2012-9872. Buy America Waiver Notification  

  • Start Preamble

    AGENCY:

    Federal Highway Administration (FHWA), DOT.

    ACTION:

    Notice.

    SUMMARY:

    This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of non-domestic 45′ and 55′ Pre-stressed Spun Concrete Transmission and Distribution Power Poles in the Territory of Guam for synchronization of the existing system.

    DATES:

    The effective date of the waiver is April 26, 2012.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For questions about this notice, please contact Mr. Gerald Yakowenko, FHWA Office of Program Administration, (202) 366-1562, or via email at gerald.yakowenko@dot.gov. For legal questions, please contact Mr. Michael Harkins, FHWA Office of the Chief Counsel, (202) 366-4928, or via email at michael.harkins@dot.gov. Office hours for the FHWA are from 8 a.m. to 4:30 p.m., e.t., Monday through Friday, except Federal holidays.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Electronic Access

    An electronic copy of this document may be downloaded from the Federal Register's home page at: http://www.archives.gov and the Government Printing Office's database at: http://www.gpo.gov.

    Background

    The FHWA's Buy America policy in 23 CFR 635.410 requires a domestic manufacturing process for any steel or iron products (including protective coatings) that are permanently incorporated in a Federal-aid construction project. The regulation also provides for a waiver of the Buy America requirements when the application would be inconsistent with the public interest or when satisfactory quality domestic steel and iron products are not sufficiently available. This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate to use non-domestic 45′ and 55′ Pre-stressed Spun Concrete Transmission and Distribution Power Poles in the Territory of Guam.

    In accordance with Division A, section 123 of the “Consolidated Appropriations Act, 2010” (Pub. L. 111-117), the FHWA published a notice of intent to issue a waiver on its Web site for 45′ and 55′ Pre-stressed Spun Concrete Transmission and Distribution Power Poles in the Territory of Guam (http://www.fhwa.dot.gov/​construction/​contracts/​waivers.cfm?​id=​66) on March 12. The FHWA received one comment in response to the publication. The comment supports approval of the waiver request. During the 15-day comment period, the FHWA conducted additional nationwide review to locate potential domestic manufacturers of 45′ and 55′ Pre-stressed Spun Concrete Transmission and Distribution Power Poles in the Territory of Guam. Based on all the information available to the agency, the FHWA concludes that there are no domestic manufacturers of 45′ and 55′ Pre-stressed Spun Concrete Transmission and Distribution Power Poles.

    In accordance with the provisions of section 117 of the SAFETEA-LU Technical Corrections Act of 2008 (Pub. L. 110-244, 122 Stat. 1572), the FHWA is providing this notice as its finding that a waiver of Buy America requirements is appropriate. The FHWA invites public comment on this finding for an additional 15 days following the effective date of the finding. Comments may be submitted to the FHWA's Web site via the link provided to the Territory of Guam waiver page noted above.

    (Authority: 23 U.S.C. 313; Pub. L. 110-161, 23 CFR 635.410)

    Start Signature

    Issued on: April 13, 2012.

    Gregory G. Nadeau,

    Deputy Administrator.

    End Signature End Supplemental Information

    [FR Doc. 2012-9872 Filed 4-24-12; 8:45 am]

    BILLING CODE 4910-22-P

Document Information

Effective Date:
4/26/2012
Published:
04/25/2012
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice.
Document Number:
2012-9872
Dates:
The effective date of the waiver is April 26, 2012.
Pages:
24760-24760 (1 pages)
PDF File:
2012-9872.pdf