2024-08720. Regulatory Guide: Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Final guide; issuance.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.30, “Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities.” This RG describes an approach that is acceptable to the NRC staff to meet the regulatory requirements for installation, inspection, and testing for Class 1E power, instrumentation, and control equipment at production and utilization facilities.

    DATES:

    Revision 1 to RG 1.30 is available on April 25, 2024.

    ADDRESSES:

    Please refer to Docket ID NRC-2023-0216 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:

    Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0216. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individuals listed in the FOR FURTHER INFORMATION CONTACT section of this document.

    NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.

    NRC's PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.

    Revision 1 to RG 1.30 and the regulatory analysis may be found in ADAMS under Accession Nos. ML24040A161 and ML23235A321, respectively.

    Regulatory guides are not copyrighted, and NRC approval is not required to reproduce them.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Eudy, Office of Nuclear Regulatory Research, telephone: 301-415-3104; email: Michael.Eudy@nrc.gov and Darrell Murdock, Office of Nuclear Regulatory Research, telephone: 301-415-1591; email: Darrell.Murdock@nrc.gov. Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Discussion

    The NRC is issuing a revision in the NRC's “Regulatory Guide” series. This series was developed to describe methods that are acceptable to the NRC staff for implementing specific parts of the agency's regulations, to explain techniques that the staff uses in evaluating specific issues or postulated events, and to describe information that the staff needs in its review of applications for permits and licenses.

    The proposed Revision 1 to RG 1.30 was issued with a temporary identification of Draft Regulatory Guide (DG)-1419 (ADAMS Accession No. ML23222A182). This revision of this Start Printed Page 31603 guide (Revision 1) describes an approach that is acceptable to the NRC staff to meet the regulatory requirements for installation, inspection, and testing for Class 1E power, instrumentation, and control equipment at production and utilization facilities. RG 1.30, Revision 1 endorses, with a clarification, Institute of Electrical and Electronics Engineers (IEEE) Standard 336-2020, “IEEE Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities.”

    II. Additional Information

    The NRC published a notice of the availability of DG-1419 in the Federal Register on December 20, 2023 (88 FR 87967) for a 30-day public comment period. The public comment period closed on January 19, 2024. Public comments on DG-1419 and the staff responses to the public comments are available in ADAMS under Accession No. ML24040A165.

    As noted in the Federal Register on December 9, 2022 (87 FR 75671), this document is being published in the “Rules” section of the Federal Register to comply with publication requirements under chapter I of title 1 of the Code of Federal Regulations (CFR).

    III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 U.S.C. 801-808). However, the Office of Management and Budget has not found it to be a major rule as defined in the Congressional Review Act.

    IV. Backfitting, Forward Fitting, and Issue Finality

    Issuance of RG 1.30, Revision 1, does not constitute backfitting as that term is defined in 10 CFR 50.109, “Backfitting,” and as described in NRC Management Directive (MD) 8.4, “Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests”; affect the issue finality of an approval issued under 10 CFR part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants”; or constitute forward fitting as that term is defined and described in MD 8.4 because, as explained in RG 1.30, Revision 1, licensees are not required to comply with the positions set forth in the RG.

    V. Submitting Suggestions for Improvement of Regulatory Guides

    A member of the public may, at any time, submit suggestions to the NRC for improvement of existing RGs or for the development of new RGs. Suggestions can be submitted on the NRC's public website at https://www.nrc.gov/​reading-rm/​doc-collections/​reg-guides/​contactus.html. Suggestions will be considered in future updates and enhancements to the “Regulatory Guide” series.

    Start Signature

    Dated: April 18, 2024.

    For the Nuclear Regulatory Commission.

    Meraj Rahimi,

    Chief, Regulatory Guide and Programs Management Branch, Division of Engineering, Office of Nuclear Regulatory Research.

    End Signature End Supplemental Information

    [FR Doc. 2024-08720 Filed 4-24-24; 8:45 am]

    BILLING CODE 7590-01-P