------------------------------------------------------------------------
                                       High group frequencies (Hz)          
     Low group frequencies -------------------------------------------------
             (Hz)              1209         1336         1477        1633   
    ------------------------------------------------------------------------
    697                     1            2            3           Spare     
    770                     4            5            6           Spare     
    852                     7            8            9           Spare     
    941                     *            0            #           Spare     
    ------------------------------------------------------------------------
    
        (3) Ringing. (i) When LC ringing is generated at the remote end, it 
    shall be automatic and intermittent and shall be cut off from the 
    called line upon removal of the handset at the called station during 
    either the ringing or silent period.
        (ii) When ringing generators are provided in the LC on an ancillary 
    basis, they shall be selected from REA Bulletin 1755I-100 ``List of 
    Materials Acceptable for Use on Telephone Systems of REA Borrowers.''
        (iii) Where ringing is generated at the remote end, the ringing 
    system shall provide sufficient ringing on a bridged basis over the 
    voltage and temperature limits of this specification and over 
    subscriber loops within the limits stated by the manufacturer. The 
    manufacturer shall state the minimum number (not less than two) of main 
    station ringers that can be used for each ringing option available.
        (g) Traffic. (1)(i) The minimum grade of service for traffic in the 
    line concentrator shall be B=.005 using the Traffic Table, based on the 
    Erlang Lost-Calls-Cleared Formula. Required grade of service, traffic 
    assumptions and calculations for the particular application being 
    implemented shall be supplied by the bidder.
        (ii) Service to customers served by a traffic sensitive LC should 
    not be noticeably different than the service to customers served by the 
    dedicated physical pairs from the central office so that uniform grade 
    of service will be provided to all customers in any class of service. 
    Reference document Sec. 1755.522 (p)(1)(i), REA General Specification 
    for Digital Stored Program Controlled Central Office Equipment.
        (2) Traffic and Plant Registers. Traffic measurements consist of 
    three types--peg count, usage, and congestion. A peg count register 
    scores one count per call attempt per circuit group such as trunks, 
    digit receivers, senders, etc. Usage counters measure the traffic 
    density in networks, trunks and other circuit groups. Congestion 
    registers score the number of calls which fail to find an idle circuit 
    in a trunk group or to find an idle path through the switching network 
    when attempting to connect two given end points. These conditions 
    constitute ``network blocking.''
        (3) When required, traffic data will be stored in electronic 
    storage registers or a block of memory consisting of one or more 
    traffic counters for each item to be measured. The bidder shall 
    indicate what registers are to be supplied, their purpose and the means 
    for displaying the information locally (or at a remote location when 
    available).
        (h) Transmission requirements--(1) General. Unless otherwise 
    stated, the requirements in paragraphs (h)(2) through (20) of this 
    section are specified in terms of analog measurements made from Main 
    Distributing Frame (MDF) terminals to MDF terminals excluding cabling 
    loss.
        (2) Telephone transmitter battery supply. A minimum of 20 
    milliamperes, dc, shall be provided for the transmitter of the 
    telephone set at the subscriber station under all loop conditions 
    specified by the bidder. The telephone set is assumed to have a 
    resistance of 200 ohms.
        (3) Impedance--subscriber loops. For the purpose of this section, 
    the input impedance of all subscriber loops served by the equipment is 
    arbitrarily considered to be 900 ohms in series with 2.16 microfarad 
    capacitor at voice frequencies.
        (4) Battery noise. Noise across the remote terminal battery at 
    power panel distribution bus terminals shall not exceed 35 dBrnC during 
    the specified busy hour.
        (5) Stability. The long-term allowable variation in loss through 
    the line concentrator system shall be  0.5 dB from the loss 
    specified by the bidder.
        (6) Return loss. The specified return loss values are determined by 
    the service and type of port at the measuring end. Two-wire ports are 
    measured at 900 ohms in series with 2.16 microfarads, and 4-wire ports 
    are measured at 600 ohms resistive. When other balance networks are 
    supplied, test equipment arranged for operation with the supplied 
    network(s) may be used. The requirement given shall meet the following 
    cited values on each balance network available in the system:
    
        Line-to-Line or Line-to-Trunk (2-Wire)
        Echo Return Loss (ERL)--18 dB, Minimum
        Singing Return Loss (SRL)--Low--15 dB, Minimum
        Singing Return Loss (SRL)--High--18 dB, Minimum
    
        (7) Longitudinal balance. The minimum longitudinal balance, with dc 
    loop currents between 20 to 70 mA, shall be 60 dB at all frequencies 
    between 60 and 2000 Hz, 55 dB at 2700 Hz and 50 dB at 3400 Hz. The 
    method of measurement shall be as specified in the IEEE standard #455, 
    ``Standard Testing Procedure for Measuring Longitudinal Balance of 
    Telephone Equipment Operating in the Voice Band.'' Source voltage level 
    shall be 10 volts root mean square (rms) where conversation battery 
    feed originates at the remote end.
        (8) 60 hz longitudinal current immunity. The LC 60 Hz longitudinal 
    current immunity shall be measured in accordance with Figure 1 of this 
    section. Under test conditions cited on Figure 1 of this section, the 
    system noise shall be 23 dBrnC or less.
    
    BILLING CODE 3410-15-F
             Figure 1--Measuring the Effects of Low Frequency Induction
    
    TP25AP94.000
    
    
    BILLING CODE 3410-15-C
    Notes:
    1. Wilcom T194C or Equivalent (900 ohm termination, C-message 
    weighting, hold coil off)
    2. SNC Noise Choke 35 W, or equivalent
    3. Test at 0.020 Adc and 0.070 Adc
    4. 2  0.001 microfarad, 150 Vdc
    
        (9) Steady noise (idle channel at 900 ohm impedance). Steady noise: 
    Measure on terminated call. Noise measurements shall comply with the 
    following:
    
        Maximum--23 dBrnC0
        Average--18 dBrnC0 or Less
        3KHz Flat--Less than 35 dBrnO as an Objective
    
        (10) Impulse noise. LC central office terminal equipment shall have 
    an impulse noise limit of not more than five counts exceeding 54 dBrnC0 
    voice band weighted in a 5-minute period on six such measurements made 
    during the busy hour. A WILCOM T-194C Transmission Test Set, or 
    equivalent, should be used for the measurements. The measurement shall 
    be made by establishing a normal connection from the noise counter 
    through the switching equipment in its off-hook condition to a quiet 
    termination of 900 ohms impedance. Office battery and signaling circuit 
    wiring shall be suitably segregated from voice and carrier circuit 
    wiring, and frame talking battery filters provided, if and as required, 
    in order to meet these impulse noise limits.
        (11) Crosstalk coupling. Worst case equal level crosstalk shall be 
    65 dB minimum in the range 200 to 3400 Hz. This shall be measured 
    between any two paths through the system by connecting a 0 dBm0 level 
    tone to the disturbing pair.
        (12) Digital error rate. The digital line concentrator shall not 
    introduce more than one error in 108 bits averaged over a 5-minute 
    period, excluding the least significant bit.
        (13) Quantizing distortion. (i) The system shall meet the following 
    requirements:
    
    ------------------------------------------------------------------------
                                           Minimum Signal to Distortion With
     Input Level (dBm0) 1004 or 1020 Hz           C-Message Weighting       
    ------------------------------------------------------------------------
    0 to -30                               33 dB                            
    -30 to -40                             27 dB                            
    -40 to -45                             22 dB                            
    ------------------------------------------------------------------------
    
        (ii) Due to possible loss of the least significant bit on direct 
    digital connections, a signal to distortion degradation of up to 2 dB 
    may be allowed where adequately justified by the bidder.
        (14) Overload level. The overload level shall be +3 dBm0.
        (15) Gain tracking (linearity) shall meet the following 
    requirements:
    
    ------------------------------------------------------------------------
             Input Signal Level\1\               Maximum Gain Deviation     
    ------------------------------------------------------------------------
    +3 to -37 dBm0                          0.5 dB              
    -37 to -50 dBm0                         1 dB                
    ------------------------------------------------------------------------
    \1\1004 Hz reference at 0 dBm0.                                         
    
        (16) Frequency response (loss relative to 1004 Hz) for line-to-line 
    (via trunk group or intra-link) connections shall meet the following 
    requirements:
    
    ------------------------------------------------------------------------
                Frequency (Hz)                   Loss at 0 dBm0 Input\1\    
    ------------------------------------------------------------------------
    60                                      20 dB Min.\2\                   
    300                                     -1 to +3 dB                     
    600-2400                                1 dB                
    3200                                    -1 to +3 dB                     
    ------------------------------------------------------------------------
    \1\(-) means less loss and (+) means more loss.                         
                                                                            
    \2\Transmit End                                                         
    
        (17) Envelope delay distortion. On any properly established 
    connection, the envelope delay distortion shall not exceed the 
    following limits:
    
    ------------------------------------------------------------------------
               Frequency (Hz)                        Microseconds           
    ------------------------------------------------------------------------
    1000 to 2600                          190                               
    800 to 2800                           350                               
    600 to 3000                           500                               
    400 to 3200                           700                               
    ------------------------------------------------------------------------
    
        (18) Absolute delay. The absolute one-way delay through the line 
    concentrator, excluding delays associated with the central office 
    switching equipment, shall not exceed 1000 microseconds analog-to-
    analog measured at 1800 Hz.
        (19) Insertion loss. The insertion loss in both directions of 
    transmission at 1004 Hz shall be included in the insertion loss 
    requirements for the connected COE switch and shall not increase the 
    overall losses through the combined equipment beyond the values for the 
    COE alone, when operated through a direct digital interface. Systems 
    operated with a (VF) line circuit interface may introduce up to 3 dB 
    insertion loss. Reference Sec. 1755.522(e)(3).
        (20) Detailed requirements for direct digital connections. (i) This 
    paragraph (h)(20) covers the detailed requirements for the provision of 
    interface units which will permit direct digital connection between the 
    host central office and line concentrator subscriber terminals over 
    digital facilities. The digital transmission system shall be compatible 
    with T1 type span lines using a DS1 interface and other digital 
    interfaces that may be specified by the owner. The REA specification 
    for the T1 span line equipment is PE-60. Other span line techniques may 
    also be used. Diverse span line routing may be used when specified by 
    the owner.
        (ii) The output of a digital-to-digital port shall be Pulse Code 
    Modulation (PCM), encoded in eight-bit words using the mu-255 encoding 
    law and D3 encoding format, and arranged to interface with a T1 span 
    line.
        (iii) Signaling shall be by means of Multifrequency (MF) or Dual 
    Pulsing (DP) and the system which is inherent in the A and B bits of 
    the D3 format. In the case where A and B bits are not used for 
    signaling or system control, these bits shall only be used for normal 
    voice and data transmission.
        (iv) When a direct digital interface between the span line and the 
    host central office equipment is to be implemented, the following 
    requirements shall be met:
        (A) The span line shall be terminated in a central office repeater 
    and the DS1 bit stream shall be connected to a digital interface port 
    on the central office equipment;
        (B) The digital central office equipment shall be programmed to 
    support the operation of the digital port with the line concentrator 
    subscriber terminal;
        (C) The line concentrator subscriber terminal used with a direct 
    digital interface shall be interchangeable with the subscriber terminal 
    used with a central office terminal.
        (i) Alarms. The system shall send alarms for such conditions as 
    blown fuses, blocked controls, power failure in the remote terminal, 
    etc., along with its own status indication and status of dry relay 
    contact closures or solid-state equivalent to the associated central 
    office alarm circuits. Sufficient system alarm points shall be provided 
    from the remote terminal to report conditions to the central office 
    alarm system. The alarms shall be transmitted from the remote terminal 
    to the central office terminal as long as any part of the connecting 
    link is available for this transmission. Fuses shall be of the alarm 
    and indicator type, and their rating designated by numerals or color 
    code on fuse positions.
        (j) Electrical protection--(1) Surge protection. (i) Adequate 
    electrical protection of line concentrator equipment shall be included 
    in the design of the system. The characteristics and application of 
    protection devices must be such that they enable the line concentrator 
    equipment to withstand, without damage or excessive protector 
    maintenance, the dielectric stresses and currents that are produced in 
    line-to-ground and tip-to-ring circuits through the equipment as a 
    result of induced or conducted lightning or power system fault-related 
    surges. All wire terminals connected to outside plant wire or cable 
    pairs shall be protected from voltage and current surges.
        (ii) Equipment must pass laboratory tests, simulating the hostile 
    electrical environment, before being placed in the field for the 
    purpose of obtaining field experience. There are five basic types of 
    laboratory tests which must be applied to exposed terminals in an 
    effort to determine if the equipment will survive. Figure 2 of this 
    section, Summary of Electrical Requirements and Tests, identifies the 
    tests and their application.
    
                                 Figure 2--Summary of Electrical Requirements and Tests                             
    ----------------------------------------------------------------------------------------------------------------
                                                                                     No. of                         
             Test             Application     Peak Voltage or       Surge        Applications &        Comments     
                                Criteria          Current         Waveshape    Max. Time Between                    
    ----------------------------------------------------------------------------------------------------------------
    Current Surge          Low Impedance      500A or Lesser   10x1000 s             at 1 minute                         
                            Surges             Fig. 4)                          intervals                           
                                                                                                                    
    60 Hz Current          High or Low        10A rms or       11 Cycles of    3 each at 1                          
     Carrying               Impedance paths    Lesser Current   60 Hz (0.183    minute intervals                    
                            Exposed to         (See Fig. 6)     Sec.)                                               
                            Surges                                                                                  
                                                                                                                    
    AC Power Service       AC Power Service   2500V or +3      1.2x50         m>s             at 1 minute        used, must be    
                                               clamping V of                    intervals          removed.         
                                               arrester                                            Communications   
                                               employed at                                         line arresters,  
                                               10kV/                                      if used, remain  
                                               s                                                   in place.        
                                                                                                                    
    Voltage Surge          High Impedance     1000V or +3      10x1000  dc     m>s                                arresters, if    
                            Surges             breakdown of                                        used, must be    
                                               arrester                                            removed.         
                                               employed                                                             
                                                                                                                    
    Arrester Response      Paths protected    +3      100V/  Same               Same              
     Delay                  by arresters,      breakdown of     s rise decay                                        
                            such as gas        arrester         to 1/2 V. in                                        
                            tubes, with        employed at      tube's delay                                        
                            breakdown          100V/   time                                                
                            dependent on V.    s of rise                                                            
                            rate of rise.                                                                           
    ----------------------------------------------------------------------------------------------------------------
    
        (iii) Electrical protection requirements for line concentrator 
    equipment can be summarized briefly as follows:
        (A) Current surge tests simulate the stress to which a relatively 
    low impedance path may be subjected before main frame protectors break 
    down. Paths with a 100 Hz impedance of 50 ohms or less shall be 
    subjected to current surges, employing a 10  x  1000 microsecond 
    waveshape as defined in Figure 3 of this section, Surge Waveshape. For 
    the purpose of determining this impedance, arresters which are mounted 
    within the equipment are to be considered zero impedance. The crest 
    current shall not exceed 500A; however, depending on the impedance of 
    the test specimen this value of current may be lower. The crest current 
    through the sample, multiplied by the sample's 100 Hz impedance, shall 
    not exceed 1000 V. Where sample impedance is less than 2 ohms, peak 
    current shall be limited to 500A as shown in Figure 4 of this section, 
    Current Surge Tests;
    
    BILLING CODE 3410-15-F
                      Figure 3--Explanation of Surge Waveshape
    
    TP25AP94.001
    
    
    BILLING CODE 3410-15-C
        Surge Waveshape is defined as follows:
        Rise Time  x  Time to Decay to Half Crest Value
        (For example, 10  x  1000 s)
    Notes:
        T1 = Time to determine the rate of rise. The rate of rise 
    is determined as the slope between 10% and 90% of peak voltage or 
    current.
        T2 = Time to 50% of peak voltage (decay to half value).
    
    BILLING CODE 3410-15-F
                            Figure 4--Current Surge Test
    
    TP25AP94.002
    
    
    BILLING CODE 3410-15-C
    VL = Not to exceed 1000V
    VB = Charging Voltage
    Z100 = Test Specimen Impedance to be measured at 100 Hz.
    RP = Parallel Resistance (Waveshape)
    RS = Series Resistance (Current Limiting)
    
    ------------------------------------------------------------------------
           Z100              RS                RP                 VB        
    ------------------------------------------------------------------------
    0                         5                         2500      
    1                         4                         2500      
    2                         3                         2500      
    3                         2                         1670      
    4                         1                         1250      
    5                         0                         1000      
    7.5                       0                 15                1000      
    10                        0                 10                1000      
    15                        0                7.5                1000      
    20                        0                6.7                1000      
    25                        0               6.25                1000      
    30                        0                  6                1000      
    40                        0                5.7                1000      
    50                        0                5.5                1000      
    ------------------------------------------------------------------------
    
        (B) Sixty Hertz (60 Hz) current carrying tests shall be applied to 
    simulate an ac power fault which is conducted to the unit over the 
    cable pairs. The test shall be limited to 10 amperes Root Mean Square 
    (RMS) of 60 Hz ac for a period of 11 cycles (0.1835 seconds) and shall 
    be applied longitudinally from line to ground;
        (C) AC power service surge voltage tests shall be applied to the 
    power input terminals of ac powered devices to simulate switching 
    surges or lightning-induced transients on the ac power system. The test 
    shall employ a 1.2  x  50 microsecond waveshape with a crest voltage of 
    2500 V. Communications line protectors may be left in place for these 
    tests;
        (D) Voltage surge tests which simulate the voltage stress to which 
    a relatively high impedance path may be subjected before primary 
    protectors break down and protect the circuit. To ensure coordination 
    with the primary protection while reducing testing to the minimum, 
    voltage surge tests shall be conducted at a 1000 volts with primary 
    arresters removed for devices protected by carbon blocks, or the +3 
    sigma dc breakdown voltage of other primary arresters. Surge waveshape 
    should be 10  x  1000 microseconds; and
        (E) Arrester response delay tests are designed to stress the 
    equipment in a manner similar to that caused by the delayed breakdown 
    of gap type arresters when subjected to rapidly rising voltages. 
    Arresters shall be removed for these tests, the peak surge voltage 
    shall be the +3 sigma breakdown voltage of the arrester in question on 
    a voltage rising at 100 V per microsecond, and the time for the surge 
    to decay to half voltage shall equal at least the delay time of the 
    tube as explained in Figure 5 of this section, Arrester Response Delay 
    Time.
    
    BILLING CODE 3410-15-F
                Figure 5--Explanation of Arrester Response Delay Time
    
    TP25AP94.003
    
    
    BILLING CODE 3410-15-C
        Note: The delay time is that period of time when the potential 
    across an arrester exceeds its dc firing level.
    
        (iv) Tests shall be conducted in the following sequence. As not all 
    tests are required in every application, non-applicable tests should be 
    omitted:
    
        (A) Current Impulse Test;
        (B) Sixty Hertz (60 Hz) Current Carrying Tests;
        (C) AC Power Service Impulse Voltage Test;
        (D) Voltage Impulse Test; and
        (E) Arrester Response Delay Time Test.
    
        (v) A minimum of five applications of each polarity for the surge 
    tests and three for the 60 Hz Current Carrying Tests are the minimum 
    required. All tests shall be conducted with not more than 1 minute 
    between consecutive applications in each series of three or five 
    applications to a specific configuration so that heating effects will 
    be cumulative. See Figure 6 of this section, 60 Hz Current Surge Tests.
    
    BILLING CODE 3410-15-F
                         Figure 6--60 Hz Current Surge Test
    
    TP25AP94.004
    
    
    BILLING CODE 3410-15-C
    V--700 Volts root mean square (rms) (Approximately 1000V Peak).
    Z60--Test specimen impedance to be measured at 60 Hz.
    RS--Series Resistance (current limiting) in each side of line. 
    (Source impedance never less than 50 > longitudinal.)
    
    
    ------------------------------------------------------------------------
                   Z60 Hz                                 RS                
    ------------------------------------------------------------------------
    0                                    140                                
    10                                   120                                
    20                                   100                                
    50                                   100                                
    Over 50                              100                                
    ------------------------------------------------------------------------
    
        (vi) Tests shall be applied between each of the following terminal 
    combinations for all line operating conditions:
    
        (A) Line tip to ring;
        (B) Line ring to ground;
        (C) Line tip to ground; and
        (D) Line tip and ring tied together to ground.
    
        (2) Dielectric strength. (i) Arresters shall be removed for all 
    dielectric strength tests.
        (ii) Direct current potentials shall be applied between all line 
    terminals and the equipment chassis and between these terminals and 
    grounded equipment housings in all instances where the circuitry is dc 
    open circuit from the chassis, or connected to the chassis through a 
    capacitor. The duration of all dielectric strength tests shall be at 
    least 1 second. The applied potential shall be at a minimum equal to 
    the plus 3 sigma dc breakdown voltage of the arrester, provided by the 
    line concentrator manufacturer.
        (3) Insulation resistance. Following the dielectric tests, the 
    insulation resistance of the installed electrical circuits between 
    wires and ground, with the normal equipment grounds removed, shall not 
    be less than 10 megohms at 500 volts dc at a temperature of 68 deg.F 
    (20 deg.C) and at a relative humidity of approximately 50 percent. The 
    measurement shall be made after the meter stabilizes, unless the 
    requirement is met sooner. Arresters shall be removed for these tests.
        (4) Self-protection. (i) All components shall be capable of being 
    continuously energized at rated voltage without injury. Design 
    precautions must be taken to prevent damage to other equipment 
    components when a particular component fails.
        (ii) Printed circuit boards or similar equipment employing 
    electronic components should be self-protecting against external 
    grounds applied to the connector terminals. Board components and 
    coatings applied to finished products shall be of such material or so 
    treated that they will not support combustion.
        (iii) Every precaution shall be taken to protect electrostatically 
    sensitive components from damage during handling. This shall include 
    written instructions and recommendations.
        (k) Miscellaneous--(1) Interconnect wire. All interconnect wire 
    shall be of soft annealed tinned copper wire meeting the requirements 
    of ASTM Specification B33-91 and of suitable cross-section to provide 
    safe current carrying capacity and mechanical strength. The insulation 
    of installed wire, connected to its equipment and frames, shall be 
    capable of withstanding the same insulation resistance and dielectric 
    strength requirements as given in paragraphs (j)(2) and (j)(3) of this 
    section at a temperature of 120 deg.F (49 deg.C), and a relative 
    humidity of 90 percent.
        (2) Wire wrapped terminals. These terminals are preferred and where 
    used shall be of a material suitable for wire wrapping. The connections 
    to them shall be made with a wire wrapping tool with the following 
    minimum number of successive non-overlapping turns of bare tinned 
    copper wire in contact with each terminal:
        (i) 6 turns of 30 gauge;
        (ii) 6 turns of 26 gauge;
        (iii) 6 turns of 24 gauge; or
        (iv) 5 turns of 22 gauge.
        (3) Protection against corrosion. All metal parts of equipment 
    frames, distributing frames, cable supporting framework and other 
    exposed metal parts shall be constructed of corrosion resistant 
    materials or materials plated or painted to render them adequately 
    corrosion resistant.
        (4) Screws and bolts. Screw threads for all threaded securing 
    devices shall be of American National Standard form in accordance with 
    Federal Standard H28, unless exceptions are granted to the manufacturer 
    of the switching equipment. All bolts, nuts, screws, and washers shall 
    be of nickel-copper alloy, steel, brass or bronze.
        (5) Environmental requirements. (i) The bidder shall specify the 
    environmental conditions necessary for safe storage and satisfactory 
    operation of the equipment being bid. If requested, the bidder shall 
    assist the owner in planning how to provide the necessary environment 
    for the equipment.
        (ii) To the extent practicable, the following temperature range 
    objectives shall be met:
        (A) For equipment mounted in central office and subscriber 
    buildings, the carrier equipment shall operate satisfactory within an 
    ambient temperature range of 32 deg.F to 120 deg.F (0 deg.C to 
    49 deg.C) and at 80 percent relative humidity between 50 deg.F and 
    100 deg.F (10 deg.C and 38 deg.C);
        (B) Equipment mounted outdoors in normal operation (with cabinet 
    doors closed) shall operate satisfactorily within an ambient 
    temperature range (external to cabinet) of -40 deg.F to 140 deg.F (-
    40 deg.C to 60 deg.C) and at 95 percent relative humidity between 
    50 deg.F to 100 deg.F (10 deg.C to 38 deg.C). As an alternative to the 
    (60 deg.C) requirement, a maximum ambient temperature of 120 deg.F 
    (49 deg.C) with equipment (cabinet) exposed to direct sunlight may be 
    substituted.
        (6) Stenciling. Equipment units and terminal jacks shall be 
    adequately designated and numbered. They shall be stenciled so that 
    identification of equipment units and leads for testing or traffic 
    analysis can be made without unnecessary reference to prints or 
    descriptive literature.
        (7) Quantity of equipment bays. Consistent with system arrangements 
    and ease of maintenance, space shall be provided on the floor plan for 
    an orderly layout of future equipment bays. Readily accessible 
    terminals will be provided for connection to interbay and frame cables 
    to future bays. All cables, interbay and intrabay (excluding power), if 
    technically feasible, shall be terminated at both ends by connectors.
        (8) Radio and television interference. Measures shall be employed 
    by the bidders to limit the radiation of radio frequencies generated by 
    the equipment so as not to interfere with radio, television receivers, 
    or other sensitive equipment.
        (9) Housing. (i) When housed in a building supplied by the owner, a 
    complete floor plan including ceiling height, floor loading, power 
    outlets, cable entrances, equipment entry and travel, type of 
    construction, and other pertinent information shall be supplied.
        (ii) In order to limit corrosion, all metal parts of the housing 
    and mounting frames shall be constructed of suitable corrosion 
    resistant materials or materials protectively coated to render them 
    adequately resistant to corrosion under the climatic and atmospheric 
    conditions existing in the area in which the housing is to be 
    installed.
        (10) Distributing frame. (i) The line concentrator terminal 
    equipment located at the central office shall be protected by the 
    central office main distribution frame. The bidder may supply 
    additional protection capability as appropriate. All protection devices 
    (new or existing) shall be arranged to operate in a coordinated manner 
    to protect equipment, limit surge currents, and protect personnel.
        (ii) The distributing frame shall provide terminals for terminating 
    all incoming cable pairs. Arresters shall be provided for all incoming 
    cable pairs, or for a smaller number of pairs if specified.
        (iii) The current carrying capacity of each arrester and its 
    associated mounting shall coordinate with a #22 gauge copper conductor 
    without causing a self-sustaining fire or permanently damaging other 
    arrester positions. Where all cable pairs entering the housing are #24 
    gauge or finer, the arresters and mountings need only coordinate with 
    #24 gauge cable conductors.
        (iv) Remote terminal protectors may be mounted and arranged so that 
    outside cable pairs may be terminated on the left or bottom side of 
    protectors (when facing the vertical side of the MDF) or on the back 
    surface of the protectors. Means for easy identification of pairs shall 
    be provided.
        (v) Protectors shall have a ``dead front'' (either insulated or 
    grounded) where live metal parts are not readily accessible.
        (vi) Protectors shall be provided with an accessible terminal of 
    each incoming conductor which is suitable for the attachment of a 
    temporary test lead. They shall also be constructed so that auxiliary 
    test fixtures may be applied to open and test the subscriber's circuit 
    in either direction. Terminals shall be suitable for wire wrapped 
    connections or connectorized.
        (vii) If specified, each protector group shall be furnished with a 
    factory assembled tip cable for splicing to the outside cable; the tip 
    cable shall be 20 feet (6.1 m) in length, unless otherwise specified. 
    Tip cable used shall be REA accepted.
        (viii) Protector makes and types used shall be REA accepted.
        (l) Power equipment--(1) General. When specified, batteries and 
    charging equipment shall be supplied for the remote terminal of the 
    line concentrator.
        (2) Operating Voltage. (i) The nominal operating voltage of the 
    central office and remote terminal shall be 48 volts dc, provided by a 
    battery with the positive side tied to system ground.
        (ii) Where equipment is dc powered, it must operate satisfactorily 
    over a range of 50 volts 6 volts dc.
        (iii) Where equipment is ac powered, it must operate satisfactorily 
    over a range of 120  10 volts or 220  10 volts 
    ac.
        (3) Batteries. (i) Unless otherwise specified by the owner, sealed 
    batteries shall be supplied for the remote line concentrator terminal.
        (ii) The batteries shall have an ampere hour load capacity of no 
    less than 8 busy hours. When an emergency ac supply source is 
    available, the battery reserve may be reduced to 3 busy hours.
        (iii) The batteries shall be sealed when they are mounted in the 
    cabinet with the concentrator equipment.
        (iv) Battery heaters shall be supplied in a bidder-furnished 
    housing whenever climatic conditions require.
        (4) Charging equipment. (i) One charger capable of carrying the 
    full dc power load of the remote terminal shall be supplied unless 
    otherwise specified by the owner.
        (ii) Charging shall be on a full float basis. The rectifiers shall 
    be of the full wave, self-regulating, constant voltage, solid-state 
    type and shall be capable of being turned on and off manually.
        (iii) When charging batteries, the voltage at the battery terminals 
    shall be adjustable and shall be set at the value recommended for the 
    particular battery being charged, provided it is not above the maximum 
    operating voltage of the central office switching equipment. The 
    voltage shall not vary more than 0.02 volt dc per cell 
    between 10% load and 100% load. Between 3% and 10% load, the output 
    voltage shall not vary more than 0.04 volt dc per cell. 
    Beyond full load current the output voltage shall drop sharply. The 
    above output voltage shall be maintained with input line voltage 
    variations of plus or minus 10 percent. Provision shall be made to 
    manually change the output voltage of the rectifier to 2.25 volts per 
    cell to provide an equalization charge on the battery.
        (iv) The charger noise, when measured with a suitable noise 
    measuring set and under the rated battery capacitance and load 
    conditions, shall not exceed 22 dBrnC. See Figure 7 of this section, 
    Charger Noise Test.
    
    BILLING CODE 3410-15-F
                            Figure 7--Charger Noise Test
    
    TP25AP94.005
    
    
    BILLING CODE 3410-15-C
        Note: (1) The manufacturer may elect to eliminate the capacitor 
    C from the measurement.
    
        Capacitance C in F = 30,000 F per ampere-hour 
    per cell. For example, 25 cells at 100 ampere-hour would be 
    equivalent to a capacitance of:
    
        (30,000  x  100)/25 = 120,000 F
    
        (2) The value of the resistive load R is determined by the 
    nominal battery voltage in volts divided by the full load rating in 
    amperes. For example, for a 48 volt battery and a full load current 
    of 24 amperes, the load resistance R is 48/24 = 2 ohms of 
    appropriate power handling capacity.
    
        (v) The charging equipment shall be provided with a means for 
    indicating a failure of charging current whether due to ac power 
    failure, an internal failure in the charger, or to other circumstances 
    which might cause the output voltage of the charger to drop below the 
    battery voltage. Where a supplementary constant current charger is 
    used, an alarm shall be provided to indicate a failure of the charger.
        (vi) Audible noise developed by the charging equipment shall be 
    kept to a minimum. Acoustic noise resulting from operation of the 
    rectifier shall be expressed in terms of dB indicated on a sound level 
    meter conforming to American National Standards Institute S1.4, and 
    shall not exceed 65 dB (A-weighting) measured at any point 5 feet 
    (1.5m) from any vertical surface of the rectifier.
        (vii) The charging equipment shall be designed so that neither the 
    charger nor the central office equipment is subject to damage in case 
    the battery circuit is opened for any value of load within the normal 
    limits.
        (5) Power panel. (i) Battery and charger control switches, dc 
    voltmeters, dc ammeters, fuses and circuit breakers, supervisory and 
    timer circuits shall be provided as required. Portable or panel mounted 
    frequency meters or voltmeters shall be provided as specified by the 
    owner.
        (ii) Power panels, cabinets and shelves, and associated wiring 
    shall be designed initially to handle the line concentrator terminal 
    when it reaches its ultimate capacity as specified by the owner.
        (iii) The power panel shall be of the ``dead front'' type.
        (6) Ringing equipment. The ringing system shall provide sufficient 
    ringing on a bridged basis over the voltage and temperature limits of 
    this section and over subscriber drops within the limits stated by the 
    bidder. The ringing system shall be without operational problems such 
    as bell tapping during dialing. The bidder shall state the minimum 
    number (not less than two) of main station ringers that can be used for 
    each ringing option available.
        (7) Interrupter equipment. The interrupter may be an integral part 
    of the system or may be part of the associated central office equipment 
    connected to the line concentrator central office terminal.
        (8) Special systems. Manufacturers of LC systems that operate by 
    extending ringing current from the central office shall state their 
    required input ringing (voltage and frequency) and the limitations on 
    the connected subscriber loop.
        (m) Fusing requirements--(1) General. (i) The equipment shall be 
    completely wired and equipped with fuses, trouble signals, and all 
    associated equipment for the wire capacity of the frames or cabinets 
    provided.
        (ii) Design precautions shall be taken to prevent the possibility 
    of equipment damage arising from the insertion of an electronic package 
    into the wrong connector or the removal of a package from any connector 
    or improper insertion of the correct card in its connector.
        (2) Fuses. Fuses and circuit breakers shall be of an alarm and 
    indicator type, except where the fuse or breaker location is indicated 
    on the alarm printout. Their rating shall be designated by numerals or 
    color codes on the fuse or the panel.
        (n) Trouble location and test--(1) Equipment. (i) Trouble 
    indications in the system may be displayed in the form of lights on the 
    equipment units or printed circuit boards.
        (ii) When required, a jack or other connector shall be provided to 
    connect a fault or trouble recorder (printer or display).
        (2) Maintenance system. (i) The maintenance system shall monitor 
    and maintain the system operation without interruption of call 
    processing except for major failures.
        (ii) The maintenance system shall be arranged to provide the 
    ability to determine trouble to an individual card, functional group of 
    cards, or other equipment unit.
        (o) Spare parts. Lists of spare parts and maintenance tools as 
    recommended by the bidder shall be provided. The cost of such tools and 
    spare parts shall be indicated and shall not be included in the base 
    price.
        (p) Drawings and printed material. (1) The bidder shall supply 
    instructional material for each line concentrator system involved at 
    the time of delivery of the equipment. It is not the intent of this 
    section to require system documentation necessary for the repair of 
    individual circuit boards.
        (2) Three complete sets of legible drawings shall be provided. Each 
    set shall include all of the following:
        (i) Drawings of major equipment items such as frames, with the 
    location of major component items of equipment shown therein;
        (ii) Wiring diagrams indicating the specific method of wiring used 
    on each item of equipment and interconnection wiring between items of 
    equipment;
        (iii) Maintenace drawings covering each equipment item that 
    contains replaceable parts, appropriately identifying each part by name 
    and part number; and
        (iv) Job drawings including all drawings that are individual to the 
    particular line concentrator involved such as mainframe, power 
    equipment, etc.
        (3) The following information shall also be furnished:
        (i) A complete index of required drawings;
        (ii) An explanation of electrical principles of operation of 
    overall concentrator system;
        (iii) A list of tests which can be made with each piece of test 
    equipment furnished and an explanation of the method of making each 
    test;
        (iv) A sample of each form recommended for use in keeping records;
        (v) The criteria for analyzing results of tests and determining 
    appropriate corrective action;
        (vi) A set of general notes on methods of isolating equipment 
    faults to specific printed circuit cards in the equipment;
        (vii) A list of typical troubles which might be encountered, 
    together with general indications as to probable location of each 
    trouble; and
        (viii) All special line concentrator system grounding requirements.
        (q) Installation and acceptancea--(1) General. Paragraphs (q)(2)(i) 
    through (q)(3)(xxi) of this section covers the general requirements for 
    the installation of line concentrator equipment by the bidder, and 
    outlines the general conditions to be met by the owner in connection 
    with such installation work. The responsibilities apply in both the 
    central office installation and remote terminal installations, unless 
    otherwise noted.
        (2) Responsibilities of owner. The owner shall:
        (i) Allow the bidder and its employees free access to the premises 
    and facilities at all hours during the progress of the installation;
        (ii) Provide access to the remote site and any other site for 
    development work needed during the installation;
        (iii) Take such action as necessary to ensure that the premises are 
    dry and free from dust and in such condition as not to be hazardous to 
    the installation personnel or the material to be installed (not 
    required when remote terminal is not installed in a building);
        (iv) Provide heat or air conditioning when required and general 
    illumination in rooms in which work is to be performed or materials 
    stored;
        (v) Provide suitable openings in buildings to allow material to be 
    placed in position (not required when a remote terminal is not 
    installed in a building);
        (vi) Provide the necessary conduit and commercial and dc-ac 
    inverter output power to the locations shown on the approved floor plan 
    drawings;
        (vii) Provide 110 volts a.c., 60 Hz commercial power equipped with 
    a secondary arrester and a reasonable number of outlets for test, 
    maintenance and installation equipment;
        (viii) provide suitable openings or channels and ducts for cables 
    and conductors from floor to floor and from room to room;
        (ix) Provide suitable ground leads, as designated by the bidder 
    (not required when remote terminal is not installed in a building);
        (x) Provide the necessary wiring, central office ground and 
    commercial power service, with a secondary arrester, to the location of 
    an exterior remote terminal installation based on the voltage and load 
    requirements furnished voltage and load requirements furnished by the 
    bidder;
        (xi) Test at the owners expense all lines and trunks for 
    continuity, leakage and loop resistance and ensure that all lines and 
    trunks are suitable for operation with the central office and remote 
    terminal equipment specified;
        (xii) Make alterations and repairs to buildings necessary for 
    proper installation of material, except to repair damage for which the 
    bidder or its employees are responsible;
        (xiii) Connect outside cable pairs on the distributing frame (those 
    connected to protectors);
        (xiv) Furnish all line, class of service assignment, and party line 
    assignment information to permit bidder to program the data base memory 
    within a reasonable time prior to final testing;
        (xv) Release for the bidder's use, as soon as possible, such 
    portions of the existing plant as are necessary for the proper 
    completion of such tests as require coordination with existing 
    facilities including facilities for T1 span lines with properly 
    installed repeaters between the central office and the remote terminal 
    installations;
        (xvi) Make prompt inspections as it deems necessary when notified 
    by the bidder that the equipment, or any part thereof, is ready for 
    acceptance;
        (xvii) Provide adequate fire protection apparatus at the remote 
    terminal, including one or more fire extinguishers or fire 
    extinguishing systems of the gaseous type, that has low toxicity and 
    effect on equipment;
        (xviii) Provide necessary access ports for cable, if underfloor 
    cabling is selected;
        (xix) Install equipment and accessory plant devices mounted 
    external to the central office building and external to the repeater 
    and other outside housings including filters, repeater housings, 
    splicing of repeater cable stubs, externally mounted protective devices 
    and other such accessory devices in accordance with written 
    instructions provided by the bidder; and
        (xx) Make all cross connections (at the MDF or Intermediate 
    Distribution Frame IDF) between the physical trunk or carrier equipment 
    and the central office equipment unless otherwise specified in appendix 
    A of this section.
        (3) Responsibilities of bidder. The bidder shall:
        (i) Allow the owner and its representatives access to all parts of 
    the building at all times;
        (ii) Obtain the owner's permission before proceeding with any work 
    necessitating cutting into or through any part of the building 
    structure such as girders, beams, concrete or tile floors, partitions 
    or ceilings (does not apply to the installation of lag screws, 
    expansion bolts, and similar devices used for fastening equipment to 
    floors, columns, walls, and ceilings);
        (iii) Be responsible for and repair all damage to the building due 
    to carelessness of the bidder's workforce, exercise reasonable care to 
    avoid any damage to the owner's switching equipment or other property, 
    and report to the owner any damage to the building which may exist or 
    may occur during its occupancy of the building;
        (iv) Consult with the owner before cutting into or through any part 
    of the building structure in all cases where the fireproofing or 
    moisture proofing may be impaired;
        (v) Take necessary steps to ensure that all fire fighting apparatus 
    is accessible at all times and all flammable materials are kept in 
    suitable places outside the building;
        (vi) Not use gasoline, benzene, alcohol, naphtha, carbon 
    tetrachloride or turpentine for cleaning any part of the equipment;
        (vii) Be responsible for delivering the CO and remote terminal 
    equipment to the sites where they will be needed;
        (viii) Install the equipment in accordance with the specifications 
    for the line concentrator;
        (ix) Have all leads brought out to terminal blocks on the MDF (or 
    IDF if stated in appendix A of this section) and have all terminal 
    blocks identified and permanently labeled;
        (x) Use separate shielded type leads grounded at one end only 
    unless otherwise specified by the owner or bidder or tip cables meeting 
    REA cable crosstalk requirements for carrier frequencies inside the 
    central office;
        (xi) Group the cables to separate carrier frequency, voice 
    frequency, signaling, and power leads;
        (xii) Make the necessary power and ground connections (location as 
    shown in appendix A of this section) to the purchaser's power terminals 
    and ground bus unless otherwise stated in appendix A of this section 
    (ground wire shall be 6 AWG unless otherwise stated);
        (xiii) Place the battery in service in compliance with the 
    recommendations of the battery manufacturer;
        (xiv) Make final charger adjustments using the manufacturer's 
    recommended procedure;
        (xv) Run all jumpers, except line and trunk jumpers (those 
    connected to protectors) unless otherwise specified in appendix A of 
    this section;
        (xvi) Establish and update all data base memories with subscriber 
    information as supplied by the owner until an agreed turnover time;
        (xvii) Give the owner notice of completion of the installation at 
    least one week prior to completion;
        (xviii) Permit the owner or its representative to conduct tests and 
    inspections after installation has been completed in order that the 
    owner may be assured the requirements for installation are met;
        (xvix) Allow access, before turnover, by the owner or its 
    representative, upon request, to the test equipment which is to be 
    turned over as a part of the delivered equipment, to permit the 
    checking of the circuit features which are being tested and to permit 
    the checking of the amount of connected equipment to which the test 
    circuits have access;
        (xx) Notify the owner promptly of the completion of work of the 
    central office terminals, remote terminals or such portions thereof as 
    are ready for inspection; and
        (xxi) Correct promptly all defects for which the bidder is 
    responsible.
        (4) Information to be furnished by bidder. The bidder shall 
    accompany its bid with the following information:
        (i) Two copies of the equipment list and the traffic calculations 
    from which the quantities in the equipment list are determined;
        (ii) Two copies of the traffic tables from which the quantities are 
    determined, if other than the Erlang B traffic tables;
        (iii) A block diagram of the line concentrator and associated 
    maintenance equipment will be provided;
        (iv) A prescribed method and criteria for acceptance of the 
    completed line concentrator which will be subject to review.
        (v) This special grounding requirements including the recommended 
    configuration, suggested equipment and installation methods to be used 
    to accomplish them;
        (vi) The special handling and equipment requirements to avoid 
    damage resulting from the discharge of static electricity (see 
    paragraph (j) (4)(iii) of this section) or mechanical damage during 
    transit installation and testing;
        (vii) The location of technical assistance service, its 
    availability and conditions for owner use and charges for the service 
    by the bidder; and
        (viii) The identification of the subscriber loop limits available 
    beyond the line concentrator.
        (5) Installation Requirements (i) All work shall be done in a neat, 
    workmanlike manner. Equipment frames or cabinets shall be correctly 
    located, carefully aligned, anchored, and firmly braced. Cables shall 
    be carefully laid with sufficient radius of curvature and protected at 
    corners and bends to ensure against damage from handling or vibration. 
    Exterior cabinet installations for remote terminals shall be made in a 
    permanent, eye-pleasing manner.
        (ii) All multiple and associated wiring shall be continuous, free 
    from crosses, reverses, and grounds and shall be correctly wired at all 
    points.
        (iii) An inspection shall be made by the owner or its 
    representatives prior to performing operational and performance tests 
    on the equipment, but after all installing operations which might 
    disturb apparatus adjustments have been completed. The inspection shall 
    be of such character and extent as to disclose with reasonable 
    certainty any unsatisfactory condition of apparatus or equipment. 
    During these inspections, or inspections for apparatus adjustments, or 
    wire connections, or in testing of equipment, a sufficiently detailed 
    examination shall be made throughout the portion of the equipment 
    within which such condition is observed, or is likely to occur, to 
    disclose the full extent of its existence, where any of the following 
    conditions are observed:
    
        (A) Apparatus or equipment units failing to compare in quantity and 
    type to that specified for the installation;
        (B) Apparatus or equipment units damaged or incomplete;
        (C) Apparatus or equipment affected by rust, corrosion or marred 
    finish; and
        (D) Other adverse conditions resulting from failure to meet 
    generally accepted standards of good workmanship.
    
        (6) Operational tests. (i) Operational tests shall be performed on 
    all circuits and circuit components to ensure their proper functioning 
    in accordance with appropriate explanation of the operation of the 
    circuit.
        (ii) All equipment shall be tested to ensure proper operation with 
    all components connected in all possible combinations and each line 
    shall be tested for proper ring, ring trip and supervision.
        (iii) All fuses shall be verified for continuity and correct 
    rating. Alarm indication shall be demonstrated for each equipped fuse 
    position. An already failed fuse compatible with the fuse position may 
    be used.
        (iv) Each alarm or signal circuit shall be checked for correct 
    operation.
        (v) A sufficient quantity of locally originating and incoming calls 
    shall be made to demonstrate the function of the line concentrator 
    including all equipped transmission paths. When intra-link calling is 
    supplied, all intra-link transmission paths shall be demonstrated.
        (7) Acceptance tests and data required. (i) Data shall be supplied 
    to the owner by the bidder in writing as a part of the final documents 
    in closing out the contract as follows:
        (A) A detailed cross connect drawing of alarm to power board, 
    central office battery to physical trunks or carrier system, wiring 
    options used in terminals, channels, filters, repeaters, etc., marked 
    in the owner's copy of the equipment manual or supplied separately;
        (B) The measured central office supply voltages applied to the 
    equipment terminals or repeaters at the time the jack and test point 
    readings are made and ac supply voltages where equipment is powered 
    from commercial ac sources;
        (C) A list of all instruments, including accessories, by 
    manufacturer and type number, used to obtain the data; and
        (D) The measurements at all jack or test points recommended by the 
    manufacturer, including carrier frequency level measurements at all 
    carrier terminals and repeaters where utilized.
        (ii) Data in the form of a checklist or other notations shall be 
    supplied showing the results of the operational tests.
        (iii) The bidder shall furnish to the owner a record of the battery 
    cell or multicell unit voltages measured at the completion of the 
    installation of the switching system before it is placed in commercial 
    service. This is not required at a site where the owner furnishes dc 
    power.
        (8) Joint inspection requirements. (i) The bidder shall notify the 
    owner in writing at least one week before the date the complete system 
    will be ready for inspection and tests. A joint inspection shall be 
    made by the bidder and the owner (or owner's engineer) to determine 
    that the equipment installation is acceptable. The inspection shall 
    include physical inspection, a review of acceptance test data, 
    operational tests, and sample measurements.
        (A) The owner shall review the acceptance test data and compare it 
    to the requirements of this section.
        (B) Sample measurements shall be made on all systems installed 
    under this contract. Test methods should follow procedures describe in 
    paragraph (g) (5) of this section.
        (C) A check shall be made of measured test point and jack readings 
    for compliance with the manufacturer's specifications. This applies 
    also to channels, terminals, carrier frequency repeaters, and fault 
    locating circuits.
        (ii) In the event that the measured data or operational tests show 
    that equipment fails to meet the requirements of this section, the 
    deficiencies are to be resolved as set forth in Article II of the 397 
    Special Equipment Contract. The reports of the bidder and the owner 
    shall be detailed as to deficiencies, causes, corrective action 
    necessary, corrective action to be taken, completion time, etc.
    
    (The information and recordkeeping requirements of this section have 
    been approved by the Office of Management and Budget (OMB) under the 
    control number 0572-0077.)
    
    BILLING CODE 3410-15-F
    
    Appendix A to Sec. 1755.397--Specification for Line Concentrator 
    Detailed Equipment Requirements
    
    (Information to Be Supplied by Owner)
    
    Telephone Company (Owner)
    
    Name:------------------------------------------------------------------
    
    Location:--------------------------------------------------------------
    
    Number of LC's Required:-----------------------------------------------
    
        Line Concentrator Locations: 
    
    ------------------------------------------------------------------------
           Location               No. of lines            Central office    
    ------------------------------------------------------------------------
                                                                            
    ------------------------                                                
                                                                            
    ------------------------                                                
                                                                            
    ------------------------                                                
                                                                            
    ------------------------------------------------------------------------
    
    1. General
    
        1.1  Notwithstanding the bidder's equipment lists, the equipment 
    and materials furnished by the bidder must meet the requirements of 
    paragraphs (a) through (p) of this section, and this appendix A.
        1.2  Paragraph (a) through (p) of this section cover the minimum 
    general requirements for line concentrator equipment.
        1.3  Paragraph (q) of this section covers the requirements for 
    installation, inspection and testing when such service is included 
    as part of the contract.
        1.4  This appendix A covers the technical data for application 
    engineering and detailed equipment requirements insofar as they can 
    be established by the owner. This appendix A shall be filled in by 
    the owner.
        1.5  Appendix B of this section covers detailed information on 
    the line concentrator equipment, information on system reliability 
    and traffic capacity as proposed by the bidder. Appendix B of this 
    section is to be filled in by the bidder and must be presented with 
    the bid.
    
    Office Name
    
    (By Location)----------------------------------------------------------
    
    LC Designation---------------------------------------------------------
    
    2. Number of Subscriber Lines
    
    ------------------------------------------------------------------------
                                    Equipped                Wired only      
    ------------------------------------------------------------------------
    Single-Party ..........                                                 
                            --------------------------                      
                                                                            
    Two-Party .............                                                 
                            --------------------------                      
                                                                            
    Four-Party ............                                                 
                            --------------------------                      
                                                                            
    Pay Station (Type:                                                      
     ________________) .                                                    
                            --------------------------                      
                                                                            
    Other (Describe:                                                        
     ________________) .                                                    
                            --------------------------                      
                                                                            
          Total............                                                 
                                                                            
                            ==========================                      
    ------------------------------------------------------------------------
    
    3. Loop Resistance
    
        3.1  Number of non-pay station lines having a loop resistance, 
    including the telephone set as follows:
        3.1.1  For physical trunks between the remote and the office 
    units, the loop resistance is to include the resistance of the 
    trunk. 
    
    ----------------------------------------------------------------------------------------------------------------
                                                                                   No. of lines                     
    ----------------------------------------------------------------------------------------------------------------
    1200-1900 ohms ........................................                                                         
                                                            --------------------------------------------------------
                                                                                                                    
    1901-3200 ohms ........................................                                                         
                                                            --------------------------------------------------------
                                                                                                                    
    3201-4500 ohms ........................................                                                         
                                                            --------------------------------------------------------
                                                                                                                    
    ----------------------------------------------------------------------------------------------------------------
    
        3.1.2  Number of pay station lines having a loop resistance, 
    excluding the telephone set, greater than: 
    
    ----------------------------------------------------------------------------------------------------------------
                                                                                   No. of lines                     
    ----------------------------------------------------------------------------------------------------------------
    1200 ohms (Prepay) ....................................                                                         
                                                            --------------------------------------------------------
                                                                                                                    
    1000 ohms (Semi-Postpay) ..............................                                                         
                                                            --------------------------------------------------------
                                                                                                                    
    ----------------------------------------------------------------------------------------------------------------
    
        When physical trunks are used, these resistances include that of 
    the facility between the CO and the remote.
        3.1.3  Range extension equipment, if required, is to be 
    provided:
    
    ____________ By Bidder
    ____________ By Owner
    (Quantity and Type)----------------------------------------------------
    
    4. Traffic Data
    
        4.1  Average combined originating and terminating hundred call 
    seconds (CCS) per line in the busy hour:
    
    ____________ CCS/Line. (Assume originating & terminating equal.)
    
      4.2  Percent Intra-Calling-------------------------------------------
    
      4.3  Total Busy Hour Calls-------------------------------------------
    
    5. Type or Ringing
    
        5.1  Frequency No.
    
    ----------------------------------------------------------------------------------------------------------------
                                     1                      2                      3                      4         
    ----------------------------------------------------------------------------------------------------------------
    Frequency (Hz).......                                                                                           
                          ------------------------                                                                  
                                                                                                                    
    Max. No. of Phones/                                                                                             
     Freq.                                                                                                          
    ----------------------------------------------------------------------------------------------------------------
    
        5.2  Minimum ringing generator capacity to be supplied shall be 
    sufficient to serve ________________ lines (each frequency).
    
    6. Central Office Equipment Interface
    
        6.1  COE will be:
      6.1.1  COE Manufacturer----------------------------------------------
    Type-------------------------------------------------------------------
    
    Year-------------------------------------------------------------------
    
    Generic----------------------------------------------------------------
    
        6.1.2  ______ See digital central office specification for the 
    switchboard at ____________________.
        6.2  Interface will be:
        6.2.1  ______ Line Circuit(s)
        6.2.2  ______ Direct Digital Interface
        6.2.3  ______ Other (Describe) ________________________
    
    ----------------------------------------------------------------------
    
        6.3  Mounting rack for line concentrator furnished by:
              ______ Bidder        ______ Owner
    (Specify width and height of rack available)
    
    Width------------------------------------------------------------------
    
    Height-----------------------------------------------------------------
    
        6.4  Equipment to be installed in existing building:
              ______ Yes (Attach detailed plan)     ______ No
    
    7. Transmission Facilities
    
        7.1  Transmission facilities between the central office and 
    remote terminals shall be:
        7.1.1  Type:
              ______ VF Carrier Derived Circuits
              ______ Digital Span Line (DS1)
              ______ Other ________________________
    
    (Attach a layout of the transmission facilities between the central 
    office and the remote terminals describing transmission and 
    signaling parameters, routing and resistance where applicable).
        7.1.2  Utilizies physical plant
              ______ Cable Pairs (Existing/New)
              ______ Other ________________________
    
        Note: Unless otherwise stated, physical plant will be supplied 
    by the owner.
    
        7.1.3  Terminal equipment for transmission facility to be 
    supplied by:
               ______ Owner        ______ Bidder
        7.1.3.1  Carrier e/w voice terminations ______ Yes     ______ No
    
      Manufacturer and type------------------------------------------------
        Central office voice terminations
    
    Equipped---------------------------------------------------------------
    
    Wired Only-------------------------------------------------------------
    
        7.1.3.2  Digital span line (DS1) supplied by
              ______ Owner        ______ Bidder
    
            Manufacturer and Type------------------------------------------
    
        7.1.3.3  Number of repeaters (per span line) ____________
        7.1.3.4  Diverse (alternate) span line routing required
              ______ Yes (Describe in Item 11)    ______ No
        7.1.3.5  Span line terminations only    ______ Yes    ______ No
        7.1.3.6  Span line power required (CO and Remote Terminals)    
    ______ Yes    ______ No
        7.1.3.7  Physical facility between CO and remote Loop Resistance 
    ______ ohms, Length ________ meters
    
    8. Power Equipment Requirements
    
        8.1  Central Office Terminal
        8.1.1  Owner-furnished -48 volt dc power    ______ Yes    ______ 
    No
        8.1.2  Other (Describe) ________________________
        8.1.3  Standby power is available    ______ Yes    ______ No
        8.2  Remote Terminal
        8.2.1  Owner-furnished -48 vdc power    ______ Yes    ______ No
        8.2.2  Bidder-furnished power supply    ______ Yes    ______ No
        8.2.3  AC power available at site:
              ______ 110 vac, 60 Hz, single-phase
              ______ Other (Describe in Item 11)
        8.2.4  A battery reserve of ______ busy hours shall be provided 
    for this line concentrator terminal when it reaches ________ lines 
    at the traffic rates specified.
        8.2.5  Batteries supplied shall be:
              ______ Lead Calcium
              ______ Stabilized Electrolyte    
              ______ Sealed Lead Acid
              ______ Other (Describe in item 11)
        8.2.6  Standby power is available    ______ Yes    ______ No
    
    9. Remote Terminal
    
        9.1  Mounting
        9.1.1  ______ Outside Housing (To be furnished by bidder)
        9.1.2  ______ Concrete Slab to be furnished by owner (Bidder to 
    supply construction details after award.)
        9.1.3  ______ Manhole, environmentally controlled (Describe in 
    Item 11)
        9.1.4  ______ Pedestal Mounting
        9.1.5  ______ Pole Mounting (Owner-furnished installed pole)
        9.1.6  ______ Prefab Building (Owner-furnished site)
        9.2   Equipment is to be installed in an existing building.    
    ______ Yes    ______ No
    (Attach detailed plan.)
        9.3  Other (Describe)________________________
    
    ----------------------------------------------------------------------
    
    
    
    10. Alternates
    
    11. Explanatory Notes
    
    Appendix B to Sec. 1755.397--Specification For Line Concentrators 
    Detailed Requirements; Bidder Supplied Information
    
    Telephone Company (Owner)
    
    Name:------------------------------------------------------------------
    
    Location:--------------------------------------------------------------
    
        Line Concentrator Equipment Locations
    
      Central Office Terminal:---------------------------------------------
    
      Remote Terminal:-----------------------------------------------------
    
    1. General
    
        1.1  The equipment and materials furnished by the bidder must 
    meet the requirements of paragraphs (a) through (p) of this section.
        1.2  Paragraph (a) through (p) of this section cover the minimum 
    general requirements for line concentrator equipment.
        1.3  Paragraph (q) of this section covers requirements for 
    installation, inspection and testing when such service is included 
    as part of the contract.
        1.4  Appendix A of this section covers the technical data for 
    application engineering and detailed equipment requirements insofar 
    as they can be established by the owner. Appendix A of this section 
    is to be filled in by the owner.
        1.5  This appendix B covers detailed information on the line 
    concentrator equipment, information as to system reliability and 
    traffic capacity as proposed by the bidder. This appendix B shall be 
    filled in by the bidder and must be presented with the bid.
    
    2. Performance Objectives
    
        2.1  Reliability (See paragraph (c) of this section)
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
        2.2  Busy Hour Load Capacity and Traffic Delay (See Paragraph 
    (g) of this section)
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    3. Equipment Quantities Dependent on System Design
    
        3.1  Transmission Facilities between the Central Office and 
    Remote Terminals 
    
    ------------------------------------------------------------------------
             Type               Quantity equipped      Quantity wired only  
    ------------------------------------------------------------------------
                                                                            
    ------------------------                                                
                                                                            
    ------------------------                                                
                                                                            
    ------------------------                                                
    ------------------------------------------------------------------------
    
    4. Power Requirements
    
        4.1  Central Office Terminal
    
          Voltage----------------------------------------------------------
    
          Current Drain (Amps)---------------------------------------------
    
          Normal-----------------------------------------------------------
    
          Peak-------------------------------------------------------------
    
          Fuse Qty---------------------------------------------------------
    
          Size-------------------------------------------------------------
    
          Type-------------------------------------------------------------
    
          Heat Dissipation (BTU/Hr.)---------------------------------------
        4.2  Remote Terminal
    
          AC or DC---------------------------------------------------------
    
          Voltage----------------------------------------------------------
    
          Current Drain (Amps)---------------------------------------------
    
          Normal-----------------------------------------------------------
    
          Peak-------------------------------------------------------------
    
          Fuse Qty---------------------------------------------------------
    
          Size-------------------------------------------------------------
    
          Type-------------------------------------------------------------
    
          Heat Dissipation (BTU/Hr.)---------------------------------------
    
      Power required for heating or cooling equipment in remote bidder-
    furnished housing------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    ----------------------------------------------------------------------
    
    5. Temperature and Humidity Limitations
    
        5.1  Temperature 
    
    ------------------------------------------------------------------------
                                 Central office               Remote*       
    ------------------------------------------------------------------------
    Maximum  deg.F ( deg.C)                                                 
     .                                                                      
                            --------------------------                      
                                                                            
    Minimum  deg.F ( deg.C)                                                 
     .                                                                      
                            --------------------------                      
    ------------------------------------------------------------------------
    
        5.2  Relative Humidity 
    
    ------------------------------------------------------------------------
                                 Central Office               Remote*       
    ------------------------------------------------------------------------
    Maximum ...............                                                 
                            --------------------------                      
                                                                            
    Minimum ...............                                                 
                            --------------------------                      
                                                                            
    ------------------------------------------------------------------------
    *Show conditions outside bidder-furnished housing.                      
    
    6. Explanatory Notes
    
        Dated: April 6, 1994.
    Bob J. Nash,
    Under Secretary, Small Community and Rural Development.
    [FR Doc. 94-9835 Filed 4-22-94; 8:45 am]
    
    
    
    

Document Information

Published:
04/25/1994
Department:
Agriculture Department
Entry Type:
Uncategorized Document
Action:
Proposed rule.
Document Number:
94-9835
Dates:
Written comments must be received by REA or postmarked no later then May 25, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: April 25, 1994
CFR: (2)
7 CFR 1755.97
7 CFR 1755.397