95-10218. GVK Industries Limited, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 80 (Wednesday, April 26, 1995)]
    [Notices]
    [Pages 20486-20488]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-10218]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. EG95-42-000, et al.]
    
    
    GVK Industries Limited, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    April 18, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. GVK Industries Limited
    
    [Docket No. EG95-42-000]
    
        On April 13, 1995, GVK Industries Limited (``Applicant''), U.S. 
    Office, Route 1, Box 197, Biscoe, NC 27209, filed with the Federal 
    Energy Regulatory Commission an application for 
    [[Page 20487]] determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's Regulations.
        Applicant will own an approximately 235 MW (ISO) electric 
    generating facility located in Jegurupadu, Andhra Pradesh, India. The 
    Facility's electricity will be sold exclusively at wholesale, with the 
    possible exception of some retail sales in India. None of the electric 
    energy generated by the Facility will be sold to consumers in the 
    United States.
        Comment date: May 8, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    2. Jegurupadu Operating and Maintenance Co.
    
    [Docket No. EG95-43-000]
    
        On April 13, 1995, Jegurupadu Operating and Maintenance Company 
    (``Applicant''), U.S. Office, Vice President of Operations, CMS 
    Generation, 330 Town Center Drive, Suite 1000, Dearborn, MI 48126-2712, 
    filed with the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's Regulations.
        Applicant will operate, as an agent of the owner, an approximately 
    235 MW (ISO) electric generating facility located in Jegurupadu, Andhra 
    Pradesh, India. The facility's electricity will be sold exclusively at 
    wholesale, with the possible exception of some retail sales in India. 
    None of the electricity generated by the Facility will be sold to 
    consumers in the United States.
        Comment date: May 8, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    3. New England Power Co.
    
    [Docket No. ER95-871-000]
    
        Take notice that on April 6, 1995, New England Power Company, 
    tendered for filing an addition to the Service Agreement between New 
    England Power Company and Boston Edison Company for transmission 
    service under NEP's FERC Electric Tariff, Original Volume No. 3.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. Portland General Electric Co.
    
    [Docket No. ER95-872-000]
    
        Take notice that on April 6, 1995, Portland General Electric 
    Company (PGE), tendered for filing executed Service Agreements under 
    FERC Electric Tariff, Original Volume No. 2 (PGE-2) with Public Utility 
    District No. 1 of Cowlitz County and the City of Azusa Light & Water 
    Department.
        Pursuant to 18 CFR 35.11, and the Commission's Order in Docket No. 
    PL93-2-002 issued July 30, 1993, PGE has requested that the Commission 
    grant a waiver of the notice requirements of 18 CFR 35.3 to allow the 
    executed Service Agreement with the City of Azusa Light & Water Dept. 
    to become effective April 5, 1995. PGE has requested that the executed 
    Service Agreement with Public Utility District No. 1 of Cowlitz County 
    remain effective October 9, 1994, as ordered in the Commission's 
    November 22, 1994 letter order issued in Docket No. ER94-1543-000.
        Copies of the filing have been served on the parties included in 
    the Certificate of Service attached to the filing letter.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. Electric Clearinghouse, Inc.
    
    [Docket No. ER95-873-000]
    
        Take notice that on April 6, 1995, Electric Clearinghouse, Inc. 
    (ECI), tendered for filing a letter from the Executive Committee of the 
    Western Systems Power Pool (WSPP) approving ECI's application for 
    membership in the WSPP. ECI requests that the Commission amend the WSPP 
    Agreement to include it as a member.
        ECI requests an effective date of one day after filing for the 
    proposed amendment. Accordingly, ECI requests waiver of the 
    Commission's notice requirements for good cause shown. (18 CFR 35.3 and 
    35.11.)
        Copies of the filing were served upon the WSPP Executive Committee.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. Illinois Power Co.
    
    [Docket No. ER95-874-000]
    
        Take notice that on April 6, 1995, Illinois Power Company (Illinois 
    Power), tendered for filing Amendment No. 18, dated March 28, 1995, to 
    the Interconnection Agreement, dated March 1, 1964, between Illinois 
    Power and Commonwealth Edison Company (Edison). Amendment No. 18 adds a 
    service schedule permitting Illinois Power to sell Firm Power to Edison 
    and amends Article 7 of the Interconnection Agreement.
        Illinois Power requests an effective date for its rate schedule of 
    June 1, 1995. Accordingly, the parties request waiver of the 
    Commission's notice requirements to the extent necessary.
        Copies of this filing were served upon the Illinois Commerce 
    Commission and Edison.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. The Washington Water Power Co.
    
    [Docket No. ER95-875-000]
    
        Take notice that on April 6, 1995, The Washington Water Power 
    Company (WWP), tendered for filing with the Federal Energy Regulatory 
    Commission pursuant to 18 CFR 35.12, an agreement with the Bonneville 
    Power Administration for the return of transmission losses.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. The Washington Water Power Co.
    
    [Docket No. ER95-876-000]
    
        Take notice that on April 6, 1995, The Washington Water Power 
    Company (WWP), tendered for filing with the Federal Energy Regulatory 
    Commission pursuant to 18 CFR 35.12, an agreement with the Bonneville 
    Power Administration for the return of transmission losses.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. The Montana Power Co.
    
    [Docket No. ER95-877-000]
    
        Take notice that on April 6, 1995, The Montana Power Company 
    (Montana), tendered for filing with the Federal Energy Regulatory 
    Commission pursuant to 18 CFR 35.13 a supplement to Rate Schedule FERC 
    No. 188 (a Transmission Agreement between The Montana Power Company and 
    Puget Sound Power & Light Company, dated July 30, 1971). Montana 
    requests that the Commission grant a waiver of the 60-day prior notice 
    requirement pursuant to 18 CFR 35.11.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. Audit Pro Incorporated
    
    [Docket No. ER95-878-000]
    
        Take notice that on April 6, 1995, Audit Pro. Incorporated (API), 
    tendered for filing pursuant to Rule 205, 18 CFR 385.205, a petition 
    for waivers and blanket approvals under various regulations of the 
    Commission and for an order accepting its FERC Electric Rate Schedule 
    No. 1 to be effective on the date of the order. [[Page 20488]] 
        API intends to engage in electric power and energy transactions as 
    a marketer and a broker. In transactions where API sells electric 
    energy it proposes to make such sales on rates, terms, and conditions 
    to be mutually agreed to with the purchasing party. API is not in the 
    business of generating, transmitting, or distributing electric power.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. Public Service Company of Oklahoma Southwestern Electric Power 
    Company
    
    [Docket No. ER95-880-000]
    
        Take notice that on April 3, 1995, Public Service Company of 
    Oklahoma and Southwestern Electric Power Company (collectively the 
    Companies), tendered for filing an executed coordination transmission 
    service agreement between Companies and the NorAm Energy Services, Inc. 
    (NorAm) and a revised index of purchasers to whom Companies provide 
    service under their Coordination Transmission Service Tariff. The 
    Companies request that the filing be accepted to become effective as of 
    March 1, 1995.
        A copy of the filing has been sent to NorAm, the Louisiana Public 
    Service Commission, the Arkansas Public Service Commission and the 
    Oklahoma Corporation Commission.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. Atlantic City Electric Co.
    
    [Docket No. ER95-881-000]
    
        Take notice that on April 6, 1995, Atlantic City Electric Company 
    (ACE), tendered for filing an Agreement for Short-Term Energy 
    Transactions between ACE and Engelhard Power Marketing, Inc. ACE 
    requests that the Agreement be accepted to become effective April 7, 
    1995.
        Copies of the filing were served on the New Jersey Board of 
    Regulatory Commissioners.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Cambridge Electric Light Co.
    
    [Docket No. ER95-882-000]
    
        Take notice that on April 6, 1995, Cambridge Electric Light Company 
    (Cambridge), tendered for filing an informational report detailing the 
    charges for non-firm transmission service derived under the formula 
    rate provision of Cambridge's FERC Electric Tariff Original Volume No. 
    4, accepted by the Commission on September 30, 1987 in FERC Docket No. 
    ER87-600-000.
        Comment date: May 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-10218 Filed 4-25-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
04/26/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-10218
Dates:
May 8, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
20486-20488 (3 pages)
Docket Numbers:
Docket No. EG95-42-000, et al.
PDF File:
95-10218.pdf