98-11228. Drawbridge Operation Regulations; Wicomico River (North Prong)  

  • [Federal Register Volume 63, Number 81 (Tuesday, April 28, 1998)]
    [Rules and Regulations]
    [Pages 23215-23216]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-11228]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD05-98-026]
    
    
    Drawbridge Operation Regulations; Wicomico River (North Prong)
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Fifth Coast Guard District has issued a 
    temporary deviation from the regulations governing the operation of the 
    Main Street drawbridge across the Wicomico River, mile 22.4, in 
    Salisbury, Maryland. Beginning April 21, 1998, through May 19, 1998, 
    this deviation requires three-hours advance notice for drawbridge 
    openings from 9 a.m. through 3 p.m. on weekdays and from 7 p.m. on 
    Fridays through 6 a.m. on Mondays. This deviation is necessary to allow 
    the contractor to paint the bridge.
    
    DATES: This deviation is effective from April 21, 1998 through May 19, 
    1998.
    
    FOR FURTHER INFORMATION CONTACT:
    Ann B. Deaton, Bridge Administrator, Fifth Coast Guard District, at 
    (757) 398-6222.
    
    SUPPLEMENTARY INFORMATION: Textar Painting Corporation, a contractor 
    for the Maryland Department of Transportation, requested the Coast 
    Guard to approve a temporary deviation from the normal operation of the 
    bridge in order to accommodate painting the structure. To paint the 
    bridge, a barge must be used which will block the waterway. Three-hours 
    advance notice will be required to move the barge out of the channel 
    and open the bridge during the requested time periods.
        This deviation will not significantly disrupt vessel traffic, since 
    very little exists during this time of the year. The regulations at 33 
    CFR 117.579 require the draw to open on signal except from 7 a.m. to 9 
    a.m., from 12 noon to 1 p.m.,
    
    [[Page 23216]]
    
    and from 4 p.m. to 6 p.m. During these time periods the draw opens only 
    for tugs with tows if at least three-hours advance notice is given, and 
    the reason for passage through the bridge during a closure period is 
    due to delay caused by inclement weather or other emergency or 
    unforeseen circumstances.
        From April 21, 1998, through May 19, 1998, this deviation requires 
    three-hours advance notice for openings of the Wicomico River Main 
    Street Bridge from 9 a.m. through 3 p.m. on weekdays and from 7 p.m. on 
    Fridays through 6 a.m. on Mondays.
    
        Dated: April 17, 1998.
    J. Carmichael,
    Captain, U.S. Coast Guard, Acting Commander, Fifth Coast Guard 
    District.
    [FR Doc. 98-11228 Filed 4-27-98; 8:45 am]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
4/21/1998
Published:
04/28/1998
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
98-11228
Dates:
This deviation is effective from April 21, 1998 through May 19, 1998.
Pages:
23215-23216 (2 pages)
Docket Numbers:
CGD05-98-026
PDF File:
98-11228.pdf
CFR: (1)
33 CFR 117