[Federal Register Volume 60, Number 80 (Wednesday, April 26, 1995)]
[Notices]
[Pages 20486-20488]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-10218]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG95-42-000, et al.]
GVK Industries Limited, et al.; Electric Rate and Corporate
Regulation Filings
April 18, 1995.
Take notice that the following filings have been made with the
Commission:
1. GVK Industries Limited
[Docket No. EG95-42-000]
On April 13, 1995, GVK Industries Limited (``Applicant''), U.S.
Office, Route 1, Box 197, Biscoe, NC 27209, filed with the Federal
Energy Regulatory Commission an application for
[[Page 20487]] determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's Regulations.
Applicant will own an approximately 235 MW (ISO) electric
generating facility located in Jegurupadu, Andhra Pradesh, India. The
Facility's electricity will be sold exclusively at wholesale, with the
possible exception of some retail sales in India. None of the electric
energy generated by the Facility will be sold to consumers in the
United States.
Comment date: May 8, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
2. Jegurupadu Operating and Maintenance Co.
[Docket No. EG95-43-000]
On April 13, 1995, Jegurupadu Operating and Maintenance Company
(``Applicant''), U.S. Office, Vice President of Operations, CMS
Generation, 330 Town Center Drive, Suite 1000, Dearborn, MI 48126-2712,
filed with the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's Regulations.
Applicant will operate, as an agent of the owner, an approximately
235 MW (ISO) electric generating facility located in Jegurupadu, Andhra
Pradesh, India. The facility's electricity will be sold exclusively at
wholesale, with the possible exception of some retail sales in India.
None of the electricity generated by the Facility will be sold to
consumers in the United States.
Comment date: May 8, 1995, in accordance with Standard Paragraph E
at the end of this notice. The Commission will limit its consideration
of comments to those that concern the adequacy or accuracy of the
application.
3. New England Power Co.
[Docket No. ER95-871-000]
Take notice that on April 6, 1995, New England Power Company,
tendered for filing an addition to the Service Agreement between New
England Power Company and Boston Edison Company for transmission
service under NEP's FERC Electric Tariff, Original Volume No. 3.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
4. Portland General Electric Co.
[Docket No. ER95-872-000]
Take notice that on April 6, 1995, Portland General Electric
Company (PGE), tendered for filing executed Service Agreements under
FERC Electric Tariff, Original Volume No. 2 (PGE-2) with Public Utility
District No. 1 of Cowlitz County and the City of Azusa Light & Water
Department.
Pursuant to 18 CFR 35.11, and the Commission's Order in Docket No.
PL93-2-002 issued July 30, 1993, PGE has requested that the Commission
grant a waiver of the notice requirements of 18 CFR 35.3 to allow the
executed Service Agreement with the City of Azusa Light & Water Dept.
to become effective April 5, 1995. PGE has requested that the executed
Service Agreement with Public Utility District No. 1 of Cowlitz County
remain effective October 9, 1994, as ordered in the Commission's
November 22, 1994 letter order issued in Docket No. ER94-1543-000.
Copies of the filing have been served on the parties included in
the Certificate of Service attached to the filing letter.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
5. Electric Clearinghouse, Inc.
[Docket No. ER95-873-000]
Take notice that on April 6, 1995, Electric Clearinghouse, Inc.
(ECI), tendered for filing a letter from the Executive Committee of the
Western Systems Power Pool (WSPP) approving ECI's application for
membership in the WSPP. ECI requests that the Commission amend the WSPP
Agreement to include it as a member.
ECI requests an effective date of one day after filing for the
proposed amendment. Accordingly, ECI requests waiver of the
Commission's notice requirements for good cause shown. (18 CFR 35.3 and
35.11.)
Copies of the filing were served upon the WSPP Executive Committee.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
6. Illinois Power Co.
[Docket No. ER95-874-000]
Take notice that on April 6, 1995, Illinois Power Company (Illinois
Power), tendered for filing Amendment No. 18, dated March 28, 1995, to
the Interconnection Agreement, dated March 1, 1964, between Illinois
Power and Commonwealth Edison Company (Edison). Amendment No. 18 adds a
service schedule permitting Illinois Power to sell Firm Power to Edison
and amends Article 7 of the Interconnection Agreement.
Illinois Power requests an effective date for its rate schedule of
June 1, 1995. Accordingly, the parties request waiver of the
Commission's notice requirements to the extent necessary.
Copies of this filing were served upon the Illinois Commerce
Commission and Edison.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
7. The Washington Water Power Co.
[Docket No. ER95-875-000]
Take notice that on April 6, 1995, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.12, an agreement with the Bonneville
Power Administration for the return of transmission losses.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
8. The Washington Water Power Co.
[Docket No. ER95-876-000]
Take notice that on April 6, 1995, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.12, an agreement with the Bonneville
Power Administration for the return of transmission losses.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
9. The Montana Power Co.
[Docket No. ER95-877-000]
Take notice that on April 6, 1995, The Montana Power Company
(Montana), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.13 a supplement to Rate Schedule FERC
No. 188 (a Transmission Agreement between The Montana Power Company and
Puget Sound Power & Light Company, dated July 30, 1971). Montana
requests that the Commission grant a waiver of the 60-day prior notice
requirement pursuant to 18 CFR 35.11.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
10. Audit Pro Incorporated
[Docket No. ER95-878-000]
Take notice that on April 6, 1995, Audit Pro. Incorporated (API),
tendered for filing pursuant to Rule 205, 18 CFR 385.205, a petition
for waivers and blanket approvals under various regulations of the
Commission and for an order accepting its FERC Electric Rate Schedule
No. 1 to be effective on the date of the order. [[Page 20488]]
API intends to engage in electric power and energy transactions as
a marketer and a broker. In transactions where API sells electric
energy it proposes to make such sales on rates, terms, and conditions
to be mutually agreed to with the purchasing party. API is not in the
business of generating, transmitting, or distributing electric power.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
11. Public Service Company of Oklahoma Southwestern Electric Power
Company
[Docket No. ER95-880-000]
Take notice that on April 3, 1995, Public Service Company of
Oklahoma and Southwestern Electric Power Company (collectively the
Companies), tendered for filing an executed coordination transmission
service agreement between Companies and the NorAm Energy Services, Inc.
(NorAm) and a revised index of purchasers to whom Companies provide
service under their Coordination Transmission Service Tariff. The
Companies request that the filing be accepted to become effective as of
March 1, 1995.
A copy of the filing has been sent to NorAm, the Louisiana Public
Service Commission, the Arkansas Public Service Commission and the
Oklahoma Corporation Commission.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
12. Atlantic City Electric Co.
[Docket No. ER95-881-000]
Take notice that on April 6, 1995, Atlantic City Electric Company
(ACE), tendered for filing an Agreement for Short-Term Energy
Transactions between ACE and Engelhard Power Marketing, Inc. ACE
requests that the Agreement be accepted to become effective April 7,
1995.
Copies of the filing were served on the New Jersey Board of
Regulatory Commissioners.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
13. Cambridge Electric Light Co.
[Docket No. ER95-882-000]
Take notice that on April 6, 1995, Cambridge Electric Light Company
(Cambridge), tendered for filing an informational report detailing the
charges for non-firm transmission service derived under the formula
rate provision of Cambridge's FERC Electric Tariff Original Volume No.
4, accepted by the Commission on September 30, 1987 in FERC Docket No.
ER87-600-000.
Comment date: May 3, 1995, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-10218 Filed 4-25-95; 8:45 am]