99-10403. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 64, Number 79 (Monday, April 26, 1999)]
[Notices]
[Page 20284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-10403]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-318-000]
Koch Gateway Pipeline Company; Notice of Request Under Blanket
Authorization
April 19, 1999.
Take notice that on April 15, 1999, Koch Gateway Pipeline Company
(Koch Gateway), P.O. Box 1478, Houston, Texas 77251-1478, filed a
request with the Commission in Docket No. CP99-318-000 pursuant to
Sections 157.205 and 157.216(b) of the Commission's Regulations under
the Natural Gas Act for approval to abandon certain inactive delivery
facilities, under the blanket certificate issued in Docket No. CP82-
430-000, pursuant to Section 7(c) of the Natural Gas Act (NGA), all as
more fully set forth in the request which is open to the public for
inspection. The application may be viewed on the web at http://
www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance).
Koch Gateway proposes to abandon in place approximately 4,810 feet
of 4-inch pipeline and abandon by removal approximately 100 feet of 4-
inch pipeline and two 1-inch taps, all located in Lafayette Parish,
Louisiana. Koch Gateway states that these facilities formerly served
two farm tap customers on behalf of Reliant Energy Entex, a Division of
Reliant Energy Resources Corporation (Entex), a local distribution
company. Koch Gateway further states that Entex has tied these farm tap
customers to their local distribution system; and as a result, Koch
Gateway no longer provides natural gas service to these farm tap
customers for Entex from the facilities proposed herein for
abandonment.
Any person or the Commission's Staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214), a motion
to intervene or notice of intervention and pursuant to Section 157.205
of the Regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the allowed time, the proposed
activities shall be deemed to be authorized effective the day after the
time allowed for filing a protest. If a protest is filed and not
withdrawn 30 days after the time allowed for filing a protest, the
instant request shall be treated as an application for authorization
pursuant to Section 7 of the NGA.
David P. Boergers,
Secretary.
[FR Doc. 99-10403 Filed 4-23-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 04/26/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-10403
- Pages:
- 20284-20284 (1 pages)
- Docket Numbers:
- Docket No. CP99-318-000
- PDF File:
-
99-10403.pdf