2016-09742. Submission for OMB Review; Schedules for Construction Contracts  

  • Start Preamble

    AGENCY:

    Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

    ACTION:

    Notice of request for public comment regarding an extension to an existing OMB clearance.

    SUMMARY:

    Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a previously approved information collection requirement concerning schedules for construction contracts. A notice was published in the Federal Register at 81 FR 7799 on February 16, 2016. No comments were received.

    DATES:

    Submit comments on or before May 27, 2016.

    ADDRESSES:

    Submit comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Office of Information and Regulatory Affairs of OMB, Attention: Desk Officer for GSA, Room 10236, NEOB, Washington, DC 20503. Additionally submit a copy to GSA by any of the following methods:

    Submit comments via the Federal eRulemaking portal by searching the OMB control number. Select the link “Submit a Comment” that corresponds with “Information Collection 9000-0058, Schedules for Construction Contracts”. Follow the instructions provided at the “Submit a Comment” screen. Please include your name, company name (if any), and “Information Collection 9000-0058, Schedules for Construction Contracts” on your attached document.

    • Mail: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street NW., Washington, DC 20405. ATTN: Ms. Flowers/IC 9000-0058, Schedules for Construction Contracts.

    Instructions: Please submit comments only and cite Information Collection 9000-0058, Schedules for Construction Contracts, in all correspondence related to this collection. Comments received generally will be posted without change to http://www.regulations.gov,, including any personal and/or business confidential information provided. To confirm receipt of your comment(s), please check www.regulations.gov,, approximately two to three days after submission to verify posting (except allow 30 days for posting of comments submitted by mail).

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Curtis E. Glover, Sr., Procurement Analyst, Office of Acquisition Policy, 202-501-1448 or email curtis.glover@gsa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    A. Purpose

    Federal construction contractors may be required to submit schedules, in the form of a progress chart, showing the order in which the Contractor proposes to perform the work. In accordance with FAR 52.236-15, Schedules for Construction Contracts, the Contractor shall, within five days after work commences on the contract or another period of time determined by the contracting officer, prepare and submit to the contracting officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plants, and equipment). This information is used to monitor progress under a Federal construction contract when other management approaches for ensuring adequate progress are not used. If the Contractor fails to submit a schedule within the time prescribes, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

    B. Annual Reporting Burden

    Respondents: 3,804.

    Responses per Respondent: 2.

    Annual Responses: 7,608.

    Hours per Response: 4.

    Total Burden Hours: 30,432.

    Affected Public: Businesses or other for-profit and not-for-profit institutions.

    Frequency: On occasion.

    Public comments are particularly invited on: Whether this collection of information is necessary for the proper performance of functions of the FAR, and whether it will have practical utility; whether our estimate of the public burden of this collection of information is accurate, and based on valid assumptions and methodology; ways to enhance the quality, utility, and clarity of the information to be collected; and ways in which we can minimize the burden of the collection of information on those who are to respond, through the use of appropriate technological collection techniques or other forms of information technology.

    Obtaining Copies of Proposals: Requesters may obtain a copy of the information collection documents from the General Services Administration, Regulatory Secretariat (MVCB), 1800 F Street NW., Washington, DC 20405, telephone 202-501-4755. Please cite OMB Control No. 9000-0058, Schedules for Construction Contracts, in all correspondence.

    Start Signature
    Start Printed Page 24816

    Dated: April 21, 2016.

    Lorin S. Curit,

    Director, Federal Acquisition Policy Division, Office of Governmentwide Acquisition Policy, Office of Acquisition Policy, Office of Governmentwide Policy.

    End Signature End Supplemental Information

    [FR Doc. 2016-09742 Filed 4-26-16; 8:45 am]

    BILLING CODE 6820-EP-P

Document Information

Published:
04/27/2016
Department:
National Aeronautics and Space Administration
Entry Type:
Notice
Action:
Notice of request for public comment regarding an extension to an existing OMB clearance.
Document Number:
2016-09742
Dates:
Submit comments on or before May 27, 2016.
Pages:
24815-24816 (2 pages)
PDF File:
2016-09742.pdf